111 research outputs found

    Uncertainty of the implementation time of geodynamic monitoring system in multi-criteria ranking of alternatives

    Get PDF
    The paper deals with the problem of ranking alternatives to geodynamic monitoring systems in the case of uncertainty of their implementation time. The problem is characterized by the fact that the choice of alternatives and the effect of it depends on the quality properties of the applied organizational and technical solutions, taking into account the time of implementation. The ordering of alternatives is proposed taking into account the uncertainty of the implementation time factors. Ranking is realized by comparing the trees of functional characteristics of alternatives taking into account the compliance of their characteristics with time-varying requirement

    Spatio-temporal data processing of automated geodynamic monitoring system

    Get PDF
    System In this paper, an approach to the organization of spatial-temporal processing of geoelectrical data in the system of automated geodynamic control is considered. It allows combining methodical, algorithmic, program and information support of the processes of collecting and processing of geodynamic information at subjects to contro

    Information-hardware support of systems of the automated electromagnetic monitoring of geodynamic objects

    Get PDF
    In article the structure of an informational-hardware support of the automated system of data processing at electromagnetic monitoring of geodynamic objects is considered. The structure of interrelations of the object-oriented and serving subsystems realizing methodological, program and technical and information support of processes of filing and data processing of geodynamic monitoring is define

    Geodynamic monitoring of development of a karst on the basis of georadar sounding

    Get PDF
    The questions of practical application of georadar sounding for the detailed studying of development of a karst were considered in the article. The importance of the problem being solved for the planning of construction and further operation of industrial facilities in karst limestone areas is emphasized. In the last case, the geodynamic control of karst zones is necessary, as operation of objects in these zones is economi

    Approach to the choice of modernization directions for the system of geodynamic monitoring in cases of using components intensity uncertainty

    Get PDF
    The problem of the optimum choice of the modernization directions for geodynamic monitoring systems, which is solved in the conditions of changing the parameters of natural-technical systems (NTS) is considered in the work. The solution of the task is creating a list of the components modernization directions and validate ranking the most effective of them. As criterion of modernization the value of decrease in resource intensity of subsystem application is usin

    The registration and the processing of signals of geomagnetic pulsations in the system of the geodynamic monitoring

    Get PDF
    Annotation: In this paper, methods of the implementing filtering are considered for recording of irregular disturbances of the geomagnetic field. The solution of problems of the processing of signals is considered for the system of the geodynamic control. They are based on the detection of the informative area of the registration in real time and the localization of the spatial location of the source of geomagnetic disturbances on the base of the regression analysis. It is noted that methods of simultaneous formation of borders of the bands of HPF and LPF necessary to use with the technical implementation of multi-band filtering. It allows to obtain the absolutely exact conjugation of frequency borders of neighboring subbands of filter, and also to reduce the number of tunable passive elements. Determined that in the technical implementation of the approach, obtaining an arbitrary phase-frequency characteristic that is not related to the amplitude-frequency response, and ensuring the stability of a multi-band filter of high order is important. Application of the regression analysis for selection and an assessment of parameters of distribution of geomagnetic pulsations at magnetotelluric sounding give the chance to consider features of use in system of monitoring of multirange filters and algorithms of spectral timing analysis.Keywords: geomagnetic field, disturbance, registration, processing, signal, geodynamic, monitoring, magnetotelluri

    The forecasting of the development of suffosion processes in urban on the basis of the geoelectric modeling by the data of the phasometric system of the geodynamic control

    Get PDF
    In this article, techniques and algorithms of the control and forecasting of the karst risk of the territory are considered. The formation of forecast assessments of the development of suffosion processes is carried out on the basis of the computer modeling with the correction of model data on the flexible schedule by results of the monitorin

    Delineating ground deformation over the Tengiz oil field, Kazakhstan, using the Intermittent SBAS (ISBAS) DInSAR algorithm

    Get PDF
    Changes in subsurface pore pressures and stresses due to the extraction of hydrocarbons often cause deformation over oil and gas fields. This can have significant consequences, including ground subsidence, induced seismicity and well failures. Geodynamic monitoring is an important requirement in recognising potential threats in sufficient time for remedial measures to be implemented. Differential interferometric synthetic aperture radar (DInSAR) is increasingly utilised for monitoring ground deformation over oil and gas reservoirs, achieving greater spatial coverage than traditional field-based surveying techniques. However, ground deformation over oil and gas fields can extend regionally into the surrounding rural landscape, where many conventional DInSAR techniques are of limited use due to the dynamic nature of the land cover. The Intermittent Small Baseline Subset (ISBAS) method is an advanced DInSAR technique, which considers the intermittent nature of coherence over dynamic land cover types to obtain markedly more ground motion measurements in non-urban regions. In this study, the ISBAS technique is used to delineate deformation over the super-giant Tengiz oil field in rural Kazakhstan. Analysis of ENVISAT data for 2004–2009 reveals a well-defined bowl subsiding with a maximum rate of −15.7 mm/year, corroborated by independent DInSAR studies and traditional levelling data. Subsequent application of ISBAS to Sentinel-1 data reveals significant evolution of deformation over the field in 2016–2017, with subsidence increasing dramatically to a maximum of -79.3 mm/year. The increased density of measurements obtained using the ISBAS technique enables accurate and comprehensive delineation and characterisation of ground deformation in this rural landscape, without the need for corner reflectors. This enhanced information could ultimately aid reservoir characterisation and management, and improve understanding of the risk posed by ground subsidence and fault reactivation

    EFFECTIVE SEDIMENT CONTROL IN A RESERVOIR

    Get PDF
    Sedimentation in a reservoir cannot be avoided. The average rate of sedimentation on the storage volume reduction of a reservoir in the world is about 1 % per year (Yoon,1992), meanwhile, the storage volume reduction in several reservoir in Indonesia reaches 1,64% to 2,83% per year (Atmojo,2012). These sediment’s accumulations in the reservoir will continually reduce the storage volume, thus the intended functions of reservoirs for flood control (Atmojo, 2013), irrigation and water supply, electric generation, etc. will also reduced and not optimal. Some of sediment control measures have been practiced in reducing sediment accumulation in reservoirs around the world. In principle, there are two approaches i.e., reduce the sediment input to a reservoir by land conservation, construction of check dam, sand pocket, diversion channel, etc. and reduce the sedimentation in the reservoir by sluicing, turbidity current, dredging, and flushing (Morris and Fan, 1998; Emamgholizadeh et al., 2006). This paper presents the performance of sediment’s reduction from a reservoir by flushing, sluicing, and disturbing flushing based on some laboratories results (Atmojo,2012). It is expected that this paper can contribute to elicits some finding on the selection of which suitable method for sediment reduction from a reservoir

    Compensation method of geodynamic trend in the systems of geoelectric control

    Get PDF
    Compensation method of geodynamic trend in the systems of geoelectric control To ensure the safety of important national economic objects in the conditions of technogenic, biogenic and anthropogenic interference, it is advisable to carry out automated electromagnetic control of geodynamic processes on the basis of multipolar sensing system
    corecore