2,159 research outputs found
A hybrid shifting bottleneck-tabu search heuristic for the job shop total weighted tardiness problem
In this paper, we study the job shop scheduling problem with the objective of minimizing the total weighted tardiness. We propose a hybrid shifting bottleneck - tabu search (SB-TS) algorithm by replacing the reoptimization step in the shifting bottleneck (SB) algorithm by a tabu search (TS). In terms of the shifting bottleneck heuristic, the proposed tabu search optimizes the total weighted tardiness for partial schedules in which some machines are currently assumed to have infinite capacity. In the context of tabu search, the shifting bottleneck heuristic features a long-term memory which helps to diversify the local search. We exploit this synergy to develop a state-of-the-art algorithm for the job shop total weighted tardiness problem (JS-TWT). The computational
effectiveness of the algorithm is demonstrated on standard benchmark instances from the literature
A survey of scheduling problems with setup times or costs
Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe
Optimizing production scheduling of steel plate hot rolling for economic load dispatch under time-of-use electricity pricing
Time-of-Use (TOU) electricity pricing provides an opportunity for industrial
users to cut electricity costs. Although many methods for Economic Load
Dispatch (ELD) under TOU pricing in continuous industrial processing have been
proposed, there are still difficulties in batch-type processing since power
load units are not directly adjustable and nonlinearly depend on production
planning and scheduling. In this paper, for hot rolling, a typical batch-type
and energy intensive process in steel industry, a production scheduling
optimization model for ELD is proposed under TOU pricing, in which the
objective is to minimize electricity costs while considering penalties caused
by jumps between adjacent slabs. A NSGA-II based multi-objective production
scheduling algorithm is developed to obtain Pareto-optimal solutions, and then
TOPSIS based multi-criteria decision-making is performed to recommend an
optimal solution to facilitate filed operation. Experimental results and
analyses show that the proposed method cuts electricity costs in production,
especially in case of allowance for penalty score increase in a certain range.
Further analyses show that the proposed method has effect on peak load
regulation of power grid.Comment: 13 pages, 6 figures, 4 table
- …