124 research outputs found

    БЮДЖЕТНЕ ПЛАНУВАННЯ ЯК ЗАСІБ ЗАБЕЗПЕЧЕННЯ ЗБАЛАНСОВАНОСТІ ДЕРЖАВНОГО БЮДЖЕТУ

    Get PDF
    Розглянуто сутність перспективного бюджетного планування як складової бюджетної політики країни. Досліджено шляхи створення сприятливих умов для зростання ефективності економіки України. У статті запропоновані заходи щодо активізації бюджетного планування для оптимізації бюджетного дефіцитуThe article deals with the essence of long-term budgetary planning as a part of country’s budgetary policy. The author investigates ways for creating favorable conditions for raising the efficiency of the Ukrainian economy. The measures of activization of the budgetary planning for optimization the budget deficit are suggested

    Acceleration of lead ions in the CERN PS booster and the CERN PS

    Get PDF
    The new CERN Heavy Ion Accelerating Facility also requires besides a new Linac substantial modifications of existing accelerators. They are imposed by the low speed and the low intensity of the ion beam and, crucially at low energy, by the short lifetime of the partially stripped ions due to charge exchange with the atoms of the residual gas. The upgraded vacuum system hits the limits of a non-bakeable machine and consequently the acceleration had to be sped up by all means. In the Booster this led to injection and RF capture on a fast-rising magnet cycle and a new digital RF beam control system. Beam current transformers had to be replaced by new, heavily shielded ones. Other modifications include a new staircase magnet to distribute ions over the four Booster rings, lengthening of septa and kicker pulses, plus new, bakeable extraction septa and an energy stabilizing RF loop on the flat top in the CPS, and a stripper in the transfer line to the SPS

    A systematic review of methods used to study fish in saltmarsh flats

    Get PDF
    There is a growing body of research highlighting the importance of saltmarshes as habitats for fish for feeding, refuge from predation and reproduction. However, more work is needed on fish on vegetated marsh flats (or surfaces). We reviewed 60 studies that used 21 methods to sample fish assemblages on saltmarsh flats. Drop samplers, fyke nets and pop nets were most frequently employed, with considerably more studies being conducted in graminoid than succulent marsh. Reporting of sampling temporal and tidal details, environmental variables and fish attributes was inconsistent. Most of the papers focussed on one or more of conservation management, comparisons among habitat types, and the use of saltmarsh (including fish activity type or residency status). Important potential areas of research include the relationships between the fish assemblages of saltmarsh flats and coastal fisheries, the effects of invasive plant species and marsh restoration efforts in areas outside the United States, and the potential effects of sea-level rise on vegetated flats as fish habitat. Sampling methods that provide density measures are likely to be most useful for most of this research. Thus, drop samplers and pop nets are an appropriate choice, the former in graminoid saltmarshes and the latter in succulent saltmarshes

    Conversion of the PS complex as LHC proton pre-injector

    Get PDF
    CERNs Large Hadron Collider (LHC) [1][2] will be supplied with protons from the injector chain Linac2-PS Booster (PSB)-PS-SPS (Fig. 1). The required transverse beam brilliance (intensity/emittance) is almost twice that of current PS beams and the LHC bunch spacing of 25 ns must be impressed on the beam before its transfer to the SPS. The scheme involves new RF harmonics in the PSB and the PS, an increase of the PSB energy, and two-batch filling of the PS. After a successful test of the main ingredients, a project for converting the PS complex was launched in 1994. Major additions are (i) h=1 RF systems in the PSB, (ii) upgrading of the PSB main magnet supply from 1 to 1.4 GeV operation, (iii) new magnets, septa, power supplies, kicker pulsers for the PSB-PS beam transfer, (iv) 40 and 80 MHz systems in the PS, (v) beam profile measurement devices with improved resolution. A significant part of the effort is being provided by TRIUMF under the Canada-CERN co-operation agreement on the LHC

    The CERN PS multi-turn extraction based on beam splittting in stable islands of transverse phase space: Design Report

    Get PDF
    Since 2001 considerable effort has been devoted to the study of a possible replacement of the continuous-transfer extraction mode from the PS to the SPS. Such an approach, called Multi-Turn Extraction (MTE), is based on capture of the beam inside stable islands of transverse phase space, generated by sextupoles and octupoles, thanks to a properly chosen tune variation. Both numerical simulations and measurements with beam were performed to understand the properties of this new extraction mode. The experimental study was completed at the end of 2004 and by the end of 2005 a scheme to implement this novel approach in the PS machine was defined and its performance assessed. This design report presents the outcome of the studies undertaken both in terms of technical issues as well as of resources necessary to implement the proposed scheme

    The antiproton decelerator (AD), a simplified antiproton source (feasibility study)

    Get PDF
    In view of a possible future physics programme concerning antihydrogen a simplified scheme for the provision of antiprotons of a few MeV has been studied. It uses the present target area and the modified Antiproton Collector (AC) in its present location. In this report all the systems are reviewed and their modifications discussed

    An Antiproton Decelerator in the CERN PS Complex

    Get PDF
    The present CERN PS low-energy antiproton complex involves 4 machines to collect, cool, decelerate and supply experiments with up to 1010 antiprotons per pulse and per hour of momenta ranging from 0.1 to 2 GeV/c. In view of a possible future physics programme requiring low energy antiprotons, mainly to carry out studies on antihydrogen, a simplified scheme providing at low cost antiprotons at 100 MeV/c has been studied. It requires only one machine, the present Antiproton Collector (AC) converted into a cooler and decelerator (Antiproton Decelerator, AD) and delivering beam to experiments in the hall of the present Antiproton Accumulator Complex (AAC) [1]. This paper describes the feasibility study of such a scheme [2]

    The antiproton decelerator: AD

    Get PDF
    A simplified scheme for the provision of antiprotons at 100 MeV/c based on fast extraction is described. The scheme uses the existing production target area and the modified Antiproton Collector Ring in their current location. The physics programme is largely based on capturing and storing antiprotons in Penning traps for the production and spectroscopy of antihydrogen. The machine modifications necessary to deliver batches of 1 107 /min at 100 MeV/c are described. Details of the machine layout and the experimental area in the existing AAC Hall are given

    The PS complex produces the nominal LHC beam

    Get PDF
    The LHC [1] will be supplied, via the SPS, with protons from the pre-injector chain comprising Linac2, PS Booster (PSB) and PS. These accelerators have under-gone a major upgrading programme [2] during the last five years so as to meet the stringent requirements of the LHC. These imply that many high-intensity bunches of small emittance and tight spacing (25 ns) be available at the PS extraction energy (25 GeV). The upgrading project involved an increase of Linac2 current, new RF systems in the PSB and the PS, raising the PSB energy from 1 to 1.4 GeV, two-batch filling of the PS and the installation of high-resolution beam profile measurement devices. With the project entering its final phase and most of the newly installed hardware now being operational, the emphasis switches to producing the nominal LHC beam and tackling the associated beam physics problems. While a beam with transverse characteristics better than nominal has been obtained, the longitudinal density still needs to be increased. An alternative scheme to produce the 25 ns bunch spacing is outlined, together with other promising developments
    corecore