17 research outputs found

    Melakukan Kegiatan Pustaka dalam Penyusun Kurikulum Teknik Elektro FT UKI

    Get PDF

    Melakukan Tugas Sebagai Profesor

    Get PDF

    RANCANG BANGUN SISTEM PEMBANGKIT LISTRIK TENAGA SURYA TERHUBUNG DENGAN JARINGAN LISTRIK PLN PADA KANTOR DI BINTARO - JAKARTA SELATAN

    Get PDF
    This paper discusses the design and construction of a solar powered generation system (PVs) in a 3-storey office building in the Bintaro area. The paper discusses  the costs  to build PVs, as well as an analysis of the value of investments using RETScreen Expert software. The calculation to get the PVs capacity is based on the area of ​​the roof and the electricity load of the office. This PV system will be integrated with the PLN electricity network in serving electricity loads in offices on each floor. The type of PV module has 305Wp capacity per module. The investment value is simulated with the assumption that  battery units are replacemed every 3 years, repayment of the loan for 10 years with an advance of 50%, an interest rate of 5.75% and inflation of 3.28%. From the simulation we also obtained a comparison of investments between replacing the battery units once every 3 years with every 10 years, which became the basis for the decision of the PLTS owner to determine the scheme to be choiced.Makalah ini membahas tentang perancangan dan pembangunan sistem pembangkit listrik tenaga surya (PLTS) pada gedung kantor 3-lantai di kawasan Bintaro. Isi makalah mencakup pembahasan tentang biaya yang dikeluarkan untuk membangun PLTS, serta analisis nilai investasinya dengan menggunakan software RETScreen Expert. Perhitungan untuk mendapatkan kapasitas PLTS didasarkan pada luas atap dan beban listrik kantor tersebut. Sistem PLTS ini akan diintegrasikan dengan jaringan listrik Perusahaan Listrik Negara (PLN) dalam melayani beban listrik pada kantor di setiap lantai lantai.  Jenis modul Photovoltaic (PV) yang digunakan kapasitas 305 Wp per modul. Nilai investasi disimulasikan dengan asumsi penggantian baterai setiap 3 tahun, pelunasan pinjaman selama 10 tahun dengan uang muka 50%, suku bunga sebesar 5,75% dan inflasi sebesar 3,28%. Dari simulasi juga diperoleh pembandingan investasi antara penggantian baterai 3 tahun sekali dengan 10 tahun sekali, yang menjadi dasar keputusan bagi pihak pemilik PLTS untuk menetapkan skema pilihannya

    Kebijakan Dalam Penyusunan Peta jalan Bagi Riset Dan Pengembangan Energi Terbarukan Di Indonesia Sebuah Usulan

    Get PDF
    Dengan jumlah penduduknya yang lebih dari 250 juta jiwa dan kondisi cadangan energi fosil yang semakin menipis, penyusunan roadmap (peta jalan)dalam menyiapkan energi pengganti energi fosil menjadi sangat penting untuk segera disusun. Makalah ini membahas sejumlah pertimbangan yang cukup penting sebagai acuan kebijakan dalam menyusun peta jalan tersebut. Pertimbangan tersebut tidak hanya menyangkut energi alternatif terbarukan yang prospektif dan terdapat di Indonesia, juga mencakup pertimbangan atas pengalaman negara-negara lain yang sudah melakukannya lebih dahulu sebelum digunakan di Indonesi

    Analisis Ketahanan Energi Kantor Pemasaran Podomoro Golf View Dengan Penerapan Pembangkit Listrik Tenaga Mikro Hidro Head Rendah di Bendung Cikeas - Cimanggis

    Get PDF
    Sungai dengan kapasitas besar dan head rendah belum dimanfaatkan secara maksimal sebagai alternatif pembangkit listrik yang ramah lingkungan, termasuk Sungai Cikeas yang berada dalam kawasan pengembangan hunian Podomoro Golf View (PGV) Cimanggis. Dengan penerapan teknologi turbin propeller head rendah yang dikembangkan oleh Pusat Penelitian Tenaga Listrik dan Mekatronik Lembaga Ilmu Pengetahuan Indonesia (LIPI), daya efektif masing-masing turbin sebesar 500 watt, Sungai Cikeas berpotensi membangkitkan listrik dengan daya efektif sebesar 8 kW, dengan menggunakan 16 unit turbin propeller. Kajian ini menganalisis tingkat ketahanan energi di Kantor Pemasaran PGV dengan penerapan Pembangkit Listrik Tenaga Mikro Hidro(PLTMH) dengan turbin propeller head rendah pada bendung Cikeas dikawasan PGV dari sudut pandang ketahanan energi. Penilaian akan dilakukan atas 4 (empat) aspek ketahanan energi yaitu availibility, accessibility, affordibility dan acceptability, berdasarkan definisi ketahanan energi dalam Peraturan Pemerintah Nomor 79 (PP No. 79) tahun 2014 tentang “Kebijakan Energi Nasional”. Hasil analisis ketahanan energi didapat: aspek availability dengan indikator ketersediaan listrik: Perseroan Terbatas Perusahaan Listrik Negara (PLN) = 0.999, PLTMH = 0.6; aspek accessability dengan indikator jarak dari sumber energi ke beban: PLN = 0.84, PLTMH = 0.7; aspek affordability dengan indikator harga satuan energi listrik: PLN = 0.89, PLTMH = 0.95; aspek accessability dengan dua indikator, yaitu emisi gas karbon dioksida (CO2): PLN = 0.12, PLTMH = 1, dan objek pariwisata: PLN = 0.96, PLTMH = 0.99

