11 research outputs found

    Using activity based costing and simulation to reduce cost at a Police communications centre

    Get PDF
    Purpose: This study is based at a police force’s communications centre which undertakes a vital role in receiving and processing emergency and non-emergency telephone calls from the public and other agencies. The purpose of this paper is to evaluate a method for addressing the conflict between the need to reduce cost and the requirement to meet national standards in terms of a timely response to customer calls. Design/methodology/approach: In a two-stage methodology an activity-based costing (ABC) approach is used as a framework to show how costs are generated by the three “drivers” of cost which relate to the design efficiency of the process, the demand on the process and the cost of resources used to undertake the process. The study then provides an analysis from a resource driver perspective using discrete-event simulation to model workforce staffing scenarios. Findings: Cost savings within the police communications centre are identified from an analysis of the three drivers of cost. Further analysis from a resource driver viewpoint using a simulation study of an alternative workforce schedule predicted an overall reduction in staffing cost of 9.4 per cent. Originality/value: The study outlines an innovative method that identifies where cost can be reduced using ABC and then provides an assessment of strategies that aim to reduce cost whilst maintaining service levels in a police operation using simulation

    User recommendations for the optimized execution of business processes

    Get PDF
    In order to be able to flexibly adjust a company's business processes (BPs) there is an increasing interest in flexible process-aware information systems (PAISs). This increasing flexibility, however, typically implies decreased user guidance by the PAIS and thus poses significant challenges to its users. As a major contribution of this work, we propose a recommendation system which assists users during process execution to optimize performance goals of the processes. The recommendation system is based on a constraint-based approach for planning and scheduling the BP activities and considers both the control-flow and the resource perspective. To evaluate the proposed constraint-based approach different algorithms are applied to a range of test models of varying complexity. The results indicate that, although the optimization of process execution is a highly constrained problem, the proposed approach produces a satisfactory number of suitable solutions.Ministerio de Ciencia e InnovaciĂłn TIN2009-1371

    Artificial neural networks based predictive model for worker assignment into virtual cells

    Full text link

    Stand der Literatur zur operativen Steuerung von Dienstleistungsprozessen

    Get PDF
    Services are characterised by the integration of customers while the service is produced. This integration leads to interruptions in the processing of a customer order until the customer provides the missing input. Since customer behaviour can be planned to a certain extent only challenges in planning an efficient delivery of a service process arise. This holds especially true for operational control as it has to correct deviances in the short-term. Thus, the following research question occurs: How can service processes be controlled efficiently taking customer integration into account? The aim of this working paper is to conduct a comprehensive literature review with regard to the research question. The results show that the majority of approaches are originate from manufacturing dealing with processes mainly conducted by machines and having stock-keeping possibilities. These manufacturing processes and the approaches typically do not deal with the complex influence of customer integration on operational control as in the case of service processes. It is concluded that a sufficient answer to control service processes is missing so far and thus potential research areas are addressed. --operational control,services,literature review

    Advanced planning methodologies in food supply chains

    Get PDF

    Ensaios sobre flexibilidade da cadeia de abastecimento: uma abordagem de opções reais

