98,788 research outputs found

    A Conceptual Model of Client-driven Agile Requirements Prioritization: Results of a Case Study

    Get PDF
    ABSTRACT Requirements (re)prioritization is an essential mechanism of agile development approaches to maximize the value for the clients and to accommodate changing requirements. Yet, in the agile Requirements Engineering (RE) literature, very little is known about how agile (re)prioritization happens in practice. Conceptual models about this process are missing, which, in turn, makes it difficult for both practitioners and researchers to reason about requirements decision-making at inter-iteration time. We did a multiple case study on agile requirements prioritization methods to yield a conceptual model for understanding the inter-iteration prioritization process. The model is derived by using interview data from practitioners in 8 development organizations. Such a model makes explicit the concepts that are used tacitly in the agile requirements prioritization practice and can be used for structuring future empirical investigations about this topic, and for analyzing, supporting, and improving the process in real-life projects

    Requirements Prioritization Based on Benefit and Cost Prediction: A Method Classification Framework

    Get PDF
    In early phases of the software development process, requirements prioritization necessarily relies on the specified requirements and on predictions of benefit and cost of individual requirements. This paper induces a conceptual model of requirements prioritization based on benefit and cost. For this purpose, it uses Grounded Theory. We provide a detailed account of the procedures and rationale of (i) how we obtained our results and (ii) how we used them to form the basis for a framework for classifying requirements prioritization methods

    Data-driven through-life costing to support product lifecycle management solutions in innovative product development

    Get PDF
    Innovative product usually refers to product that comprises of creativity and new ideas. In the development of such a new product, there is often a lack of historical knowledge and data available to be used to perform cost estimation accurately. This is due to the fact that traditional cost estimation methods are used to predict costs only after a product model has been built, and not at an early design stage when there is little data and information available. In light of this, original equipment manufacturers are also facing critical challenges of becoming globally competitive and increasing demands from customer for continuous innovation. To alleviate these situations this research has identified a new approach to cost modelling with the inclusion of product lifecycle management solutions to address innovative product development.The aim of this paper, therefore, is to discuss methods of developing an extended-enterprise data-driven through-life cost estimating method for innovative product development

    Root Cause Analysis in Business Processes

    Get PDF
    Conceptual modeling is an important tool for understanding and revealing weaknesses of business processes. Yet, the current practice in reengineering projects often considers simply the as-is control flow and uses the respective model barely as a reference for brain-storming about improvement opportunities. This approach heavily relies on the intuition of the participants and misses a clear description of steps to identify root causes of problems. In contrast to that, this paper introduces a systematic methodology to detect and document the quality dimension of a business process. It builds on the definition of softgoals for each process activity, of correlations between softgoals, and metrics to measure the occurrence of quality issues. In this regard our contribution is a foundation of root-cause analysis in business process modeling, and a conceptual integration of goal-based and activity-based approaches to capturing processes

    A framework for integrating syntax, semantics and pragmatics for computer-aided professional practice: With application of costing in construction industry

    Get PDF
    Producing a bill of quantity is a knowledge-based, dynamic and collaborative process, and evolves with variances and current evidence. However, within the context of information system practice in BIM, knowledge of cost estimation has not been represented, nor has it been integrated into the processes based on BIM. This paper intends to establish an innovative means of taking data from the BIM linked to a project, and using it to create the necessary items for a bill of quantity that will enable cost estimation to be undertaken for the project. Our framework is founded upon the belief that three components are necessary to gain a full awareness of the domain which is being computerised; the information type which is to be assessed for compatibility (syntax), the definition for the pricing domain (semantics), and the precise implementation environment for the standards being taken into account (pragmatics). In order to achieve this, a prototype is created that allows a cost item for the bill of quantity to be spontaneously generated, by means of the semantic web ontology and a forward chain algorithm. Within this paper, ‘cost items’ signify the elements included in a bill of quantity, including details of their description, quantity and price. As a means of authenticating the process being developed, the authors of this work effectively implemented it in the production of cost items. In addition, the items created were contrasted with those produced by specialists. For this reason, this innovative framework introduces the possibility of a new means of applying semantic web ontology and forward chain algorithm to construction professional practice resulting in automatic cost estimation. These key outcomes demonstrate that, decoupling the professional practice into three key components of syntax, semantics and pragmatics can provide tangible benefits to domain use

    Implementing 5D BIM on construction projects: Contractor perspectives from the UK construction sector

