876 research outputs found
Performance of a 128 channel analogue front-end chip for read-out of Si strip detector modules for LHC experiments
We present a 128-channel analogue front-end chip, SCT128A-HC, for readout of silicon strip detectors employed in the inner tracking detectors of the LHC experiment. The chip is produced in the radiation hard DMILL technology. The architecture of the chip and critical design issues are discussed. The performance of the chip has been evaluated in details in the test bench and is presented in the paper. The chip is used to read out prototype analogue modules compatible in size, functionality and performance with the ATLAS SCT base line modules. Several full size detector modules equipped with SCT128A-HC chips has been built and tested successfully in the lab with beta particles as well as in the test beam. The results concerning the signal-to-noise ratio, noise occupancy, efficiency and spatial resolution are presented. The radiation hardness issues are discussed. (5 refs)
Recommended from our members
CHERI Concentrate: Practical Compressed Capabilities
We present CHERI Concentrate, a new fat-pointer compression scheme applied to CHERI, the most developed capability-pointer system at present. Capability fat-pointers are a primary candidate for enforcing fine-grained and non-bypassable security properties in future computer systems, although increased pointer size can severely affect performance. Thus, several proposals for capability compression have been suggested but these did not support legacy instruction sets, ignored features critical to the existing software base, and also introduced design inefficiencies to RISC-style processor pipelines. CHERI Concentrate improves on the state-of-the-art region-encoding efficiency, solves important pipeline problems, and eases semantic restrictions of compressed encoding, allowing it to protect a full legacy software stack. We analyze and extend logic from the open-source CHERI prototype processor design on FPGA to demonstrate encoding efficiency, minimize delay of pointer arithmetic, and eliminate additional load-to-use delay. To verify correctness of our proposed high-performance logic, we present a HOL4 machine-checked proof of the decode and pointer-modify operations. Finally, we measure a 50%-75% reduction in L2 misses for many compiled C-language benchmarks running under a commodity operating system using compressed 128-bit and 64-bit formats, demonstrating both compatibility with and increased performance over the uncompressed, 256-bit format
Analogue read-out chip for Si strip detector modules for LHC experiments
We present a 128-channel analogue front-end chip SCTA128 for readout of silicon strip detectors employed in the inner tracking detectors of LHC experiments. The architecture of the chip and critical design issues are discussed. The performance of the chip has been evaluated in detail in bench tests and is presented in the paper. The chip is used to read out prototype analogue modules compatible in size, functionality and performance with the ATLAS SCT base line modules. Several full size detector modules equipped with SCTA128 chips have been built and tested successfully in the lab with E particles as well as in beam tests
Epidural Hematoma Following Cervical Spine Surgery.
STUDY DESIGN: A multicentered retrospective case series.
OBJECTIVE: To determine the incidence and circumstances surrounding the development of a symptomatic postoperative epidural hematoma in the cervical spine.
METHODS: Patients who underwent cervical spine surgery between January 1, 2005, and December 31, 2011, at 23 institutions were reviewed, and all patients who developed an epidural hematoma were identified.
RESULTS: A total of 16 582 cervical spine surgeries were identified, and 15 patients developed a postoperative epidural hematoma, for a total incidence of 0.090%. Substantial variation between institutions was noted, with 11 sites reporting no epidural hematomas, and 1 site reporting an incidence of 0.76%. All patients initially presented with a neurologic deficit. Nine patients had complete resolution of the neurologic deficit after hematoma evacuation; however 2 of the 3 patients (66%) who had a delay in the diagnosis of the epidural hematoma had residual neurologic deficits compared to only 4 of the 12 patients (33%) who had no delay in the diagnosis or treatment (P = .53). Additionally, the patients who experienced a postoperative epidural hematoma did not experience any significant improvement in health-related quality-of-life metrics as a result of the index procedure at final follow-up evaluation.
CONCLUSION: This is the largest series to date to analyze the incidence of an epidural hematoma following cervical spine surgery, and this study suggest that an epidural hematoma occurs in approximately 1 out of 1000 cervical spine surgeries. Prompt diagnosis and treatment may improve the chance of making a complete neurologic recovery, but patients who develop this complication do not show improvements in the health-related quality-of-life measurements
C5 Palsy After Cervical Spine Surgery: A Multicenter Retrospective Review of 59 Cases.
STUDY DESIGN: A multicenter, retrospective review of C5 palsy after cervical spine surgery.
OBJECTIVE: Postoperative C5 palsy is a known complication of cervical decompressive spinal surgery. The goal of this study was to review the incidence, patient characteristics, and outcome of C5 palsy in patients undergoing cervical spine surgery.
METHODS: We conducted a multicenter, retrospective review of 13 946 patients across 21 centers who received cervical spine surgery (levels C2 to C7) between January 1, 2005, and December 31, 2011, inclusive. P values were calculated using 2-sample t test for continuous variables and χ(2) tests or Fisher exact tests for categorical variables.
RESULTS: Of the 13 946 cases reviewed, 59 patients experienced a postoperative C5 palsy. The incidence rate across the 21 sites ranged from 0% to 2.5%. At most recent follow-up, 32 patients reported complete resolution of symptoms (54.2%), 15 had symptoms resolve with residual effects (25.4%), 10 patients did not recover (17.0%), and 2 were lost to follow-up (3.4%).
