1,451 research outputs found

    Exploits in the tropics

    Get PDF
    https://place.asburyseminary.edu/firstfruitsheritagematerial/1163/thumbnail.jp

    Exploits in the tropics

    Get PDF
    https://place.asburyseminary.edu/ecommonsatsdigitalresources/1551/thumbnail.jp

    Ultra-broadband wavelength-swept Tm-doped fiber laser using wavelength-combined gain stages

    Get PDF
    A wavelength-swept thulium-doped fiber laser system employing two parallel cavities with two different fiber gain stages is reported. The fiber gain stages were tailored to provide emission in complementary bands with external wavelength-dependent feedback cavities sharing a common rotating polygon mirror for wavelength scanning. The wavelength-swept laser outputs from the fiber gain elements were spectrally combined by means of a dichroic mirror and yielded over 500 mW of output with a scanning range from ~1740 nm to ~2070 nm for a scanning frequency of ~340 Hz

    Developing a new look

    Get PDF

    Ethical development

    Get PDF

    Bridge distress caused by approach embankment settlement

    Get PDF
    Surtees Bridge, which carries the A66(T) over the River Tees near Thornaby-on-Tees in the UK, has been showing signs of distress that predate its opening in 1981. Subsequent investigations have shown that the bridge distress is related to unexpectedly large settlement of the eastern approach embankment. Recent ground investigations prompted by a proposed widening of the river crossing have produced many new data on the alluvial deposits underlying the site, and explain why embankment settlement was so much larger than originally anticipated. Comparison of the geotechnical parameters obtained from the original and more recent ground investigations suggests that the original investigation significantly underestimated the thickness of an alluvial clay layer underlying the site, and that its coefficient of consolidation was overestimated. Settlement analyses using geotechnical data from the original ground investigations predict moderate embankment settlements occurring principally during construction. Settlement analyses based on all the available data predict far larger embankment settlements occurring over extended time periods. The latter analyses predict an embankment settlement similar to that observed and of sufficient magnitude to cause the observed lateral displacement of the bridge due to lateral loading of its piled foundation
    • …
    corecore