1,564 research outputs found

    Transformer Oil Passivation and Impact of Corrosive Sulphur

    No full text
    In recent years a significant volume of research has been undertaken in order to understand the recent failures in oil insulated power apparatus due to deposition of copper sulphide on the conductors and in the insulation paper. Dibenzyl Disulfide (DBDS) has been found to be the leading corrosive sulphur compound in the insulation oil [1]. The process of copper sulphide formation and the deposition in the paper is still being investigated, but a recently proposed method seems to be gaining some confidence [1]. This method suggests a two-step process; initially the DBDS and some oil soluble copper complexes are formed. Secondly the copper complexes are absorbed in the paper insulation, where they then decompose into copper sulphide [2]. The most commonly used mitigating technique for corrosive sulphur contaminated oil is passivation, normally using Irgamet 39 or 1, 2, 3-benzotriazole (BTA). The passivator is diluted into the oil to a concentration of around 100ppm, where it then reacts with the copper conductors to form a complex layer around the copper, preventing it from interacting with DBDS compounds and forming copper sulphide. This research project will investigate the electrical properties of HV transformers which have tested positive for corrosive sulphur, and the evolution of those properties as the asset degrades due to sulphur corrosion. Parallel to this the long term properties of transformers with passivated insulation oil will be analysed in order to understand the passivator stability and whether it is necessary to keep adding the passivator to sustain its performance. Condition monitoring techniques under investigation will include dielectric spectroscopy, frequency response analysis, recovery voltage method (aka interfacial polarisation) amongst others. Partial discharge techniques will not be investigated, as the voltage between the coil plates is low and therefore it will not contribute significantly to the overall insulation breakdown, in corrosive oil related faults [3]. The goal of this research is to establish key electrical properties in both passivated and non-passivated power transformers that demonstrate detectable changes as the equipment degrades due to the insulation oil being corrosive

    Kappa Opioid Regulation of Depressive-Like Behavior During Acute Withdrawal and Protracted Abstinence from Ethanol

    Get PDF
    The dynorphin/kappa opioid receptor (DYN/KOR) system appears to be a key mediator of the behavioral effects of chronic exposure to alcohol. Although KOR opioid receptor antagonists have been shown to decrease stress-related behaviors in animal models during acute ethanol withdrawal, the role of the DYN/KOR system in regulating long-term behavioral changes following protracted abstinence from ethanol is not well understood. The objective of the current study was to further explore the role of the DYN/KOR system in regulating stress-related behavioral changes associated with acute withdrawal and protracted abstinence from ethanol. More specifically, the present experiments sought to examine the ability of the KOR antagonist norbinaltorphimine (nor-BNI) to reverse depressive-like behavior in the forced swim test in rats exposed to chronic ethanol. In the first experiment, rats were fed an ethanol or control liquid diet for 28–30 days, and then 24 hours after removal of the diet, were exposed to inescapable swim stress. Immediately following this procedure, rats were injected with nor-BNI (20 mg/kg) or saline and then tested 24 hours later in the forced swim test. A second experiment used a similar procedure to examine the effects of nor-BNI on behavioral changes during protracted abstinence in rats tested in the forced swim test 3 weeks after exposure to the ethanol liquid diet procedure. Ethanol-dependent rats showed increased immobility, which is thought to indicate a depressive-like state, when examined during acute withdrawal and protracted abstinence compared to controls, an effect attenuated by nor-BNI. These results suggest that the DYN/KOR system plays role in mediating both short- and long-term behavioral changes associated with depression following chronic alcohol exposure

    Developing a decision support tool for the positioning and sizing of vortex flow controls in existing sewer systems

    Get PDF
    12th International Conference on Computing and Control for the Water Industry, CCWI2013This is the final version of the article. Available from Elsevier via the DOI in this record.This paper describes the development of a decision support tool for the positioning and sizing of vortex flow controls in existing sewer systems. The tool aims to prioritise the placement of vortex flow controls primarily within subcatchments with the greatest flood consequence rating and maximise the use of unused inpipe volumes during critical rainfall events. The decision support tool is intended for use in catchments where opportunities to implement SuDS and rainwater harvesting to defend against flooding are limited. The decision support tool is envisaged to identify potential strategies which could enhance flood resistance of sewer systems in a cost effective manner. © 2013 The Authors

    Getting it right: The case for supervisors assessing process in capstone projects

    Full text link
    © 2015 TEMPUS Publications. Capstone projects represent the culmination of an undergraduate engineering degree and are typically the last checkpoint measure before students graduate and enter the engineering profession. In Australia there is a longstanding interest in and commitment to developing quality capstone experiences.Anational study into the supervision and assessment of capstone projects has determined that whilst there is relative consistency in terms of what project tasks are set and assessed, there is not comparable consistency in how these tasks or assignments are marked. Two interconnected areas of assessing process and the role of the supervisor in marking are identified as contentious. This paper presents some findings of a national case study and concludes that whilst further investigation is warranted, assessing process as well as project products is valuable as is the need for greater acceptance of project supervisors as capable of making informed, professional judgments when marking significant project work
    corecore