19 research outputs found

    ABL Alternative Splicing Is Quite Frequent in Normal Population - Letter

    No full text

    Assessment of steelmaking slags subjected to accelerated carbonation

    No full text
    Research on the carbonation of three slag types from the steelmaking industry is reported in this paper with a two-fold intention of achieving carbon dioxide sequestration and producing a useful material for the construction sector. The as-received slag underwent a quasi-industrial carbonation process in a small reactor, to verify the feasibility and the efficiency of the process. The results revealed that some of the slags were susceptible to easy and efficient carbonation, while others presented poor and inefficient carbonation processes. Both the as-received and the carbonated slags underwent chemical, thermo-gravimetric and X-ray diffraction tests for their characterization, and SEM-EDAX observations, with a view to ascertaining the utility of the final product. Finally, the leaching products of both the as received and the carbonated slags were analyzed to assess their levels of environmental impact

    Implementation of BIM Methodology in Bachelor’s Degree in Architecture

    No full text
    In the field of construction a change is taking place. The architectural project, its development system and the way in which the different agents are going to participate in the construction process will be transformed. The reason is the bursting into a new methodology based on digital technology: the BIM methodology. The traditional paradigm of the construction process at the design level and at the execution level will not be the same nevermore. Current and future architects will have to adapt to this technology and learn to master it if they want to develop their profession in the future. Four years ago, the Management of the Higher Technical School of Architecture of San Sebastian (UPV/EHU) saw the need to implement this BIM methodology in the Bachelor’s Degree in Architecture. This communication shows the methodology carried out during the period 2018 to 2021 and the results obtained from the experience.En el ámbito de la construcción se está produciendo un cambio en el sistema de desarrollo de los proyectos y la forma en la que los distintos agentes van a participar del proceso arquitectónico. La irrupción de una nueva metodología basada en la tecnología digital, la metodología BIM, está suponiendo un cambio en el paradigma tradicional del proceso constructivo, tanto a nivel de diseño como a nivel de ejecución. Los arquitectos actuales y futuros van a tener que amoldarse a esta tecnología y aprender a dominarla si quieren desarrollar su profesión en un futuro cercano. Hace cuatro años la Dirección de la Escuela Técnica Superior de Arquitectura de San Sebastián (EPV/EHU) vio la necesidad de implementar esta metodología BIM en el propio Grado en Fundamentos de Arquitectura. Mediante esta comunicación se pretende mostrar la metodología llevada a cabo y los resultados obtenidos durante el periodo 2018 al 2021.Peer Reviewe

    Unités & Híbrids (1963-1974): tres exercicis bascos al voltant dels llargs blocs residencials

    No full text
    El resultado final de un experimento arquitectónico, especialmente en términos de vivienda colectiva pública, no sólo responde a la voluntad y a la creatividad de los arquitectos y a la adopción de unos modelos canónicos. Depende también de las específicas circunstancias del lugar donde fue edificado. El presente trabajo examina tres conjuntos residenciales edificados en la costa vasca, los cuales dan cuenta de la influencia de los principales discursos que, en relación a los largos bloques residenciales, prevalecieron en Europa Occidental en los años 60 del siglo veinte. Los tres casos dan cuenta de la manera en que los arquitectos, los agentes y la administración local trataron de aplicar el tipo arquitectónico en un determinado lugar y bajo unas específicas condiciones económicas y sociopolíticas. El artículo aporta una visión innovadora, puesto que los autores decidieron adoptar un marco geográfico que trasciende el marco político de la época, tomando en consideración la totalidad del área vasca, en la que fueron depositándose los distintos discursos arquitectónicos. Han sido consultados los proyectos originales de los tres casos de estudio, así como la bibliografía general y específica relativa a cada caso. Además, fueron realizadas una serie de entrevistas con los arquitectos responsables de dos de los casos. Tras estudiar todas las promociones basadas en los largos bloques residencias llevadas a cabo entre los primeros años 60 y la crisis del petróleo (1974), los autores han obtenido la secuencia de influencias bajo las cuales fueron desarrollados estos proyectos.El resultat final d'un experiment arquitectònic, especialment en termes d'habitatge col·lectiva pública, no només respon a la voluntat i a la creativitat dels arquitectes i a l'adopció d'uns models canònics. Depèn també de les específiques circumstàncies de el lloc on va ser edificat. El present treball examina tres conjunts residencials edificats a la costa basca, els quals donen compte de la influència dels principals discursos que, en relació als llargs blocs residencials, van prevaler a Europa Occidental en els anys 60 de segle vint. Els tres casos donen compte de la manera en què els arquitectes, els agents i l'administració local van tractar d'aplicar el tipus arquitectònic en un determinat lloc i sota unes específiques condicions econòmiques i sociopolítiques. L'article aporta una visió innovadora, ja que els autors van decidir adoptar un marc geogràfic que transcendeix el marc polític de l'època, tenint en compte la totalitat de l'àrea basca, en què van ser dipositant els diferents discursos arquitectònics. Han estat consultats els projectes originals dels tres casos d'estudi, així com la bibliografia general i específica relativa a cada cas. A més, van ser realitzades una sèrie d'entrevistes amb els arquitectes responsables de dos dels casos. Després d'estudiar totes les promocions basades en els llargs blocs residències dutes a terme entre els primers anys 60 i la crisi del petroli (1974), els autors han obtingut la seqüència d'influències sota les quals van ser desenvolupats aquests projectes.The final result of an architectural experiment, especially in terms of public collective housing, not only responds to the will and creativity of the architects, and to the adoption of canonic models, but it also depends on the specific circumstances of the place where the housing was built. This work examines three residential blocks, built along the Basque coast, which reflect the influence of the main discourses related to linear residential blocks that prevailed in Western Europe in the 60s of the twentieth century. The three cases show the way in which architects, agents and local administrations tried to apply the architectural type in a certain place, and under specific economic and sociopolitical conditions. The article provides an innovative vision, as the authors decided to adopt a geographical framework that transcends the political framework of the time, considering the entire Basque area, where the different architectural discourses were deposited. The original projects of the three case studies have been consulted, as well as general and specific literature relating to each case. Further, a series of interviews were held with the architects responsible for two of the cases. From studying all the publicity around linear blocks carried out between the early 60s and the oil crisis (1974), the authors have obtained the sequence of influences under which these projects were developed.The authors would like to thank Aitor Izaguirre Ansa for his contribution, as author of the photographs. Thanks are due also to Professor Michael Hebbert for his advice and suggestionsPeer Reviewe