    Get PDF
    Doutoramento em Gestão IndustrialA presente tese investiga o processo de tomada de decisão na gestão de cadeias de abastecimento, utilizando um quadro de análise de opções reais. Especificamente, estudamos tópicos como o nível de inventário ideal para protecção contra a incerteza da procura, o momento para implementação de capacidade flexível em mercados onde existe complexidade no mix de produtos, o tempo para o reforço do factor trabalho visando requisitos de serviço ao mercado, e as decisões entre integração e outsourcing num ambiente de incerteza. Foram usadas metodologias de tempo discreto e contínuo para identificar o valor ideal e o calendário das opções a adoptar, quando a procura é estocástica. Além disso, foram considerados os efeitos dos requisitos dos mercados, como a complexidade na oferta de produtos e o nível de serviço. A procura é representada recorrendo a diferentes processos estocásticos, o impacto de saltos inesperados também é explorado, reforçando a generalização dos modelos a diferentes condições de negócio. A aplicabilidade dos modelos que apresentamos permite a diversificação e o enriquecimento da literatura sobre a abordagem de opções reais, no âmbito das cadeias de abastecimento. Níveis de inventário flexíveis e capacidades flexíveis são característicos das cadeias de abastecimento e podem ser usados como resposta à incerteza do mercado. Esta tese é constituída por ensaios que suportam a aplicação dos modelos, e consiste num capítulo introdutório (designado por ensaio I) e mais seis ensaios sobre factores que discutem o uso de medidas de flexibilidade nas cadeias de abastecimento, em ambientes de incerteza, e um último ensaio sobre a extensão do conceito de flexibilidade ao tratamento da avaliação de planos de negócio. O segundo ensaio que apresentamos é sobre o valor do inventário num único estádio, enquanto medida de flexibilidade, sujeita ao crescente condicionalismo dos custos com posse de activos. Introduzimos uma nova classificação de artigos para suportar o indicador designado por overstock. No terceiro e quarto ensaio ampliamos a exploração do conceito de overstock, promovendo a interacção e o balanceamento entre vários estádios de uma cadeia de abastecimento, como forma de melhorar o desempenho global. Para sustentar a aplicação prática das abordagens, adaptamos o ensaio número três à gestão do desempenho, para suportar o estabelecimento de metas coordenadas e alinhadas; e adaptamos o quarto ensaio à coordenação das cadeias de abastecimento, como auxiliar ao planeamento integrado e sequencial dos níveis de inventário. No ensaio cinco analisamos o factor de produção “tecnologia”, em relação directa com a oferta de produtos de uma empresa, explorando o conceito de investimento, como medida de flexibilidade nas componentes de volume da procura e gama de produtos. Dedicamos o ensaio número seis à análise do factor de produção “Mão-de-Obra”, explorando as condicionantes para aumento do número de turnos na perspectiva económica e determinando o ponto crítico para a tomada de decisão em ambientes de incerteza. No ensaio número sete exploramos o conceito de internalização de operações, demarcando a nossa análise das demais pela definição do momento crítico que suporta a tomada de decisão em ambientes dinâmicos. Complementamos a análise com a introdução de factores temporais de perturbação, nomeadamente, o estádio de preparação necessário e anterior a uma eventual alteração de estratégia. Finalmente, no último ensaio, estendemos a análise da flexibilidade em ambientes de incerteza ao conceito de planos de negócio. Em concreto, exploramos a influência do número de pontos de decisão na flexibilidade de um plano, como resposta à crescente incerteza dos mercados. A título de exemplo, usamos o mecanismo de gestão sequencial do orçamento para suportar o nosso modelo. A crescente incerteza da procura obrigou a um aumento da agilidade e da flexibilidade das cadeias de abastecimento, limitando o uso de muitas das técnicas tradicionais de suporte à gestão, pela incapacidade de incorporarem os efeitos da incerteza. A flexibilidade é claramente uma vantagem competitiva das empresas que deve, por isso, ser quantificada. Com os modelos apresentados e com base nos resultados analisados, pretendemos demonstrar a utilidade da consideração da incerteza nos instrumentos de gestão, usando exemplos numéricos para suportar a aplicação dos modelos, o que claramente promove a aproximação dos desenvolvimentos aqui apresentados às práticas de negócio.The present thesis researches the process of decision making in supply chain management using a real options analysis framework. Specifically, we address issues regarding the optimal inventory level to hedge against demand uncertainties; the timing for equipment capacity implementation under market product mix complexity; the timing for workforce capacity reinforcement aiming market service requirements; and the decisions between integration and outsourcing in an uncertainty environment. Discrete and continuous time methodologies were used to identify the optimal value and timing of the options to adopt, when the demand is stochastic. Additionally, the effect of market requirements, such as product mix complexity and service level, were also taken into consideration. The demand is modelled under different stochastic processes; the impact of unexpected shocks is also explored, which enhances the generalization of the models to different business conditions. The applicability of the models enables the diversification and enrichment of the literature on the real options approach, within supply chain concept. Flexible inventory levels and the flexible capacity are supply chain features that can be used to deal with demand uncertainty. The thesis is organized by essays that support the application of the models, and consists of an introductory chapter (essay I) and six trials on factors that enhance the use of supply chain flexibility measures in uncertainty environments and an extended essay on the concept of flexibility to the evaluation of business plans. The second essay we present refers to the inventory value in a single echelon, as a measure of flexibility, subject to cost constraints. We introduce a new items’ classification to support the indicator designated as overstock. In the third and fourth experiments we extend the concept of overstock, promoting the interaction and balance between supply chain echelons in order to improve overall performance. For a practical application of the approaches, we adapted the third essay to the performance management, to support the establishment of coordinated and aligned goals, and used the fourth essay to the coordination of supply chains, supporting the integrated and sequential inventory planning. In the fifth essay we analyse manufacturing technology features in connection with the company's product mix, exploring the concept of investment as a flexible measure to deal with uncertain demand volume and product range flexibility. We dedicate the sixth essay to the analysis of the input "workforce", exploring the economic conditions for increasing the number of work shifts and determining the critical point for decision making in uncertainty environments. In the essay number seven, we explore the concept of internalisation of operations, focusing our analysis in the trigger moment that supports decision making in dynamic environments. We complement the analysis by introducing temporal factors that could disturb the change, including the preparation stage prior to any strategic alternative. Finally, in the last essay, we extend the concept of flexibility in uncertainty environments to the business plans analysis. Specifically, we explore the influence of the number of decision points in the flexibility of a plan in response to increasing market uncertainty. As an example, we use the mechanism of sequential budget to support the model. The increasing uncertainty in demand has promoted supply chains agility and flexibility, limiting the use of many of the traditional management techniques, because of their inability to incorporate the effects of uncertainty. Flexibility is clearly a competitive advantage that companies should have and therefore must be quantified. With the models developed and results that are presented, this thesis aims to demonstrate the usefulness of considering the uncertainty impact in management tools, using numerical examples to support the application of the models and the interpretation of the results, which clearly seek to bring the developments to the actual business practices

