5,710 research outputs found

    An optimal algorithm for the weighted backup 2-center problem on a tree

    Full text link
    In this paper, we are concerned with the weighted backup 2-center problem on a tree. The backup 2-center problem is a kind of center facility location problem, in which one is asked to deploy two facilities, with a given probability to fail, in a network. Given that the two facilities do not fail simultaneously, the goal is to find two locations, possibly on edges, that minimize the expected value of the maximum distance over all vertices to their closest functioning facility. In the weighted setting, each vertex in the network is associated with a nonnegative weight, and the distance from vertex uu to vv is weighted by the weight of uu. With the strategy of prune-and-search, we propose a linear time algorithm, which is asymptotically optimal, to solve the weighted backup 2-center problem on a tree.Comment: 14 pages, 4 figure

    An Approximately Optimal Algorithm for Scheduling Phasor Data Transmissions in Smart Grid Networks

    Full text link
    In this paper, we devise a scheduling algorithm for ordering transmission of synchrophasor data from the substation to the control center in as short a time frame as possible, within the realtime hierarchical communications infrastructure in the electric grid. The problem is cast in the framework of the classic job scheduling with precedence constraints. The optimization setup comprises the number of phasor measurement units (PMUs) to be installed on the grid, a weight associated with each PMU, processing time at the control center for the PMUs, and precedence constraints between the PMUs. The solution to the PMU placement problem yields the optimum number of PMUs to be installed on the grid, while the processing times are picked uniformly at random from a predefined set. The weight associated with each PMU and the precedence constraints are both assumed known. The scheduling problem is provably NP-hard, so we resort to approximation algorithms which provide solutions that are suboptimal yet possessing polynomial time complexity. A lower bound on the optimal schedule is derived using branch and bound techniques, and its performance evaluated using standard IEEE test bus systems. The scheduling policy is power grid-centric, since it takes into account the electrical properties of the network under consideration.Comment: 8 pages, published in IEEE Transactions on Smart Grid, October 201

    Discrete Convex Functions on Graphs and Their Algorithmic Applications

    Full text link
    The present article is an exposition of a theory of discrete convex functions on certain graph structures, developed by the author in recent years. This theory is a spin-off of discrete convex analysis by Murota, and is motivated by combinatorial dualities in multiflow problems and the complexity classification of facility location problems on graphs. We outline the theory and algorithmic applications in combinatorial optimization problems

    The DUNE-ALUGrid Module

    Get PDF
    In this paper we present the new DUNE-ALUGrid module. This module contains a major overhaul of the sources from the ALUgrid library and the binding to the DUNE software framework. The main changes include user defined load balancing, parallel grid construction, and an redesign of the 2d grid which can now also be used for parallel computations. In addition many improvements have been introduced into the code to increase the parallel efficiency and to decrease the memory footprint. The original ALUGrid library is widely used within the DUNE community due to its good parallel performance for problems requiring local adaptivity and dynamic load balancing. Therefore, this new model will benefit a number of DUNE users. In addition we have added features to increase the range of problems for which the grid manager can be used, for example, introducing a 3d tetrahedral grid using a parallel newest vertex bisection algorithm for conforming grid refinement. In this paper we will discuss the new features, extensions to the DUNE interface, and explain for various examples how the code is used in parallel environments.Comment: 25 pages, 11 figure

    Robust Fault Tolerant uncapacitated facility location

    Get PDF
    In the uncapacitated facility location problem, given a graph, a set of demands and opening costs, it is required to find a set of facilities R, so as to minimize the sum of the cost of opening the facilities in R and the cost of assigning all node demands to open facilities. This paper concerns the robust fault-tolerant version of the uncapacitated facility location problem (RFTFL). In this problem, one or more facilities might fail, and each demand should be supplied by the closest open facility that did not fail. It is required to find a set of facilities R, so as to minimize the sum of the cost of opening the facilities in R and the cost of assigning all node demands to open facilities that did not fail, after the failure of up to \alpha facilities. We present a polynomial time algorithm that yields a 6.5-approximation for this problem with at most one failure and a 1.5 + 7.5\alpha-approximation for the problem with at most \alpha > 1 failures. We also show that the RFTFL problem is NP-hard even on trees, and even in the case of a single failure

    DCCast: Efficient Point to Multipoint Transfers Across Datacenters

    Get PDF
    Using multiple datacenters allows for higher availability, load balancing and reduced latency to customers of cloud services. To distribute multiple copies of data, cloud providers depend on inter-datacenter WANs that ought to be used efficiently considering their limited capacity and the ever-increasing data demands. In this paper, we focus on applications that transfer objects from one datacenter to several datacenters over dedicated inter-datacenter networks. We present DCCast, a centralized Point to Multi-Point (P2MP) algorithm that uses forwarding trees to efficiently deliver an object from a source datacenter to required destination datacenters. With low computational overhead, DCCast selects forwarding trees that minimize bandwidth usage and balance load across all links. With simulation experiments on Google's GScale network, we show that DCCast can reduce total bandwidth usage and tail Transfer Completion Times (TCT) by up to 50%50\% compared to delivering the same objects via independent point-to-point (P2P) transfers.Comment: 9th USENIX Workshop on Hot Topics in Cloud Computing, https://www.usenix.org/conference/hotcloud17/program/presentation/noormohammadpou
    • …
    corecore