2,444 research outputs found

    A new technology for manufacturing scheduling derived from space system operations

    Get PDF
    A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility

    Technology requirements for an orbiting fuel depot: A necessary element of a space infrastructure

    Get PDF
    Advanced planning within NASA has identified several bold space exploration initiatives. The successful implementation of these missions will require a supporting space infrastructure which would include a fuel depot, an orbiting facility to store, transfer and process large quantities of cryogenic fluids. In order to adequately plan the technology development programs required to enable the construction and operation of a fuel depot, a multidisciplinary workshop was convened to assess critical technologies and their state of maturity. Since technology requirements depend strongly on the depot design assumptions, several depot concepts are presented with their effect on criticality ratings. Over 70 depot-related technology areas are addressed

    Sanctions for E-Discovery Violations: By the Numbers

    Get PDF
    This Article reviews our comprehensive survey of written opinions from cases in federal courts prior to January 1, 2010, involving motions for sanctions relating to the discovery of electronically stored information (ESI) We analyzed each case for various factors, including date, court, type of case, sanctioning authority, sanctioned party, sanctioned misconduct, sanction type, sanctions to counsel, if any, and the protections provided from sanctions by Federal Rule of Civil Procedure 37(e) The survey identified 401 sanction cases and 230 sanction awards and showed that sanction motions and awards have increased over time, particularly in the last five years Sanctions against counsel are rare but are also increasing Sanction motions have been filed in all types of cases and in courts across the country Failure to produce ESI is the most common basis for sanctions Courts have used a variety of different rules, statutes, and powers to sanction parties for e-disco very violations, including Rule 37 and the inherent power of the court, and courts impose many different sanction types on e-discovery violators, including the severe sanctions of dismissal, default Judgment, adverse jury instructions, and sizeable monetary awards Rule 37(e) has not provided broad protection from such sanction

    Sanctions for E-Discovery Violations: By the Numbers

    Get PDF
    This Article reviews our comprehensive survey of written opinions from cases in federal courts prior to January 1, 2010, involving motions for sanctions relating to the discovery of electronically stored information (ESI) We analyzed each case for various factors, including date, court, type of case, sanctioning authority, sanctioned party, sanctioned misconduct, sanction type, sanctions to counsel, if any, and the protections provided from sanctions by Federal Rule of Civil Procedure 37(e) The survey identified 401 sanction cases and 230 sanction awards and showed that sanction motions and awards have increased over time, particularly in the last five years Sanctions against counsel are rare but are also increasing Sanction motions have been filed in all types of cases and in courts across the country Failure to produce ESI is the most common basis for sanctions Courts have used a variety of different rules, statutes, and powers to sanction parties for e-disco very violations, including Rule 37 and the inherent power of the court, and courts impose many different sanction types on e-discovery violators, including the severe sanctions of dismissal, default Judgment, adverse jury instructions, and sizeable monetary awards Rule 37(e) has not provided broad protection from such sanction

    Man-machine interface analysis of the flight design system

    Get PDF
    The objective of the current effort was to perform a broad analysis of the human factors issues involved in the design of the Flight Design System (FDS). The analysis was intended to include characteristics of the system itself, such as: (1) basic structure and functional capabilities of FDS; (2) user backgrounds, capabilities, and possible modes of use; (3) FDS interactive dialogue, problem solving aids; (4) system data management capabilities; and to include, as well, such system related matters as: (1) flight design team structure; (2) roles of technicians; (3) user training; and (4) methods of evaluating system performance. Wherever possible, specific recommendations are made. In other cases, the issues which seem most important are identified. In some cases, additional analyses or experiments which might provide resolution are suggested

    How can marketing theory be applied to policy design to deliver on sustainable agriculture in England?

    Get PDF
    Marketing theory was applied to develop a qualitative tool to predict levels of compliance based on involvement with the issue (policy objective) and involvement with the intervention (regulation). Based on an understanding farmer decision-making, the I3 Response Framework can help identify strategies that can strongly influence compliance, providing more efficient targeting of resources for policy. We report on further testing by application to the issue of water quality and the regulations around slurry storage as part of the Nitrate Pollution Prevention Regulations 2008 as applicable to dairy farmers in the Derwent catchment of North Yorkshire, EnglandPolicy, I3 Response Framework, involvement, water quality, slurry storage, Nitrogen Vulnerable Zone, regulation, Nitrate Pollution Prevention Regulations 2008, NPPR2008, Agricultural and Food Policy,
    • …
    corecore