    Considering the flexibility of human resources in planning and scheduling industrial activities

    Get PDF
    The growing need of responsiveness for manufacturing companies facing the market volatility raises a strong demand for flexibility in their organization. This flexibility can be used to enhance the robustness of a baseline schedule for a given programme of activities. Since the company personnel are increasingly seen as the core of the organizational structures, they provide the decision-makers with a source of renewable and viable flexibility. First, this work was implemented to model the problem of multi-period workforce allocation on industrial activities with two degrees of flexibility: the annualizing of the working time, which offers opportunities of changing the schedules, individually as well as collectively. The second degree of flexibility is the versatility of operators, which induces a dynamic view of their skills and the need to predict changes in individual performances as a result of successive assignments. The dynamic nature of workforce’s experience was modelled in function of learning-by-doing and of oblivion phenomenon during the work interruption periods. We firmly set ourselves in a context where the expected durations of activities are no longer deterministic, but result from the number and levels of experience of the workers assigned to perform them. After that, the research was oriented to answer the question “What kind of problem is raises the project we are facing to schedule?”: therefore the different dimensions of the project are inventoried and analysed to be measured. For each of these dimensions, the related sensitive assessment methods have been proposed. Relying on the produced correlated measures, the research proposes to aggregate them through a factor analysis in order to produce the main principal components of an instance. Consequently, the complexity or the easiness of solving or realising a given scheduling problem can be evaluated. In that view, we developed a platform software to solve the problem and construct the project baseline schedule with the associated resources allocation. This platform relies on a genetic algorithm. The model has been validated, moreover, its parameters has been tuned to give the best performance, relying on an experimental design procedure. The robustness of its performance was also investigated, by a comprehensive solving of four hundred instances of projects, ranked according to the number of their tasks. Due to the dynamic aspect of the workforce’s experience, this research work investigates a set of different parameters affecting the development of their versatility. The results recommend that the firms seeking for flexibility should accept an amount of extra cost to develop the operators’ multi functionality. In order to control these over-costs, the number of operators who attend a skill development program should be optimised, as well as the similarity of the new developed skills relative to the principal ones, or the number of the additional skills an operator may be trained to, or finally the way the operators’ working hours should be distributed along the period of skill acquisition: this is the field of investigations of the present work which will, in the end, open the door for considering human factors and workforce’s flexibility in generating a work baseline program

    Prise en compte de la flexibilité des ressources humaines dans la planification et l’ordonnancement des activités industrielles

