4,339 research outputs found

    Ensayo sobre el problema universitario en Canarias

    Full text link

    Adaptive neurofuzzy ANFIS modeling of laser surface treatments

    Get PDF
    This paper introduces a new ANFIS adaptive neurofuzzy inference model for laser surface heat treatments based on the Green’s function. Due to its high versatility, efficiency and low simulation time, this model is suitable not only for the analysis and design of control systems, but also for the development of an expert real time supervision system that would allow detecting and preventing any failure during the treatment

    Portable low profile antenna at X-band

    Get PDF
    An antenna which has been conceived as a portable system for satellite communications based on the recommendations ITU-R S.580-6 and ITU-R S.465-5 for small antennas, i.e., with a diameter lower than 50 wavelengths, is introduced. It is a planar and a compact structure with a size of 40×40×2 cm. The antenna is formed by an array of 256 printed elements covering a large bandwidth (14.7%) at X-Band with a VSWR of 1.4:1. The specification includes transmission (Tx) and reception (Rx) bands simultaneously. The printed antenna has a radiation pattern with a 3dB beamwidth of 5°, over a 31dBi gain, and a dual and an interchangeable circular polarization

    Efectos mecánicos en líneas eléctricas de alta tensión debidos a las corrientes de cortocircuito. Propuesta de un modelo de simulación del fenómeno

    Get PDF
    La respuesta mecánica de un sistema de transporte de energía eléctrica a las fuerzas de excitación debidas a las corrientes de cortocircuito se traduce en la puesta en movimiento de los cables portadores y en un sensible incremento de los esfuerzos que éstos soportan y que transmiten a los apoyos que los sustentan. La idealización del sistema físico real nos lleva a definir un modelo discreto que mediante el adecuado tratamiento implementado en ordenador permita cuantificar el problema. Un estudio de sensibilidad encaminado a determinar cómo afecta al comportamiento del sistema la variación de diversos parámetros y configuraciones de líneas nos permitirá un mejor conocimiento del fenómeno.The mechanical response of a power transport system electrical line to the exciting forces due to short-circuit currents usually results into motion of the flexible cables and a noticeable increase of the tensil forces which they bear and transmit to bearing supports. Idealization of the real physical system leads to define a discrete mechanical model which by adecuate mathematical treatment implemented on a computer will enable to quantify the problem. A sensitivity study directed to determinate how the behaviour of the system is affected by changes in various parameters and cable line configurations will provide a better understanding of the phenomenon. Study results are enclosed.Peer Reviewe

    Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective

    Get PDF
    In this paper we address the classical hybrid flow shop scheduling problem with makespan objective. As this problem is known to be NP-hard and a very common layout in real-life manufacturing scenarios, many studies have been proposed in the literature to solve it. These contributions use different solution representations of the feasible schedules, each one with its own advantages and disadvantages. Some of them do not guarantee that all feasible semiactive schedules are represented in the space of solutions –thus limiting in principle their effectiveness– but, on the other hand, these simpler solution representations possess clear advantages in terms of having consistent neighbourhoods with well-defined neighbourhood moves. Therefore, there is a trade-off between the solution space reduction and the ability to conduct an efficient search in this reduced solution space. This trade-off is determined by two aspects, i.e. the extent of the solution space reduction, and the quality of the schedules left aside by this solution space reduction. In this paper, we analyse the efficiency of the different solution representations employed in the literature for the problem. More specifically, we first establish the size of the space of semiactive schedules achieved by the different solution representations and, secondly, we address the issue of the quality of the schedules that can be achieved by these representations using the optimal solutions given by several MILP models and complete enumeration. The results obtained may contribute to design more efficient algorithms for the hybrid flow shop scheduling problem.Ministerio de Ciencia e Innovación DPI2016-80750-

    Using real-time information to reschedule jobs in a flowshop with variable processing times

