13,408 research outputs found

    Project scheduling under undertainty – survey and research potentials.

    Get PDF
    The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, that is gradually resolved during project execution. In this survey we review the fundamental approaches for scheduling under uncertainty: reactive scheduling, stochastic project scheduling, stochastic GERT network scheduling, fuzzy project scheduling, robust (proactive) scheduling and sensitivity analysis. We discuss the potentials of these approaches for scheduling projects under uncertainty.Management; Project management; Robustness; Scheduling; Stability;

    Models for robust resource allocation in project scheduling.

    Get PDF
    The vast majority of resource-constrained project scheduling efforts assumes complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. In reality, however, project activities are subject to considerable uncertainty which generally leads to numerous schedule disruptions. In this paper, we present a resource allocation model that protects the makespan of a given baseline schedule against activity duration variability. A branch-and-bound algorithm is developed that solves the proposed robust resource allocation problem in exact and approximate formulations. The procedure relies on constraint propagation during its search. We report on computational results obtained on a set of benchmark problems.Model; Resource allocation; Scheduling;

    An ant colony algorithm for the sequential testing problem under precedence constraints.

    Get PDF
    We consider the problem of minimum cost sequential testing of a series (parallel) system under precedence constraints that can be modeled as a nonlinear integer program. We develop and implement an ant colony algorithm for the problem. We demonstrate the performance of this algorithm for special type of instances for which the optimal solutions can be found in polynomial time. In addition, we compare the performance of the algorithm with a special branch and bound algorithm for general instances. The ant colony algorithm is shown to be particularly effective for larger instances of the problem

    Configurable Strategies for Work-stealing

    Full text link
    Work-stealing systems are typically oblivious to the nature of the tasks they are scheduling. For instance, they do not know or take into account how long a task will take to execute or how many subtasks it will spawn. Moreover, the actual task execution order is typically determined by the underlying task storage data structure, and cannot be changed. There are thus possibilities for optimizing task parallel executions by providing information on specific tasks and their preferred execution order to the scheduling system. We introduce scheduling strategies to enable applications to dynamically provide hints to the task-scheduling system on the nature of specific tasks. Scheduling strategies can be used to independently control both local task execution order as well as steal order. In contrast to conventional scheduling policies that are normally global in scope, strategies allow the scheduler to apply optimizations on individual tasks. This flexibility greatly improves composability as it allows the scheduler to apply different, specific scheduling choices for different parts of applications simultaneously. We present a number of benchmarks that highlight diverse, beneficial effects that can be achieved with scheduling strategies. Some benchmarks (branch-and-bound, single-source shortest path) show that prioritization of tasks can reduce the total amount of work compared to standard work-stealing execution order. For other benchmarks (triangle strip generation) qualitatively better results can be achieved in shorter time. Other optimizations, such as dynamic merging of tasks or stealing of half the work, instead of half the tasks, are also shown to improve performance. Composability is demonstrated by examples that combine different strategies, both within the same kernel (prefix sum) as well as when scheduling multiple kernels (prefix sum and unbalanced tree search)

    RESCON: Educational project scheduling software.

    Get PDF
    In this article we discuss a freely downloadable educational software tool for illustrating project scheduling and project management concepts. The tool features exact and heuristic scheduling procedures and visualizes project networks, project schedules, resource profiles, activity slacks, and project duration distributions.Project scheduling; Project management; Educational software; Visualization; Scheduling algorithms;

    The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review

    Get PDF
    Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe
    • …
    corecore