    Get PDF
    This is an accepted manuscript of an article published by Emerald in Journal of Engineering, Design and Technology on 09/05/2020: https://doi.org/10.1108/JEDT-01-2020-0007 The accepted version of the publication may differ from the final published version.Purpose The purpose of this paper is to report on primary research findings that sought to investigate and analyse salient issues on the implementation of 5D building information modelling (BIM) from the UK contractors’ perspective. Previous research and efforts have predominantly focussed on the use of technologies for cost estimation and quantity takeoff within a more traditional-led procurement, with a paucity of research focussing on how 5D BIM could facilitate costing within contractor-led procurement. This study fills this current knowledge gap and enhances the understanding of the specific costing challenges faced by contractors in contractor-led projects, leading to the development of 5D framework for use in future projects. Design/methodology/approach To develop a fully detailed understanding of the challenges and issues being faced in this regard, a phenomenological, qualitative-based study was undertaken through interviews involving 21 participants from UK-wide construction organisations. A thematic data analytical process was applied to the data to derive key issues, and this was then used to inform the development of a 5D-BIM costing framework. Findings Multi-disciplinary findings reveal a range of issues faced by contractors when implementing 5D BIM. These exist at strategic, operational and technological levels which require addressing successful implementation of 5D BIM on contractor-led projects adhering to Level 2 BIM standards. These findings cut across the range of stakeholders on contractor-led projects. Ultimately, the findings suggest strong commitment and leadership from organisational management are required to facilitate cost savings and generate accurate cost information. Practical implications This study highlights key issues for any party seeking to effectively deploy 5D BIM on a contractor-led construction project. A considerable cultural shift towards automating and digitising cost functions virtually, stronger collaborative working relationship relative to costing in design development, construction practice, maintenance and operation is required. Originality/value By analysing findings from primary research data, the work concludes with the development of a 5D BIM costing framework to support contractor-led projects which can be implemented to ensure that 5D BIM is successfully implemented

    Exploiting a Goal-Decomposition Technique to Prioritize Non-functional Requirements

    Get PDF
    Business stakeholders need to have clear and realistic goals if they want to meet commitments in application development. As a consequence, at early stages they prioritize requirements. However, requirements do change. The effect of change forces the stakeholders to balance alternatives and reprioritize requirements accordingly. In this paper we discuss the problem of priorities to non-functional requirements subjected to change. We, then, propose an approach to help smooth the impact of such changes. Our approach favors the translation of nonoperational specifications into operational definitions that can be evaluated once the system is developed. It uses the goal-question-metric method as the major support to decompose non-operational specifications into operational ones. We claim that the effort invested in operationalizing NFRs helps dealing with changing requirements during system development. Based on\ud this transformation and in our experience, we provide guidelines to prioritize volatile non-functional requirements

    Product design-Process selection-Process planning Integration based on Modelling and Simulation

    Get PDF
    As a solution for traditional design process having many drawbacks in the manufacturing process, the integration of Product design-Process selection-Process planning is carried out in the early design phase. The technological, economic, and logistic parameters are taken into account simultaneously as well as manufacturing constraints being integrated into the product design. As a consequence, the most feasible alternative with regard to the product’s detailed design is extracted satisfying the product’s functional requirements. Subsequently, a couple of conceptual process plans are proposed relied on manufacturing processes being preliminarily selected in the conceptual design phase. Virtual manufacturing is employed under CAM software to simulate fabrication process of the potential process plans. Ultimately, the most suitable process plan for fabricating the part is recommended based upon a multi-criteria analysis as a resolution for decision making

    Rightsizing LISA

    Get PDF
    The LISA science requirements and conceptual design have been fairly stable for over a decade. In the interest of reducing costs, the LISA Project at NASA has looked for simplifications of the architecture, at downsizing of subsystems, and at descopes of the entire mission. This is a natural activity of the formulation phase, and one that is particularly timely in the current NASA budgetary context. There is, and will continue to be, enormous pressure for cost reduction from both ESA and NASA, reviewers and the broader research community. Here, the rationale for the baseline architecture is reviewed, and recent efforts to find simplifications and other reductions that might lead to savings are reported. A few possible simplifications have been found in the LISA baseline architecture. In the interest of exploring cost sensitivity, one moderate and one aggressive descope have been evaluated; the cost savings are modest and the loss of science is not.Comment: To be published in Classical and Quantum Gravity; Proceedings of the Seventh International LISA Symposium, Barcelona, Spain, 16-20 Jun. 2008; 10 pages, 1 figure, 3 table
    • 

    corecore