2,020 research outputs found

    Breast-feeding and weaning practices in Venda, 1990

    Get PDF
    A stratified randOlll cluster survey, using a structured interview schedule, was performed to determine the prevalence, frequency and duration of breast-feeding alllong Venda mothers as well as the foods that Venda children commonly ate in their first 2 years of life. Nearly all children under 2 years old were being breast-fed and virtually all of these were fed on demand. Approximately 60% of infants under 3 months of age and virtually all others under 2 years old received supplementary foods daily. A further 30% ofinfants under the age of 3 months were given supplementary water daily. Forty per cent of infants under 3 months old and virtually all in the other age groups were given carbohydrates daily. Protein foods, vitamin mineral and high-energy sources were given less frequently. Only 12% in the 6 - 11-month age group and 21% in the 12 - 23-111onth age group received a balanced diet daily. A significant proportion of children in all age groups received only carbohydrates over and above breast-milk. Traditional xnixes were infrequently given. More research is needed to assess actual breast-milk production by mothers whose children are being fed supplelllentary foods. The effect of socio-economic status on weaning practices and that of weaning practices on nutritional status need to be investigated. Food supplelllentation and nutrition education progralllllles need to be intensified

    New wave form surveillance and diagnostics for the LEP injection kickers

    Get PDF
    The introduction of the Bunch Train Scheme in LEP requires a more precise and automatic supervision of the stability of the LEP injection kickers in timing and amplitude. Comprehensive and user-friendly diagnostic tools are required for in-depth investigation of equipment behaviour. A new system is currently being prepared using to a large extent commercial data acquisition hardware and hardware independent software products

    The new control system of the SPS injection kicker

    Get PDF
    The SPS accelerator will be used as injector for the LHC and has to be adapted to the LHC requirements. The tight specification on beam blow-up and bunch spacing in the SPS has required an upgrade program of the SPS injection kicker in order to obtain a reduction of the magnetic field ripple to less than ± 0.5% and of the magnet current rise time to less than 145 ns. In this context, the slow control part has been entirely rebuilt on the basis of off-the-shelf industrial components. A hierarchical architecture based on a SIEMENS S7-400 master programmable logic controller interconnected through PROFIBUS-DP to S7-300 deported and decentralised I/Os has been implemented. Integration of in-house specific G-64 hardware systems inside this industrial environment has been done through a PROFIBUS-DP to G-64 intelligent interface based on an OEM fieldbus mezzanine board on one side and an FPGA implementing the required functionality on the other. Simultaneously, the fast timing system has been completely reshuffled in order to provide the required SPS multi-cycling functionality and a synchronisation of the 16 magnets to 5ns. This modular architecture has been successfully integrated inside the new SPS accelerator control infrastructure and will be duplicated in the future for the control of the different SPS extraction channels

    The new control system of the SPS target sector

    Get PDF
    The SPS, the Super Proton Synchrotron at CERN, is an accelerator originally designed and commissioned in 1976 for protons. The control system of the SPS target stations, beam absorbers and other aperture limiting devices was developed in the seventies. It was mainly based on home made electronics and equipment dependent software. With time, this electronics has become obsolete, difficult to maintain in operation and not suitable for integration into a modern control system. In 1997, a project was set up to modernise the electronics and the related software. The new control system is largely based on standard industrial hardware and software components. SIEMENS Simatic S7-300 programmable logic controllers have been used as equipment controllers and connected through PROFIBUS to a Windows-NT front-end PC running the SIEMENS WinCC SCADA package which acts as local controller and remote access gateway. This fully industrial solution has been successfully integrated into the actual SPS accelerator control infrastructure and is open to other industrial communication protocols. The design, development and realisation of the selected solution have been outsourced to industry

    Force generation of curved actin gels characterized by combined AFM-epifluorescence measurements

    No full text
    Polymerization of actin into branched filaments is the driving force behind active migration of eukaryotic cells and motility of intracellular organelles. The site-directed assembly of a polarized branched array forms an expanding gel that generates the force that pushes the membrane. Here, we use atomic force microscopy to understand the relation between actin polymerization and the produced force. Functionalized spherical colloidal probes of varying size and curvature are attached to the atomic force microscopy cantilever and initiate the formation of a polarized actin gel in a solution mimicking the in vivo context. The gel growth is recorded by epifluorescence microscopy both against the cantilever and in the perpendicular (lateral) nonconstrained direction. In this configuration, the gel growth stops simultaneously in both directions at the stall force, which corresponds to a pressure of 0.15 nN/μm(2). The results show that the growth of the gel is limited laterally, in the absence of external force, by internal mechanical stresses resulting from a combination of the curved geometry and the molecular mechanism of site-directed assembly of a cohesive branched filament array

    Outsourcing of the New Wave Form Acquisition, Surveillance and Diagnostic System for the LEP Injection Kickers

    Get PDF
    In 1996, a project has been launched to improve the acquisition, surveillance and diagnostic system of the LEP injection kickers. The technical solution is formed by a VXI acquisition hardware and a Windows NT / LabVIEW software environment. The realisation has been entirely outsourced to industry. This paper discusses the different phases of the project, from market survey over technical specification to acceptance tests, explains the technical choices and evaluates the results, presents the point of view of both parties on the collaboration and concludes with the experiences learned from this project
    • …
    corecore