373 research outputs found

    Surface structure on abandoned upland blanket peatland tracks

    Get PDF
    Temporary permissions are often granted for track use on peatlands. However, even when peatland track designs attempt to minimise environmental impacts via use of mesh systems, such linear disturbances may have persistent impacts. We evaluated the surface peatland structure of five abandoned tracks (four with a mesh surface, one unsurfaced) with varying past usage frequencies, at an upland site in northern England. Simplification of the surface nanotopography was found on all tracks compared to surrounding control areas, with increased micro-erosion patterns in rutted areas, and invasive species on some treatments. The frequency of previous usage was not found to be a significant factor controlling nano-topographic loss. Edge effects and hillslope position were influential in places, but these effects were not consistent across treatments. Nano-topographic recovery was found to be inhibited when track usage commenced within a short time frame after track construction. Mesh tracks appear to create a spatial constraint leading to poor development of plants and a reduced ability to form characteristic structures which are integral to mire function

    Impacts of peat bulk density, ash deposition and rainwater chemistry on establishment of peatland mosses

    Get PDF
    Background and aims Peatland moss communities play an important role in ecosystem function. Drivers such as fire and atmospheric pollution have the capacity to influence mosses via multiple pathways. Here, we investigate physical and chemical processes which may influence establishment and growth of three key moss species in peatlands. Methods A controlled factorial experiment investigated the effects of different peat bulk density, ash deposition and rainwater chemistry treatments on the growth of Sphagnum capillifolium, S. fallax and Campylopus introflexus. Results Higher peat bulk density limited growth of both Sphagnum species. S. capillifolium and C. introflexus responded positively to ash deposition. Less polluted rain limited growth of C. introflexus. Biomass was well correlated with percentage cover in all three species. Conclusions Peat bulk density increases caused by fire or drainage can limit Sphagnum establishment and growth, potentially threatening peatland function. Ash inputs may have direct benefits for some Sphagnum species, but are also likely to increase competition from other bryophytes and vascular plants which may offset positive effects. Rainwater pollution may similarly increase competition to Sphagnum, and could enhance positive effects of ash addition on C. introflexus growth. Finally, cover can provide a useful approximation of biomass where destructive sampling is undesirable

    Blanket bogs exhibit significant alterations to physical properties as a result of temporary track removal or abandonment

    Get PDF
    Temporarily consented tracks made from high-density polyethylene (HDPE) mesh have been used to mitigate both the physical and ecological impacts on peatlands from low-frequency vehicle usage. However, the impacts of mesh track removal or abandonment at the end of the consented period remain poorly understood. Over a 2-year period, we studied replicate sections of abandoned mesh track which, at the start of the experiment, had been unused for approximately 5 years, on a UK blanket bog. Some sections were removed (using two treatment methods – vegetation mown and unprepared), whereas others were left in situ. Metrics were compared both between treatments and to undisturbed reference areas. Significant differences in surface soil moisture were found between abandoned and removed tracks depending on season. Control areas had higher volumetric soil moisture than track locations. Compaction was significantly higher across all track locations in comparison to controls (p < 0.001), but rarefaction was not recorded post-removal, suggesting long-term deformation. Overland flow events were recorded in rut sections for a mean of 16% of the time, compared to <1% in control areas. Sediment traps on the tracks collected 0.406 kg compared to 0.0048 kg from the control traps, equating to a per trap value of 7.3 g from track samplers and 0.17 g from control samplers. Erosion and desiccation features occurred on both removed and abandoned track sections. Both abandonment and removal of mesh tracks have a wide range of impacts on the physical properties of peatlands, suggesting that only where access is a necessity should such a track be installed

    Floating Wind Offshore Turbines - Installation Engineering

    Get PDF
    This is the final version.Institution of Mechanical Engineers - Wind Turbine User Group 2023, 17 - 18 May 2023, London, UKFloating offshore wind turbines are an emerging source of marine renewable energy. Installation engineering of these large floating structures is required to provide confidence to owners and insurers that they are constructed in a safe and cost effective manner. This paper covers the construction and installation of various substructure types including barges, Spars, semi submersibles and tension leg platforms. This paper details the engineering requirements for installation vessels and large onshore cranes required for the construction of floating substructures that support offshore wind turbines. Each of the installation phases, such as load-out, fit out, tow out, mooring connection and cable laying poses challenges in the use of existing technology and the development of new installation techniques. The presentation will give an overview and comparative analysis of lessons learnt for offshore installation of floating offshore wind turbines. 3 key phrases i. Floating wind turbines nearshore construction ii. Requirements for installation vessels and onshore cranes for floating wind iii. Technical advances for floating wind installatio

    Port and shipyard requirements for the installation of floating wind turbines

    Get PDF
    This is the author accepted manuscript. The final version is available from the Royal Institute of Naval Architects via the link in this record As the floating offshore wind turbine industry continues to develop and grow, the capabilities of established port facilities need to be assessed as to their ability to support the expanding installation requirements. This presentation assesses current infrastructure requirements and projected changes to port facilities that may be required to support the floating offshore wind industry. Understanding the infrastructure needs of the floating offshore renewable industry will help to identify the port-related requirements. The naval architecture aspects of port development include loadout ballasting and mooring, intact stability during floatout from a drydock and fit out of turbine components. The capabilities of established port facilities to support floating wind farms are assessed by evaluation of size of substructures, height of wind turbine with regards to onshore cranes for fitting of blades, distance to offshore site and offshore vessel characteristics. In addition large areas are required for laydown of mooring equipment, turbine blades and nacelles. The floating offshore wind industries are in early stages of development and port facilities are required for substructure fabrication, turbine manufacture, turbine construction and maintenance support. The presentation discusses the potential floating wind substructures to provide a snapshot of the requirements at the present time, and potential technological developments required for commercial development. Scaling effects of demonstration-scale projects will be addressed, however the primary focus will be on commercial-scale (30+ units) device floating wind energy farm

