13,408 research outputs found
Project scheduling under undertainty – survey and research potentials.
The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, that is gradually resolved during project execution. In this survey we review the fundamental approaches for scheduling under uncertainty: reactive scheduling, stochastic project scheduling, stochastic GERT network scheduling, fuzzy project scheduling, robust (proactive) scheduling and sensitivity analysis. We discuss the potentials of these approaches for scheduling projects under uncertainty.Management; Project management; Robustness; Scheduling; Stability;
Models for robust resource allocation in project scheduling.
The vast majority of resource-constrained project scheduling efforts assumes complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. In reality, however, project activities are subject to considerable uncertainty which generally leads to numerous schedule disruptions. In this paper, we present a resource allocation model that protects the makespan of a given baseline schedule against activity duration variability. A branch-and-bound algorithm is developed that solves the proposed robust resource allocation problem in exact and approximate formulations. The procedure relies on constraint propagation during its search. We report on computational results obtained on a set of benchmark problems.Model; Resource allocation; Scheduling;
Recommended from our members
Scheduling reentrant jobs on parallel machines with a remote server
This paper explores a specific combinatorial problem relating to re-entrant jobs on parallel primary machines, with a remote server machine. A middle operation is required by each job on the server before it returns to its primary processing machine. The problem is inspired by the logistics of a semi-automated micro-biology laboratory. The testing programme in the laboratory corresponds roughly to a hybrid flowshop, whose bottleneck stage is the subject of study. We demonstrate the NP-hard nature of the problem, and provide various structural features. A heuristic is developed and tested on randomly generated benchmark data. Results indicate solutions reliably within 1.5% of optimum. We also provide a greedy 2-approximation algorithm. Test on real-life data from the microbiology laboratory indicate a 20% saving relative to current practice, which is more than can be achieved currently with 3 instead of 2 people staffing the primary machines
An ant colony algorithm for the sequential testing problem under precedence constraints.
We consider the problem of minimum cost sequential
testing of a series (parallel) system under precedence
constraints that can be modeled as a nonlinear integer program.
We develop and implement an ant colony algorithm for the
problem. We demonstrate the performance of this algorithm
for special type of instances for which the optimal solutions
can be found in polynomial time. In addition, we compare the
performance of the algorithm with a special branch and bound
algorithm for general instances. The ant colony algorithm is
shown to be particularly effective for larger instances of the
problem
Configurable Strategies for Work-stealing
Work-stealing systems are typically oblivious to the nature of the tasks they
are scheduling. For instance, they do not know or take into account how long a
task will take to execute or how many subtasks it will spawn. Moreover, the
actual task execution order is typically determined by the underlying task
storage data structure, and cannot be changed. There are thus possibilities for
optimizing task parallel executions by providing information on specific tasks
and their preferred execution order to the scheduling system.
We introduce scheduling strategies to enable applications to dynamically
provide hints to the task-scheduling system on the nature of specific tasks.
Scheduling strategies can be used to independently control both local task
execution order as well as steal order. In contrast to conventional scheduling
policies that are normally global in scope, strategies allow the scheduler to
apply optimizations on individual tasks. This flexibility greatly improves
composability as it allows the scheduler to apply different, specific
scheduling choices for different parts of applications simultaneously. We
present a number of benchmarks that highlight diverse, beneficial effects that
can be achieved with scheduling strategies. Some benchmarks (branch-and-bound,
single-source shortest path) show that prioritization of tasks can reduce the
total amount of work compared to standard work-stealing execution order. For
other benchmarks (triangle strip generation) qualitatively better results can
be achieved in shorter time. Other optimizations, such as dynamic merging of
tasks or stealing of half the work, instead of half the tasks, are also shown
to improve performance. Composability is demonstrated by examples that combine
different strategies, both within the same kernel (prefix sum) as well as when
scheduling multiple kernels (prefix sum and unbalanced tree search)
RESCON: Educational project scheduling software.
In this article we discuss a freely downloadable educational software tool for illustrating project scheduling and project management concepts. The tool features exact and heuristic scheduling procedures and visualizes project networks, project schedules, resource profiles, activity slacks, and project duration distributions.Project scheduling; Project management; Educational software; Visualization; Scheduling algorithms;
The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review
Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe
- …