    BIM Methodology in Bachelor’s Degree in Architecture: surveys and results 2018-2021

    No full text
    The BIM methodology has been used as a project design and development system within the construction sector for several years. Today's architects, but especially future architects, have to adapt to this technology in order to respond to the current job market. In this context, the studies that leading to the Degree in Architecture must implement this new tool as soon as possible. The Direction Team of the School of Architecture saw the need to implement BIM in the Degree. In 2018, a team of lecturers was appointed as responsible in order to help to carry out this work. After five years of work, this communication includes one of the tasks that have been carried out, such as the survey to the members of the Degree in relation to the implementation of this new BIM methodology.La metodología BIM se viene empleando como sistema de diseño y desarrollo de los proyectos dentro del sector de la construcción desde hace varios años. Los arquitectos actuales, pero sobre todo los arquitectos futuros, tienen que amoldarse a esta tecnología con el fin de dar respuesta al actual mercado laboral. En este contexto los estudios que conducen al Grado de Arquitectura deben implementar lo antes posible esta nueva herramienta. Desde la Dirección de la ETS de Arquitectura se vio la necesidad de implementar el BIM en el Grado. El año 2018 se designó un equipo de profesores como responsables para poder ayudar a llevar a cabo esta tarea. Después de cinco años de trabajo, en esta comunicación se recoge una de las labores que se han realizado, como ha sido el sondeo a los integrantes del Grado en relación a la implantación de esta nueva metodología BIM.Peer Reviewe

    Ibilgailu elektriko, hibrido eta erregai-piladunak: teknologiaren egoera

    Get PDF
    Ibilgailu elektriko, hibrido eta erregai-piladunek duten entzutea geroz eta handiagoa izaten ari da. I+G esfortzuak konfigurazio berri, moldagarri, fidagarriagoetan eta kostu txikiagokoetan zentratzen ari dira. Artikulu honetan, topologia hauetako teknologiaren egoera aurkezten da, sistema berri eta etorkizun handikoetan enfasia jarriz.

    Loss and stress reduction in VSI devices for EVs using general discontinuous PWM

    No full text
    Ponencia presentada a XXIII Seminario Anual de Automática, Electrónica Industrial e Instrumentación (SAAEI'16), Elche, 6-8 de julio de 2016In this paper, a new carrier based discontinuous pulse width modulation (DPWM) strategy for voltage source inverter (VSI) is presented in order to use in electric vehicles (EV). The basic idea of DPWM techniques, is clampimg to upper or lower terminal of DC-link to avoid commutations. Clamping interval of this algorithm is controlled on-line by output current values, to avoid switching with highest current values. The triangular carrier signals are generated as well, depending on output currents to ensure minimum input current ripple. This reduces DC-link capacitor current, and so, reduce stress in capacitor. Switching losses and capacitor current are optimized for whole load angles.This work has been carried out inside de Research and Education Unit UFI11/16 of the UPV/EHU and supported by the Department of Education, Universities and Research of the Basque Government within the fund for research groups of the Basque university system IT394-10, by the Ministerio de Economía y Competitividad of Spain within the project DPI2014-53685-C2-2-R and FEDER funds, and by the Government of the Basque Country within the research program ELKARTEK as the project KT4TRANS (KK-2015/00047)
    corecore