    Installation Aspects of Floating Offshore Wind Turbines

    Get PDF
    This is the final versionFloating offshore wind is an emerging source of marine renewable energy. The installation of floating wind turbines can take advantage of the UK oil and gas industry and the fixed offshore wind platforms. The presentation reviews the installation development of different types of substructure namely: barges, Spars, semi submersibles and TLPs. The installation challenges for the various substructure types are investigated and suggested areas for future development for floating offshore wind are included. Design for installation includes expanding the weather window in which these floating substructures can be transported to site and facilitate mooring and electrical connection. The simplification of installation methodology will reduce time spent offshore and minimises risks

    Floating wind turbines: construction and installation considerations

    Get PDF
    This is the final version.As the floating offshore wind turbine industry continues to develop and grow, the capabilities of established port facilities and installation vessel need to be assessed as to their ability to support the expanding construction and installation requirements. This presentation reviews current infrastructure requirements and projected changes to port facilities that may be required to support the floating offshore wind industry. The capabilities of established shipyard facilities to support floating wind farms are assessed by evaluation of size of substructures, height of wind turbine with regards to the cranes for fitting of blades, distance to offshore site and offshore installation vessel characteristics. The ability to assemble Floating Offshore Wind Turbines equipment in a port means minimising highly weather dependent operations such as offshore heavy lifts and assembly, saving time and costs and minimising safety risks for offshore workers. The presentation will provide information on previous and current floating offshore wind turbines under construction. Information is included on • Job Creation, • Construction Mitigation • People requirements. • Physical requirements of constructing and installing floating wind turbines • Training and industrial relations, considerations • How to minimise effects on the environment with noise mitigation during pile driving and reducing the effect of damage to the seabe

    Floating offshore wind turbines installation methods

    Get PDF
    This is the final versionFloating offshore wind turbines are an emerging source of marine renewable energy, in deep water offshore locations, with minimal visual impact from the shore. The presentation reviews the installation methods for floating wind types such as barges, Spars, semi submersibles and TLPs and offers suggestions for improvements. This floating wind presentation will be useful for stakeholders in the offshore wind engineering sector who are offering installation solutions for floating wind installations. The overview of the installation challenges for different substructure types will provide important information to developers of floating wind

    Offshore substations - construction and installation

    Get PDF
    Substations are required for offshore renewable energy development far from shore. Various options are available for offshore electrical substations, namely fixed, floating, and subsea. This presentation will consider the construction, ocean voyage, and offshore installation of different types of offshore substations. There are HVDC (high voltage direct current) and HVAC substations. As the offshore wind turbine industry continues to develop and grow, the capabilities of established port facilities need to be assessed as to their ability to support the expanding construction and installation requirements for offshore substations. This presentation reviews projected changes to port facilities that may be required to support the substation required for the offshore wind industry. Understanding the infrastructure needs of the offshore renewable industry will help to identify the port-related requirements. Separate shipyards are required for substructure construction and fit-out of the substations. Marshalling ports are required for mooring components, subsea cables and maintenance. Large areas are required for the laydown of mooring equipment, inter array cables, turbine blades and nacelles. The capabilities of established shipyard facilities to support floating wind farms are assessed by evaluation of size of substructures, height of wind turbine with regards to the cranes for fitting of blades, distance to offshore site and offshore installation vessel characteristics. The presentation will consider the requirements for floating substations, far from shore. The presentation will consider installation vessel requirements for offshore substations. This includes crane vessels, tugs, and heavy transport vessels. Cable lay vessels will be considered for medium voltage inter array cables and high voltage export cable

    Port and installation constraints of Tension Leg Platforms (TLP) floating wind turbines

    Get PDF
    This is the final version.Floating offshore wind needs to go from pre commercial phase to full commercial use if it’s full benefits are to be realised. The port and installation requirements for barge, semi submersible and Spar substructure types are understood, though more research is needed to reduce cost. Floating Wind Tension Leg Platforms (TLPs) have constraints on tow out intact stability and complications in installing the tension moorings. The paper will review the port and installation requirements of TLPs as floating wind substructures. The TLP has the advantages over other substructure types for low in place motions and minimum area taken up on the seabed. There is experience from the offshore oil and gas industry of TLPs which can assist in developing cost effective TLP designs for floating wind. The priorities are the turbine fit out port and the vessels required for TLP offshore installation. Cost reduction during the port and installation phases are based on the best techniques from the offshore oil and gas industry, from bottom fixed wind turbines and the installation of other floating wind types. Installation methods considered are: variable draft between tow out and operations, piece small installation offshore and fitting temporary buoyancy for the tow out phase. Design for installation includes expanding the weather window in which the TLP floating substructure can be transported to site and configurations to facilitate mooring. The simplification of installation methodology will reduce time spent offshore and will minimise risks to personnel
    • …