6,950 research outputs found

    A world current of plastic waste in the marine environment and solutions to the problem

    Get PDF
    Pollution is one of the major issues concerning the state of the oceans and has been recognized as a major problem for decades. This project examines the problem of plastic litter in the oceans in terms of its environmental and human health effects. It identifies actions countries such as Ireland, Kenya, China, and others have taken to remedy the problem and it explores plausible alternatives to the current plastic addiction

    National Evaluation of the Capacity Building Programme in English Local Government: Overall Final Report

    Get PDF
    This report is one of a series of outputs from the National Evaluation of the Capacity Building Programme for local government in England (CBP), undertaken by a team of researchers at the Policy Research Institute (PRI) at Leeds Metropolitan University and the Cities Research Unit at the University of West of England. This report summarises the findings from all four key strands of the evaluation. Because of the difficulties associated with quantifying the capacity of local authorities, much less the sector, in relation to the dynamic roles and objectives that they pursue, the report focuses on what has worked, why and in what circumstances, rather than providing a definitive assessment of the extent of change of capacity building enabled by the CBP. The CBP was launched in 2003 as a joint Department for Communities and Local Government/Local Government Association (LGA) initiative to support capacity building and improvement activities within local authorities in England. The CBP has supported four main streams of improvement and capacity building activity in local authorities (see Section 1.2; p13)

    National Evaluation of the Capacity Building Programme in English Local Government: Annex 4: Follow On Study of Progress in Seven Case Study Improvement Partnerships

    Get PDF
    This report is one of a series of outputs from the national evaluation of the Capacity Building Programme for local government in England (CBP), being undertaken by a team of researchers at the Policy Research Institute (PRI) at Leeds Metropolitan University and the Cities Research Unit at the University of West of England. This report summarises the findings from the second phase of fieldwork with regional and sub-regional Improvement Partnerships, established to facilitate capacity building and improvement activity in local authorities. The research underpinning this report was undertaken in seven case study Improvement Partnerships (see Section 2) in October and November 2006 and follows a similar – baseline – exercise undertaken during the same period during 2005. It thus both draws on the earlier research (see Section 3) and identifies evidence of progress and impact (see Section 10) since the baseline phase

    National Evaluation of the Capacity Building Programme in English Local Government: Annex 1. Seven Case Studies: The Pilot Programme

    Get PDF
    This report presents the findings of the evaluation of the Capacity Building pilots. The evaluation of the pilots is part of the on-going evaluation of the Capacity Building Programme and has been undertaken in the early scoping phase of the main evaluation in order to capture key learning points and insights into the programme. It is intended that the ongoing evaluation of the Capacity Building Programme will be formative and assist in the development of the programme over time. In what follows the background to the pilots programme is discussed, highlighting the kinds of capacity building activities the pilots are engaged with and the link between the Capacity Building Programme and the CPA. The report outlines the structure and purpose of the pilots programme and the nature and characteristics of the different pilots that were undertaken. The seven case studies are then discussed in more detail in the main body of 1 Introduction | 5 the report. These are drawn together in key themes and findings which can be used to strengthen future project development

    Listening to galaxies tuning at z ~ 2.5 - 3.0: The first strikes of the Hubble fork

    Full text link
    We investigate the morphological properties of 494 galaxies selected from the GMASS survey at z>1, primarily in their optical rest frame, using HST images, from the CANDELS survey. We propose that the Hubble sequence of galaxy morphologies takes shape at redshift 2.5<z<3. The fractions of both ellipticals and disks decrease with increasing lookback time at z>1, such that at redshifts z=2.5-2.7 and above, the Hubble types cannot be identified, and most galaxies are classified as irregular. The quantitative morphological analysis shows that, at 1<z<3, morphological parameters are not as effective in distinguishing the different morphological Hubble types as they are at low redshift. No significant morphological k-correction was found to be required for the Hubble type classification, with some exceptions. In general, different morphological types occupy the two peaks of the rest-frame (U-B) colour bimodality of galaxies: most irregulars occupy the blue peak, while ellipticals are mainly found in the red peak, though with some level of contamination. Disks are more evenly distributed than either irregulars and ellipticals. We find that the position of a galaxy in a UVJ diagram is related to its morphological type: the "quiescent" region of the plot is mainly occupied by ellipticals and, to a lesser extent, by disks. We find that only ~33% of all morphological ellipticals in our sample are red and passively evolving galaxies. Blue galaxies morphologically classified as ellipticals show a remarkable structural similarity to red ones. Almost all irregulars have a star-forming galaxy spectrum. In addition, the majority of disks show some sign of star-formation activity in their spectra, though in some cases their red continuum is indicative of old stellar populations. Finally, an elliptical morphology may be associated with either passively evolving or strongly star-forming galaxies.Comment: 27 pages, 16 figures, 5 tables. "Morphological atlas" in the appendix. Revised version accepted for publication in A&

    Induced QCD and Hidden Local ZN Symmetry

    Full text link
    We show that a lattice model for induced lattice QCD which was recently proposed by Kazakov and Migdal has a ZNZ_N gauge symmetry which, in the strong coupling phase, results in a local confinement where only color singlets are allowed to propagate along links and all Wilson loops for non-singlets average to zero. We argue that, if this model is to give QCD in its continuum limit, it must have a phase transition. We give arguments to support presence of such a phase transition

    On the use of low-cost computer peripherals for the assessment of motor dysfunction in Parkinson’s disease – Quantification of bradykinesia using target tracking tasks

    Get PDF
    The potential of computer games peripherals to measure the motor dysfunction in Parkinson’s diseases is assessed. Of particular interest is the quantification of bradykinesia. Previous studies used modified or custom haptic interfaces, here an unmodified force feedback joystick and steering wheel are used with a laptop. During testing an on screen cursor moves in response to movements of the peripheral, the user has to track a continuously moving target (pursuit tracking), or move to a predetermined target (step tracking). All tasks use movement in the horizontal axis, allowing use of joystick or steering wheel. Two pursuit tracking tasks are evaluated, pseudo random movement, and a swept frequency task. Two step tracking tasks are evaluated, movement between two or between two of five fixed targets. Thirteen patients and five controls took part on a weekly basis. Patients were assessed for bradykinesia at each session using standard clinical measures. A range of quantitative measures was developed to allow comparison between and within patients and controls using ANOVA. Both peripherals are capable of discriminating between controls and patients, and between patients with different levels of bradykinesia. Recommendations for test procedures and peripherals are given

    National Evaluation of the Capacity Building Programme in English Local Government: Evaluation of the National Programmes: Annex 2: Evaluation of the National Programmes

    Get PDF
    The report is one of a series of outputs from the national evaluation of the CBP, being undertaken by a team of researchers at the Policy Research Institute (PRI) at Leeds Metropolitan University and the Cities Research Unit at the University of West of England. The Capacity Building Programme for local government was launched in 2003 as a joint Department for Communities and Local Government (DCLG) / Local Government Association (LGA) initiative to support capacity building and improvement activities within local authorities in England. The evaluation of the Capacity Building Programme has been underway since late 2004. A scoping phase was conducted until May 2005, including a short evaluation of the Pilot Programmes. The main phase of the evaluation commenced in September 2005 and encompassed four main phases (see Section 1.3: p10)
    • …
    corecore