    Legal Analysis of Development in Organizational Ambidexterity in Higher Education Institutions

    Get PDF
    Ambidexterity plays an important role in organizational development, which influences national development. National development is a joint effort between the people and the state which is carried out in order to improve themselves in a better direction together. The aim of this research is to analyze the law of organizational amidecsterity development in higher education institutions. This research is part of a qualitative research using a systematic review approach. Systematic review is a method that uses previous evidence-based evidence through review, evaluation, structured evaluation, classification and categorization. The results of the research analysis show that the ambidexterity of higher education institutions is a model that integrates the performance determinants of classy higher education institutions, and proposes a commitment that is influenced by: (a) brand ambidexterity, which is explorative and exploitative oriented; (b) able to adapt to the social and economic environment; and (c) being responsive to students' perceptions of the university's brand image and reputation which will increase their commitment to their studies. The implication of this research is to provide an overview to higher education institutions so they can develop the concept of ambidexterity in the process of implementing higher education Keywords: Development Law, Ambidexterity, Higher Education, National Developmen

    Effect of Carbon Tax on Energy Security in the Long Term Energy Sector Development of Indonesia

    Get PDF
    This paper develops an AIM/Enduse model for Indonesia to analyze the implications of considering carbon tax on energy security in energy sector development of Indonesia during 2005-2035. This paper also analyzes the environmental implications of introducing carbon tax and the diversification of energy use in the power sector due to carbon tax. The result show that the energy security in Indonesia would increase with the introduction of carbon tax. The energy security index (i.e., Shannon-Weiner Index) at carbon tax rate of US200/tCinyear2035wouldbe1.473whichishigherthanthoseatcarbontaxrateslowerthanUS200/tC in year 2035 would be 1.473 which is higher than those at carbon tax rates lower than US200/tC and the base case. In the power sector, the diversification of energy use in the power sector would fluctuate at selected carbon tax rates

    Tinjauan terhadap lampu Fluorescent (Lampu TL) Ballast Konvensional tanpa dan Dengan Kapasitor Serta Ballast Elektronik dari Berbagai Merek

    Get PDF
    Pada saat ini hampir semua lampu fluorescent menggunakan ballast konvensional yang secara umum jenis ballast ini mempunyai faktor daya rendah. Untuk menghemat energi listrik, masyarakat disarankan menggunakan peralatan listrik yang lebih efisien pada sektor rumah tangga, misalnya alat penerangan menggunakan lampu hemat energi (LHE). Lampu hemat energi adalah lampu jenis fluorescent atau lebih dikenal dengan lampu neon yang ballastnya (ballast konvensional) diganti dengan ballast elektronik. Penelitian dilakukan terhadap ballast konvensional dalam rangka melihat pengaruh perbaikan faktor daya pada ballast konvensional (faktor daya yang sama dengan faktor daya ballast elektronik) dimana perbaikan faktor daya dilakukan dengan menggunakan kapasitor yang dihubungkan secara paralel dengan lampu TL. Hasil penelitian memperlihatkan bahwa penambahan kapasitor pada ballast konvensional 18 W maupun 36 W untuk membuat faktor daya sama dengan faktor ballast elektronik dapat memperkecil konsumsi daya. Konsumsi daya pada ballast konvensional baik tanpa kapasitor dan dengan kapasitor lebih besar dari ballast elektronik. Kuat cahaya yang dihasilkan lampu 18 W dengan ballast konvensional lebih besar baik dari pada ballast elektronik, sedangkan untuk lampu 36 W ballast elektronik lebih besar dari dengan ballast konvensional. Penurunan tegangan dari 220 volt ke 208 volt menyebabkan penurunan konsumsi arus dan daya serta kuat cahaya juga turun, namun demikian lampu masih berfungsi dengan baik

    Energy Security Implications of Introducing Renewable Portfolio Standard in Indonesia

    Get PDF
    An AIM/Enduse model has been developed to examine the implications of considering renewable portfolio standard (RPS) in Indonesia on energy security. Three levels of RPS are considered in this study, i.e., 15%, 25%, and 35%, while the planning horizon of analysis is from 2005 to 2035. The energy security is measured based on the diversification of energy use in the total primary energy supply (TPES). The diversification of energy use is measured by using Shannon-Weiner Index (SWI). The results show that the SWI would increase with the introduction of RPS. The SWI at the base case during the planning horizon would be 1.325, and would increase to 1.443, 1.553, and 1.621 if RPS of 15%, 25%, and 35% are considered respectively. The Shannon-Weiner Indices increase due to an increased share of renewable energy, such as wind, pv, biomass, and nuclear to the total energy use in the power sector
    corecore