791 research outputs found

    Literature-based priors for gene regulatory networks

    Get PDF
    Motivation: The use of prior knowledge to improve gene regulatory network modelling has often been proposed. In this paper we present the first research on the massive incorporation of prior knowledge from literature for Bayesian network learning of gene networks. As the publication rate of scientific papers grows, updating online databases, which have been proposed as potential prior knowledge in past rese-arch, becomes increasingly challenging. The novelty of our approach lies in the use of gene-pair association scores that describe the over-lap in the contexts in which the genes are mentioned, generated from a large database of scientific literature, harnessing the information contained in a huge number of documents into a simple, clear format. Results: We present a method to transform such literature-based gene association scores to network prior probabilities, and apply it to learn gene sub-networks for yeast, E. coli and Human organisms. We also investigate the effect of weighting the influence of the prior know-ledge. Our findings show that literature-based priors can improve both the number of true regulatory interactions present in the network and the accuracy of expression value prediction on genes, in comparison to a network learnt solely from expression data. Networks learnt with priors also show an improved biological interpretation, with identified subnetworks that coincide with known biological pathways. Contact

    Integrated workforce capacity and inventory management under temporary labor supply uncertainty

    Get PDF
    In a manufacturing environment with volatile demand, inventory management can be coupled with dynamic capacity adjustments for handling the fluctuations more effectively. In this study, we consider the problem of integrated capacity and inventory management under non-stationary stochastic demand and flexible capacity uncertainty. The capacity planning problem is investigated from the workforce planning perspective where the capacity can be temporarily increased by utilizing contingent workers from an external labor supply agency. The contingent capacity received from the agency is subject to an uncertainty, but the supply of a certain number of workers can be guaranteed through contracts. We formulate a dynamic programming model to make the optimal capacity decisions at a tactical level (permanent workforce size and contracted number of workers) as well as the operational level (number of workers to be requested from the external labor supply agency in each period), integrated with the optimal operational decision of how much to produce in each period. We analyze the characteristics of the optimal policies and we conduct an extensive numerical analysis that helps us provide several managerial insights

    Integrated workforce capacity and inventory management under temporary labor supply uncertainty

    Get PDF
    In a manufacturing environment with volatile demand, inventory management can be coupled with dynamic capacity adjustments for handling the fluctuations more effectively. In this study, we consider the problem of integrated capacity and inventory management under non-stationary stochastic demand and flexible capacity uncertainty. The capacity planning problem is investigated from the workforce planning perspective where the capacity can be temporarily increased by utilizing contingent workers from an external labor supply agency. The contingent capacity received from the agency is subject to an uncertainty, but the supply of a certain number of workers can be guaranteed through contracts. We formulate a dynamic programming model to make the optimal capacity decisions at a tactical level (permanent workforce size and contracted number of workers) as well as the operational level (number of workers to be requested from the external labor supply agency in each period), integrated with the optimal operational decision of how much to produce in each period. We analyze the characteristics of the optimal policies and we conduct an extensive numerical analysis that helps us provide several managerial insights

    Integrated workforce capacity and inventory management under labour supply uncertainty

    Get PDF
    In a manufacturing environment with volatile demand, inventory management can be coupled with dynamic capacity adjustments for handling the fluctuations more effectively. In this study, we consider the problem of integrated capacity and inventory management under non-stationary stochastic demand and capacity uncertainty. The capacity planning problem is investigated from the workforce planning perspective where the capacity can be temporarily increased by utilising contingent workers from an external labour supply agency. The contingent capacity received from the agency is subject to an uncertainty, but the supply of a certain number of workers can be guaranteed through contracts. There may also be uncertainty in the availability of the permanent and contracted workers due to factors such as absenteeism and fatigue. We formulate a dynamic programming model to make the optimal capacity decisions at a tactical level (permanent workforce size and contracted number of workers) as well as the operational level (number of workers to be requested from the external labour supply agency in each period), integrated with the optimal operational decision of how much to produce in each period. We analyse the characteristics of the optimal policies and we conduct an extensive numerical analysis that helps us provide several managerial insights

    Production and optical properties of liquid scintillator for the JSNS2^{2} experiment

    Full text link
    The JSNS2^{2} (J-PARC Sterile Neutrino Search at J-PARC Spallation Neutron Source) experiment will search for neutrino oscillations over a 24 m short baseline at J-PARC. The JSNS2^{2} inner detector will be filled with 17 tons of gadolinium-loaded liquid scintillator (LS) with an additional 31 tons of unloaded LS in the intermediate γ\gamma-catcher and outer veto volumes. JSNS2^{2} has chosen Linear Alkyl Benzene (LAB) as an organic solvent because of its chemical properties. The unloaded LS was produced at a refurbished facility, originally used for scintillator production by the RENO experiment. JSNS2^{2} plans to use ISO tanks for the storage and transportation of the LS. In this paper, we describe the LS production, and present measurements of its optical properties and long term stability. Our measurements show that storing the LS in ISO tanks does not result in degradation of its optical properties.Comment: 7 pages, 4 figures

    The K2K SciBar Detector

    Get PDF
    A new near detector, SciBar, for the K2K long-baseline neutrino oscillation expe riment was installed to improve the measurement of neutrino energy spectrum and to study neutrino interactions in the energy region around 1 GeV. SciBar is a 'fully active' tracking detector with fine segmentation consisting of plastic scintillator bars. The detector was constructed in summer 2003 and is taking data since October 2003. The basic design and initial performance is presented.Comment: 7 pages, 4figures, Contributed to Proceedings of the 10th Vienna Conference on Instrumentation, Vienna, February 16-21, 200

    Indications of Neutrino Oscillation in a 250 km Long-baseline Experiment

    Full text link
    The K2K experiment observes indications of neutrino oscillation: a reduction of νμ\nu_\mu flux together with a distortion of the energy spectrum. Fifty-six beam neutrino events are observed in Super-Kamiokande (SK), 250 km from the neutrino production point, with an expectation of 80.15.4+6.280.1^{+6.2}_{-5.4}. Twenty-nine one ring μ\mu-like events are used to reconstruct the neutrino energy spectrum, which is better matched to the expected spectrum with neutrino oscillation than without. The probability that the observed flux at SK is explained by statistical fluctuation without neutrino oscillation is less than 1%.Comment: 5 pages, 3 figures embedded, LaTeX with RevTeX style, accepted for publication in PRL on December 13, 200

    Measurement of single pi0 production in neutral current neutrino interactions with water by a 1.3 GeV wide band muon neutrino beam

    Full text link
    Neutral current single pi0 production induced by neutrinos with a mean energy of 1.3 GeV is measured at a 1000 ton water Cherenkov detector as a near detector of the K2K long baseline neutrino experiment. The cross section for this process relative to the total charged current cross section is measured to be 0.064 +- 0.001 (stat.) +- 0.007 (sys.). The momentum distribution of produced pi0s is measured and is found to be in good agreement with an expectation from the present knowledge of the neutrino cross sections.Comment: 6 pages, 4 figures, Submitted to Phys. Lett.
    corecore