    Get PDF
    Versión revisada. Embargo 36 mesesIn a time where detailed, instantaneous and accurate information on shop-floor status is becoming available in many manufacturing companies due to Information Technologies initiatives such as Smart Factory or Industry 4.0, a question arises regarding when and how this data can be used to improve scheduling decisions. While it is acknowledged that a continuous rescheduling based on the updated information may be beneficial as it serves to adapt the schedule to unplanned events, this rather general intuition has not been supported by a thorough experimentation, particularly for multi-stage manufacturing systems where such continuous rescheduling may introduce a high degree of nervousness in the system and deteriorates its performance. In order to study this research problem, in this paper we investigate how real-time information on the completion times of the jobs in a flowshop with variable processing times can be used to reschedule the jobs. In an exhaustive computational experience, we show that rescheduling policies pay off as long as the variability of the processing times is not very high, and only if the initially generated schedule is of good quality. Furthermore, we propose several rescheduling policies to improve the performance of continuous rescheduling while greatly reducing the frequency of rescheduling. One of these policies, based on the concept of critical path of a flowshop, outperforms the rest of policies for a wide range of scenarios.Ministerio de Ciencia e Innovación DPI2016-80750-

    Modular Planar Antenna at X-band for satellite communications

    Get PDF
    An antenna which has been conceived as a portable system for satellite communications based on the recommendations ITU-R S.580-6 [1] and ITU-R S.465-5 [2] for small antennas, i.e., with a diameter lower than 50 wavelengths, is introduced. It is a planar and a compact structure with a size of 40×40×2 cm. The antenna is formed by an array of 256 printed elements covering a large bandwidth (14.7%) at X-Band. The specification includes transmission (Tx) and reception (Rx) bands simultaneously. The printed antenna has a radiation pattern with a 3dB beamwidth of 5°, over a 31dBi gain, and a dual and an interchangeable circular polarizatio

    Setting a common due date in a constrained flowshop: A variable neighbourhood search approach

    Get PDF
    In this paper we study a due date setting problem in a flowshop layout. The problem consists of scheduling a set of jobs arriving to the system together with jobs already present (denoted as old jobs), in order to set a common due date for the new jobs. Since the old jobs have a common due date that must not be violated, our problem is a rescheduling problem with the objective of minimising the makespan of the new jobs (thus obtaining the tightest possible due date for the new jobs) and a constraint since the maximum tardiness of the old jobs must be equal to zero. This approach leads to an interesting scheduling problem in which two different objectives are considered, each one for a subset of the jobs that must be scheduled. To the best of our knowledge, this type of problems have been scarcely considered in the literature, and only for very specific purposes. Since our problem is clearly NP-hard, a new heuristic based on variable neighbourhood search (VNS) has been designed. The computational results show that our proposed heuristic outperforms two existing heuristic methods for similar problems in the literature.CICYT Project DPI2007-6134

    Order Scheduling with Tardiness Objective: Improved Approximate Solutions

    Get PDF
    The problem addressed in this paper belongs to the topic of order scheduling, in which customer orders --composed of different individual jobs-- are scheduled so the objective sought refers to the completion times of the complete orders. Despite the practical and theoretical relevance of this problem, the literature on order scheduling is not very abundant as compared to job scheduling. However, there are several contributions with the objectives of minimising the weighted sum of completion times of the orders, the number of late orders, or the total tardiness of the orders. In this paper, we focus in the last objective, which is known to be NP-hard and for which some constructive heuristics have been proposed. We intend to improve this state-of-the-art regarding approximate solutions by proposing two different methods: Whenever extremely fast (negligible time) solutions are required, we propose a new constructive heuristic that incorporates a look-ahead mechanism to estimate the objective function at the time that the solution is being built. For the scenarios where longer decision intervals are allowed, we propose a novel matheuristic strategy to provide extremely good solutions. The extensive computational experience carried out shows that the two proposals are the most efficient for the indicated scenarios

    A common framework and taxonomy for multicriteria scheduling problems with Interfering and competing Jobs: Multi-agent scheduling problems

    Get PDF
    Most classical scheduling research assumes that the objectives sought are common to all jobs to be scheduled. However, many real-life applications can be modeled by considering different sets of jobs, each one with its own objective(s), and an increasing number of papers addressing these problems has appeared over the last few years. Since so far the area lacks a uni ed view, the studied problems have received different names (such as interfering jobs, multi-agent scheduling, mixed-criteria, etc), some authors do not seem to be aware of important contributions in related problems, and solution procedures are often developed without taking into account existing ones. Therefore, the topic is in need of a common framework that allows for a systematic recollection of existing contributions, as well as a clear de nition of the main research avenues. In this paper we review multicriteria scheduling problems involving two or more sets of jobs and propose an uni ed framework providing a common de nition, name and notation for these problems. Moreover, we systematically review and classify the existing contributions in terms of the complexity of the problems and the proposed solution procedures, discuss the main advances, and point out future research lines in the topic
    corecore