2,340 research outputs found

    Relaxation Adaptive Memory Programming For The Resource Constrained Project Scheduling Problem

    Get PDF
    The resource constrained project scheduling problem (RCPSP) is one of the most intractable problems in operations research; it is NP-hard in the strong sense. Due to the hardness of the problem, exact solution methods can only tackle instances of relatively small size. For larger instances commonly found in real applications heuristic solution methods are necessary to find near-optimal solutions within acceptable computation time limits. In this study algorithms based on the relaxation adaptive memory programming (RAMP) method (Rego, 2005) are developed for the purpose of solving the RCPSP. The RAMP algorithms developed here combine mathematical relaxation, including Lagrangian relaxation and surrogate constraint relaxation, with tabu search and genetic algorithms. Computational tests are performed on an extensive set of benchmark instances. The results demonstrate the capability of the proposed approaches to the solution of RCPSPs of different sizes and characteristics and provide meaningful insights to the potential application of these approaches to other more complex resource-constrained scheduling problems

    Evolutionary techniques applied to the optimal short-term scheduling of the electrical energy production

    Get PDF
    This paper presents an evolutionary technique applied to the optimal short-term scheduling (24 h) of the electric energy production. The equations that define the problem lead to a non-convex non-linear programming problem with a high number of continuous and discrete variables. Consequently, the resolution of the problem based on combinatorial methods is rather hard. The required heuristics, introduced to assure the feasibility of the constraints, are analyzed, along with a brief description of the proposed genetic algorithm (GA). The GA is used to compute the optimal on/off status of thermal units and the fitness function is obtained by solving a quadratic programming problem by means of a standard non-linear Interior Point (IP) method. The results from real-world cases based on the Spanish power system are reported, which show the good performance of the proposed algorithm, taking into account the complexity and dimensionality of the problem. Finally, an IP algorithm is adapted to deal with discrete variables that appear in this problem and the obtained results are compared with that of the proposed GA.Ministerio de Ciencia y Tecnología TIN2004-00159Junta de Andalucia ACPAI-2003/032Junta de Andalucia P05-TIC-0053

    Network Maintenance and Capacity Management with Applications in Transportation

    Get PDF
    abstract: This research develops heuristics to manage both mandatory and optional network capacity reductions to better serve the network flows. The main application discussed relates to transportation networks, and flow cost relates to travel cost of users of the network. Temporary mandatory capacity reductions are required by maintenance activities. The objective of managing maintenance activities and the attendant temporary network capacity reductions is to schedule the required segment closures so that all maintenance work can be completed on time, and the total flow cost over the maintenance period is minimized for different types of flows. The goal of optional network capacity reduction is to selectively reduce the capacity of some links to improve the overall efficiency of user-optimized flows, where each traveler takes the route that minimizes the traveler’s trip cost. In this dissertation, both managing mandatory and optional network capacity reductions are addressed with the consideration of network-wide flow diversions due to changed link capacities. This research first investigates the maintenance scheduling in transportation networks with service vehicles (e.g., truck fleets and passenger transport fleets), where these vehicles are assumed to take the system-optimized routes that minimize the total travel cost of the fleet. This problem is solved with the randomized fixed-and-optimize heuristic developed. This research also investigates the maintenance scheduling in networks with multi-modal traffic that consists of (1) regular human-driven cars with user-optimized routing and (2) self-driving vehicles with system-optimized routing. An iterative mixed flow assignment algorithm is developed to obtain the multi-modal traffic assignment resulting from a maintenance schedule. The genetic algorithm with multi-point crossover is applied to obtain a good schedule. Based on the Braess’ paradox that removing some links may alleviate the congestion of user-optimized flows, this research generalizes the Braess’ paradox to reduce the capacity of selected links to improve the efficiency of the resultant user-optimized flows. A heuristic is developed to identify links to reduce capacity, and the corresponding capacity reduction amounts, to get more efficient total flows. Experiments on real networks demonstrate the generalized Braess’ paradox exists in reality, and the heuristic developed solves real-world test cases even when commercial solvers fail.Dissertation/ThesisDoctoral Dissertation Industrial Engineering 201

    Application of Evolutionary Computation Techniques to the Optimal Short-Term Scheduling of the Electrical Energy Production

    Get PDF
    In this paper, an evolutionary technique applied to the optimal short-term scheduling (24 hours) of the electric energy production is presented. The equations that define the problem lead to a nonlinear mixed-integer programming problem with a high number of real and integer variables. Consequently, the resolution of the problem based on combinatorial methods is rather complex. The required heuristics, introduced to assure the feasibility of the constraints, are analyzed, along with a brief description of the proposed genetic algorithm. Finally, results from realistic cases based on the Spanish power system are reported, revealing the good performance of the proposed algorithm, taking into account the complexity and dimension of the problem

    Progress Toward Future Runway Management

    Get PDF
    The runway is universally acknowledged as a constraining factor to capacity in the National Airspace System (NAS). It follows that investigation of the effective use of runways, both in terms of selection and assignment, is paramount to the efficiency of future NAS operations. The need to address runway management is not a new idea; however, as the complexities of factors affecting runway selection and usage increase, the need for effective research in this area correspondingly increases. Under the National Aeronautics and Space Administration s Airspace Systems Program, runway management is a key research area. To address a future NAS which promises to be a complex landscape of factors and competing interests among users and operators, effective runway management strategies and capabilities are required. This effort has evolved from an assessment of current practices, an understanding of research activities addressing surface and airspace operations, traffic flow management enhancements, among others. This work has yielded significant progress. Systems analysis work indicates that the value of System Oriented Runway Management tools is significantly increased in the metroplex environment over that of the single airport case. Algorithms have been developed to provide runway configuration recommendations for a single airport with multiple runways. A benefits analysis has been conducted that indicates the SORM benefits include supporting traffic growth, cost reduction as a result of system efficiency, NAS optimization from metroplex operations, fairness in aircraft operations, and rational decision making
    corecore