    Get PDF
    Le besoin croissant de réactivité dans les différents secteurs industriels face à la volatilité des marchés soulève une forte demande de la flexibilité dans leur organisation. Cette flexibilité peut être utilisée pour améliorer la robustesse du planning de référence d’un programme d’activités donné. Les ressources humaines de l’entreprise étant de plus en plus considérées comme le coeur des structures organisationnelles, elles représentent une source de flexibilité renouvelable et viable. Tout d’abord, ce travail a été mis en oeuvre pour modéliser le problème d’affectation multi-périodes des effectifs sur les activités industrielles en considérant deux dimensions de la flexibilité: L’annualisation du temps de travail, qui concerne les politiques de modulation d’horaires, individuels ou collectifs, et la polyvalence des opérateurs, qui induit une vision dynamique de leurs compétences et la nécessité de prévoir les évolutions des performances individuelles en fonction des affectations successives. La nature dynamique de l’efficacité des effectifs a été modélisée en fonction de l’apprentissage par la pratique et de la perte de compétence pendant les périodes d’interruption du travail. En conséquence, nous sommes résolument placés dans un contexte où la durée prévue des activités n’est plus déterministe, mais résulte du nombre des acteurs choisis pour les exécuter, en plus des niveaux de leur expérience. Ensuite, la recherche a été orientée pour répondre à la question : « quelle genre, ou quelle taille, de problème pose le projet que nous devons planifier? ». Par conséquent, les différentes dimensions du problème posé sont classées et analysés pour être évaluées et mesurées. Pour chaque dimension, la méthode d’évaluation la plus pertinente a été proposée : le travail a ensuite consisté à réduire les paramètres résultants en composantes principales en procédant à une analyse factorielle. En résultat, la complexité (ou la simplicité) de la recherche de solution (c’est-à-dire de l’élaboration d’un planning satisfaisant pour un problème donné) peut être évaluée. Pour ce faire, nous avons développé une plate-forme logicielle destinée à résoudre le problème et construire le planning de référence du projet avec l’affectation des ressources associées, plate-forme basée sur les algorithmes génétiques. Le modèle a été validé, et ses paramètres ont été affinés via des plans d’expériences pour garantir la meilleure performance. De plus, la robustesse de ces performances a été étudiée sur la résolution complète d’un échantillon de quatre cents projets, classés selon le nombre de leurs tâches. En raison de l’aspect dynamique de l’efficacité des opérateurs, le présent travail examine un ensemble de facteurs qui influencent le développement de leur polyvalence. Les résultats concluent logiquement qu’une entreprise en quête de flexibilité doit accepter des coûts supplémentaires pour développer la polyvalence de ses opérateurs. Afin de maîtriser ces surcoûts, le nombre des opérateurs qui suivent un programme de développement des compétences doit être optimisé, ainsi que, pour chacun d’eux, le degré de ressemblance entre les nouvelles compétences développées et les compétences initiales, ou le nombre de ces compétences complémentaires (toujours pour chacun d’eux), ainsi enfin que la façon dont les heures de travail des opérateurs doivent être réparties sur la période d’acquisition des compétences. Enfin, ce travail ouvre la porte pour la prise en compte future des facteurs humains et de la flexibilité des effectifs pendant l’élaboration d’un planning de référence. ABSTRACT : The growing need of responsiveness for manufacturing companies facing the market volatility raises a strong demand for flexibility in their organization. This flexibility can be used to enhance the robustness of a baseline schedule for a given programme of activities. Since the company personnel are increasingly seen as the core of the organizational structures, they provide the decision-makers with a source of renewable and viable flexibility. First, this work was implemented to model the problem of multi-period workforce allocation on industrial activities with two degrees of flexibility: the annualizing of the working time, which offers opportunities of changing the schedules, individually as well as collectively. The second degree of flexibility is the versatility of operators, which induces a dynamic view of their skills and the need to predict changes in individual performances as a result of successive assignments. The dynamic nature of workforce’s experience was modelled in function of learning-by-doing and of oblivion phenomenon during the work interruption periods. We firmly set ourselves in a context where the expected durations of activities are no longer deterministic, but result from the number and levels of experience of the workers assigned to perform them. After that, the research was oriented to answer the question “What kind of problem is raises the project we are facing to schedule?”: therefore the different dimensions of the project are inventoried and analysed to be measured. For each of these dimensions, the related sensitive assessment methods have been proposed. Relying on the produced correlated measures, the research proposes to aggregate them through a factor analysis in order to produce the main principal components of an instance. Consequently, the complexity or the easiness of solving or realising a given scheduling problem can be evaluated. In that view, we developed a platform software to solve the problem and construct the project baseline schedule with the associated resources allocation. This platform relies on a genetic algorithm. The model has been validated, moreover, its parameters has been tuned to give the best performance, relying on an experimental design procedure. The robustness of its performance was also investigated, by a comprehensive solving of four hundred instances of projects, ranked according to the number of their tasks. Due to the dynamic aspect of the workforce’s experience, this research work investigates a set of different parameters affecting the development of their versatility. The results recommend that the firms seeking for flexibility should accept an amount of extra cost to develop the operators’ multi functionality. In order to control these over-costs, the number of operators who attend a skill development program should be optimised, as well as the similarity of the new developed skills relative to the principal ones, or the number of the additional skills an operator may be trained to, or finally the way the operators’ working hours should be distributed along the period of skill acquisition: this is the field of investigations of the present work which will, in the end, open the door for considering human factors and workforce’s flexibility in generating a work baseline program
    corecore