38,348 research outputs found

    Iterated-greedy-based algorithms with beam search initialization for the permutation flowshop to minimize total tardiness

    Get PDF
    The permutation flow shop scheduling problem is one of the most studied operations research related problems. Literally, hundreds of exact and approximate algorithms have been proposed to optimise several objective functions. In this paper we address the total tardiness criterion, which is aimed towards the satisfaction of customers in a make-to-order scenario. Although several approximate algorithms have been proposed for this problem in the literature, recent contributions for related problems suggest that there is room for improving the current available algorithms. Thus, our contribution is twofold: First, we propose a fast beam-search-based constructive heuristic that estimates the quality of partial sequences without a complete evaluation of their objective function. Second, using this constructive heuristic as initial solution, eight variations of an iterated-greedy-based algorithm are proposed. A comprehensive computational evaluation is performed to establish the efficiency of our proposals against the existing heuristics and metaheuristics for the problem.Ministerio de Ciencia e Innovación DPI2013-44461-PMinisterio de Ciencia e Innovación DPI2016-80750-

    Single machine scheduling with general positional deterioration and rate-modifying maintenance

    Get PDF
    We present polynomial-time algorithms for single machine problems with generalized positional deterioration effects and machine maintenance. The decisions should be taken regarding possible sequences of jobs and on the number of maintenance activities to be included into a schedule in order to minimize the overall makespan. We deal with general non-decreasing functions to represent deterioration rates of job processing times. Another novel extension of existing models is our assumption that a maintenance activity does not necessarily fully restore the machine to its original perfect state. In the resulting schedules, the jobs are split into groups, a particular group to be sequenced after a particular maintenance period, and the actual processing time of a job is affected by the group that job is placed into and its position within the group

    Project scheduling under undertainty – survey and research potentials.

    Get PDF
    The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, that is gradually resolved during project execution. In this survey we review the fundamental approaches for scheduling under uncertainty: reactive scheduling, stochastic project scheduling, stochastic GERT network scheduling, fuzzy project scheduling, robust (proactive) scheduling and sensitivity analysis. We discuss the potentials of these approaches for scheduling projects under uncertainty.Management; Project management; Robustness; Scheduling; Stability;

    Minimizing Flow-Time on Unrelated Machines

    Get PDF
    We consider some flow-time minimization problems in the unrelated machines setting. In this setting, there is a set of mm machines and a set of nn jobs, and each job jj has a machine dependent processing time of pijp_{ij} on machine ii. The flow-time of a job is the total time the job spends in the system (completion time minus its arrival time), and is one of the most natural quality of service measure. We show the following two results: an O(min(log2n,lognlogP))O(\min(\log^2 n,\log n \log P)) approximation algorithm for minimizing the total-flow time, and an O(logn)O(\log n) approximation for minimizing the maximum flow-time. Here PP is the ratio of maximum to minimum job size. These are the first known poly-logarithmic guarantees for both the problems.Comment: The new version fixes some typos in the previous version. The paper is accepted for publication in STOC 201

    Learning Scheduling Algorithms for Data Processing Clusters

    Full text link
    Efficiently scheduling data processing jobs on distributed compute clusters requires complex algorithms. Current systems, however, use simple generalized heuristics and ignore workload characteristics, since developing and tuning a scheduling policy for each workload is infeasible. In this paper, we show that modern machine learning techniques can generate highly-efficient policies automatically. Decima uses reinforcement learning (RL) and neural networks to learn workload-specific scheduling algorithms without any human instruction beyond a high-level objective such as minimizing average job completion time. Off-the-shelf RL techniques, however, cannot handle the complexity and scale of the scheduling problem. To build Decima, we had to develop new representations for jobs' dependency graphs, design scalable RL models, and invent RL training methods for dealing with continuous stochastic job arrivals. Our prototype integration with Spark on a 25-node cluster shows that Decima improves the average job completion time over hand-tuned scheduling heuristics by at least 21%, achieving up to 2x improvement during periods of high cluster load