200,262 research outputs found

    A survey of variants and extensions of the resource-constrained project scheduling problem

    Get PDF
    The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized. It has become a well-known standard problem in the context of project scheduling which has attracted numerous researchers who developed both exact and heuristic scheduling procedures. However, it is a rather basic model with assumptions that are too restrictive for many practical applications. Consequently, various extensions of the basic RCPSP have been developed. This paper gives an overview over these extensions. The extensions are classified according to the structure of the RCPSP. We summarize generalizations of the activity concept, of the precedence relations and of the resource constraints. Alternative objectives and approaches for scheduling multiple projects are discussed as well. In addition to popular variants and extensions such as multiple modes, minimal and maximal time lags, and net present value-based objectives, the paper also provides a survey of many less known concepts. --project scheduling,modeling,resource constraints,temporal constraints,networks

    Modelling a Maintenance Scheduling Problem with Alternative Resources

    Get PDF
    Effective management of maintenance in buildings can have a signi cant impact on the total life cycle costs and on the building energy use. Nevertheless, the building maintenance scheduling problem has been infrequently studied. In this paper, we present constraint-based scheduling models for the building maintenance scheduling problem, where each activity has a set of alternative resources. We consider two di erent models, one using basic constraints, and the other using our new and modi fied global constraints, which handle alternative disjunctive resources for each activity to allow propagation before activities are assigned to resources. We evaluate these models on randomly generated problems and show that while the basic model is faster on smaller problems, the global con- straint model scales better

    Flexible Envelope Request Notation (FERN)

    Get PDF
    The following topics are presented in view graph form and include the following: scheduling application; the motivation for the Flexible Envelope Request Notation (FERN); characteristics of FERN; types of information needed in requests; where information is stored in requests; FERN structures; generic requests; resource availability for pooled resources; expressive notation; temporal constraints; time formats; changes to FERN; sample FERN requests; the temporal relationship between two steps; maximum activity length to limit step delays; alternative requests; the temporal relationship between two activities; and idle resource usage between steps

    Multi-mode resource constrained multi-project scheduling and resource portfolio problem

    Get PDF
    This paper introduces a multi-project problem environment which involves multiple projects with assigned due dates; with activities that have alternative resource usage modes; a resource dedication policy that does not allow sharing of resources among projects throughout the planning horizon; and a total budget. There are three issues to face when investigating this multiproject environment. First, the total budget should be distributed among different resource types to determine the general resource capacities which correspond to the total amount for each renewable resource to be dedicated to the projects. With the general resource capacities at hand, the next issue is to determine the amounts of resources to be dedicated to the individual projects. With the dedication of resources accomplished, the scheduling of the projects' activities reduces to the multi-mode resource constrained project scheduling problem (MRCPSP) for each individual project. Finally the last issue is the effcient solution of the resulting MRCPSPs. In this paper, this multi-project environment is modeled in an integrated fashion and designated as the Resource Portfolio Problem. A two-phase and a monolithic genetic algorithm are proposed as two solution approaches each of which employs a new improvement move designated as the combinatorial auction for resource portfolio and the combinatorial auction for resource dedication. Computational study using test problems demonstrated the effectiveness of the solution approach proposed

    Potential role for clinical calibration to increase engagement with and application of home telemonitoring: a report from the HeartCycle programme

    Get PDF
    Aims: There is a need for alternative strategies that might avoid recurrent admissions in patients with heart failure. Home Telemonitoring (HTM) to monitor patient’s symptoms from a distance may be useful. This study attempts to assess changes in HTM vital signs in response to daily life activities (variations in medication, salt intake, exercise and stress) and to stablish which variations affect weight, blood pressure (BP) and heart rate (HR). Methods and results: We assessed 76 patients with heart failure (mean age 76 ± 10.8 years, 75% male, mainly in NYHA class II/III and from ischaemic etiology cause). Patients were given a calendar of interventions scheduling activities approximately twice-a-week before measuring their vital signs. Eating salty food or a large meal were the activities that had a significant impact on weight gain (+0.3 kg; p<0.001 and p=0.006, respectively). Exercise and skipping a dose of medication other than diuretics increased heart rate (+3 bpm, p=0.001 and almost +2 bpm, p=0.016, respectively). Conclusions: Our HTM system was able to detect small changes in vital signs related to these activities. Further studies should assess if providing such a schedule of activities might be useful for patient education and could improve long-term adherence to recommended lifestyle changes

    Resource preference based improvement heuristics for resource portfolio problem

    Get PDF
    The multi-project problem environment under consideration involves multiple-projects with activities having alternative execution modes, a general resource budget and a resource management policy that does not allow sharing of resources among projects. The multi-project scheduling model for this problem environment is called Resource Portfolio Problem. There are three basic conceptual problems in RPP: (i) determining the general resource capacities from the given general resource budget (general resource capacities determination); (ii) dedication of the general resource capacities to projects (resource dedication) and finally (iii) scheduling of individual projects with the given resource dedications. In this study, different preference based improvement heuristics are proposed for general resource capacities determination and resource dedication conceptual problems. For general resource capacities determination, the current general resource capacity values are changed according to the resource preferences such that the resulting capacity state would be more preferable. Similarly for resource dedication, resource dedication values of projects are changed according to the preferences of projects for resources such that the resulting resource dedication state would be more preferable. These two improvement heuristics separates and couples the conceptual problems. Different preference calculation methods are proposed employing Lagrangian relaxation and linear relaxation of MRCPSP formulation

    Potential role for clinical calibration to increase engagement with and application of home telemonitoring: a report from the HeartCycle programme

    Get PDF
    Aims: There is a need for alternative strategies that might avoid recurrent admissions in patients with heart failure. home telemonitoring (HTM) to monitor patient's symptoms from a distance may be useful. This study attempts to assess changes in HTM vital signs in response to daily life activities (variations in medication, salt intake, exercise, and stress) and to establish which variations affect weight, blood pressure, and heart rate. Methods and results: We assessed 76 patients with heart failure (mean age 76 ± 10.8 years, 75% male, mainly in NYHA class II/III and from ischaemic aetiology cause). Patients were given a calendar of interventions scheduling activities approximately twice a week before measuring their vital signs. Eating salty food or a large meal were the activities that had a significant impact on weight gain (+0.3 kg; P &lt; 0.001 and P = 0.006, respectively). Exercise and skipping a dose of medication other than diuretics increased heart rate (+3 bpm, P = 0.001 and almost +2 bpm, P = 0.016, respectively). Conclusions: Our HTM system was able to detect small changes in vital signs related to these activities. Further studies should assess if providing such a schedule of activities might be useful for patient education and could improve long-term adherence to recommended lifestyle changes

    Ada task scheduling: A focused Ada investigation

    Get PDF
    The types of control that are important for real time task scheduling are discussed. Some closely related real time issues are mentioned and major committee and research activities in this area are delineated. Although there are some problems with Ada and its real time task scheduling, Ada presents fewer than any known alternative. Ada was designed for the domain of real time embedded systems, but Ada compilers may not contain a level of task scheduling support that is adequate for all real time applications. The question addressed is which implementations of Ada's task scheduling are adequate for effective real time systems for NASA applications
    corecore