CONCLUSION: C5 palsy occurred in all surgical approaches and across a variety of diagnoses. The majority of patients had full recovery or recovery with residual effects. This study represents the largest series of North American patients reviewed to date
Silicon detector for a Compton Camera in Nuclear Medical Imaging
Electronically collimated gamma ca\-me\-ras based on Com\-pton scattering in silicon pad sensors may improve imaging in nuclear medicine and bio-medical research. The work described here concentrates on the silicon pad detector developed for a prototype Compton camera. The silicon pad sensors are read out using low noise VLSI CMOS chips and novel fast triggering chips. Depending on the application a light weight and dense packaging of sensors and its readout electronics on a hybrid is required. We describe the silicon pad sensor and their readout with the newly designed hybrid. %The silicon detector of a Compton camera %may contain up to ~analogue channels requiring %a fast and low cost data acquisition system. We also describe a modular and low-cost data acquisition system (CCDAQ) based on a digital signal processor which is interfaced to the EPP port of personal computers. Using the CCDAQ and the hybrids energy spectra of gamma-ray photons from technetium (Tc) and americium (Am) were acquired with an energy resolution of 2.45~keV FWHM for the 140.5~keV photo-absorption line of Tc. For all pads the discrimination threshold in the trigger chip was between (15 and 25)~keV
The Multi-Object, Fiber-Fed Spectrographs for SDSS and the Baryon Oscillation Spectroscopic Survey
We present the design and performance of the multi-object fiber spectrographs
for the Sloan Digital Sky Survey (SDSS) and their upgrade for the Baryon
Oscillation Spectroscopic Survey (BOSS). Originally commissioned in Fall 1999
on the 2.5-m aperture Sloan Telescope at Apache Point Observatory, the
spectrographs produced more than 1.5 million spectra for the SDSS and SDSS-II
surveys, enabling a wide variety of Galactic and extra-galactic science
including the first observation of baryon acoustic oscillations in 2005. The
spectrographs were upgraded in 2009 and are currently in use for BOSS, the
flagship survey of the third-generation SDSS-III project. BOSS will measure
redshifts of 1.35 million massive galaxies to redshift 0.7 and Lyman-alpha
absorption of 160,000 high redshift quasars over 10,000 square degrees of sky,
making percent level measurements of the absolute cosmic distance scale of the
Universe and placing tight constraints on the equation of state of dark energy.
The twin multi-object fiber spectrographs utilize a simple optical layout
with reflective collimators, gratings, all-refractive cameras, and
state-of-the-art CCD detectors to produce hundreds of spectra simultaneously in
two channels over a bandpass covering the near ultraviolet to the near
infrared, with a resolving power R = \lambda/FWHM ~ 2000. Building on proven
heritage, the spectrographs were upgraded for BOSS with volume-phase
holographic gratings and modern CCD detectors, improving the peak throughput by
nearly a factor of two, extending the bandpass to cover 360 < \lambda < 1000
nm, and increasing the number of fibers from 640 to 1000 per exposure. In this
paper we describe the original SDSS spectrograph design and the upgrades
implemented for BOSS, and document the predicted and measured performances.Comment: 43 pages, 42 figures, revised according to referee report and
accepted by AJ. Provides background for the instrument responsible for SDSS
and BOSS spectra. 4th in a series of survey technical papers released in
Summer 2012, including arXiv:1207.7137 (DR9), arXiv:1207.7326 (Spectral
Classification), and arXiv:1208.0022 (BOSS Overview
Obliquity pacing of the late Pleistocene glacial terminations
Author Posting. © The Authors, 2005. This is the author's version of the work. It is posted here by permission of Nature Publishing Group for personal use, not for redistribution. The definitive version was published in Nature 434 (2005): 491-494, doi:10.1038/nature03401.The timing of glacial/interglacial cycles at intervals of about 100,000 yr (100 kyr) is commonly attributed to control by Earth orbital configuration variations. This “pacemaker” hypothesis has inspired many models, variously depending upon Earth obliquity, orbital eccentricity, and precessional fluctuations, with the latter usually emphasized. A contrasting hypothesis is that glacial cycles arise primarily because of random internal climate
variability. Progress requires distinguishing between the more than 30 proposed models of the late Pleistocene glacial variations. Here we present a formal test of the pacemaker
hypothesis, focusing on the rapid deglaciation events known as terminations.
The null hypothesis that glacial terminations are independent of obliquity can be rejected
at the 5% significance level. In contrast, for eccentricity and precession, the corresponding null-hypotheses cannot be rejected. The simplest inference, consistent with the observations, is that ice-sheets terminate every second (80 kyr) or third (120 kyr) obliquity cycle — at times of high obliquity — and similar to the original Milankovitch assumption. Hypotheses
not accounting for the obliquity pacing are unlikely to be correct. Both stochastic
and deterministic variants of a simple obliquity-paced model describe the observations.PH is supported by the NOAA Postdoctoral Program in Climate and Global Change and CW in part by the National Ocean Partnership Program (ECCO)
- …