198 research outputs found

    Research on responses of container ports to global pandemic

    Get PDF

    Research on the System Safety Management in Urban Railway

    Get PDF
    Nowadays, rail transport has become one of the most widely utilised forms of transport thanks to its high safety level, large capacity, and cost-effectiveness. With the railway network's continuous development, including urban rail transit, one of the major areas of increasing attention and demand is ensuring safety or risk management in operation long-term remains for the whole life cycle by scientific tools, management of railway operation (Martani 2017), specifically in developed and developing countries like Vietnam. The situation in Vietnam demonstrates that the national mainline railway network has been built and operated entirely in a single narrow gauge (1000mm) since the previous century, with very few updates of manual operating technology. This significantly highlights that up to now, the conventional technique for managing the safety operation in general, and collision in particular, of the current Vietnamese railway system, including its subsystems, is only accident statistics which is not a scientific-based tool as the others like risk identify and analyse methods, risk mitigation…, that are already available in many countries. Accident management of Vietnam Railways is limited and responsible for accident statistics analysis to avoid and minimise the harm caused by phenomena that occur only after an accident. Statistical analysis of train accident case studies in Vietnam railway demonstrates that, because hazards and failures that could result in serious system occurrences (accidents and incidents) have not been identified, recorded, and evaluated to conduct safety-driven risk analysis using a well-suited assessment methodology, risk prevention and control cannot be achieved. Not only is it hard to forecast and avoid events, but it may also raise the chance and amount of danger, as well as the severity of the later effects. As a result, Vietnam's railway system has a high number of accidents and failure rates. For example, Vietnam Rail-ways' mainline network accounted for approximately 200 railway accidents in 2018, a 3% increase over the previous year, including 163 collisions between trains and road vehicles/persons, resulting in more than 100 fatalities and more than 150 casualties; 16 accidents, including almost derailments, the signal passed at danger… without fatality or casual-ty, but significant damage to rolling stock and track infrastructure (VR 2021). Focusing and developing a new standardised framework for safety management and availability of railway operation in Vietnam is required in view of the rapid development of rail urban transport in the country in recent years (VmoT 2016; VmoT 2018). UMRT Line HN2A in southwest Hanoi is the country's first elevated light rail transit line, which was completed and officially put into revenue service in November 2021. This greatly highlights that up to the current date, the UMRT Line HN2A is the first and only railway line in Vietnam with operational safety assessment launched for the first time and long-term remains for the whole life cycle. The fact that the UMRT Hanoi has a large capacity, more complicated rolling stock and infrastructure equipment, as well as a modern communica-tion-based train control (CBTC) signalling system and automatic train driving without the need for operator intervention (Lindqvist 2006), are all advantages. Developing a compatible and integrated safety management system (SMS) for adaption to the safety operating requirements of this UMRT is an important major point of concern, and this should be proven. In actuality, the system acceptance and safety certification phase for Metro Line HN2A prolonged up to 2.5 years owing to the identification of difficulties with noncompliance to safety requirements resulting from inadequate SMS documents and risk assessment. These faults and hazards have developed during the manufacturing and execution of the project; it is impossible to go back in time to correct them, and it is also impossible to ignore the project without assuming responsibility for its management. At the time of completion, the HN2A metro line will have required an expenditure of up to $868 million, thus it is vital to create measures to prevent system failure and assure passenger safety. This dissertation has reviewed the methods to solve the aforementioned challenges and presented a solution blueprint to attain the European standard level of system safety in three-phase as in the following: • Phase 1: applicable for lines that are currently in operation, such as Metro Line HN2A. Focused on operational and maintenance procedures, as well as a training plan for railway personnel, in order to enhance human performance. Complete and update the risk assessment framework for Metro Line HN2A. The dissertation's findings are described in these applications. • Phase 2: applicable for lines that are currently in construction and manufacturing, such as Metro Line HN3, Line HN2, HCMC Line 1 and Line 2. Continue refining and enhancing engineering management methods introduced during Phase 1. On the basis of the risk assessment by manufacturers (Line HN3, HCMC Line 2 with European manufacturers) and the risk assessment framework described in Chapter 4, a risk management plan for each line will be developed. Building Accident database for risk assessment research and development. • Phase 3: applicable for lines that are currently in planning. Enhance safety requirements and life-cycle management. Building a proactive Safety Culture step by step for the railway industry. This material is implemented gradually throughout all three phases, beginning with the creation of the concept and concluding with an improvement in the attitude of railway personnel on the HN2A line. In addition to this overview, Chapters 4 through Chapter 9 of the dissertation include particular solutions for Risk assessment, Vehicle and Infrastructure Maintenance methods, Inci-dent Management procedures, and Safety Culture installation. This document focuses on constructing a system safety concept for railway personnel, providing stringent and scientific management practises to assure proper engineering conditions, to manage effectively the metro line system, and ensuring passenger safety in Hanoi's metro operatio

    Application of Optimization in Production, Logistics, Inventory, Supply Chain Management and Block Chain

    Get PDF
    The evolution of industrial development since the 18th century is now experiencing the fourth industrial revolution. The effect of the development has propagated into almost every sector of the industry. From inventory to the circular economy, the effectiveness of technology has been fruitful for industry. The recent trends in research, with new ideas and methodologies, are included in this book. Several new ideas and business strategies are developed in the area of the supply chain management, logistics, optimization, and forecasting for the improvement of the economy of the society and the environment. The proposed technologies and ideas are either novel or help modify several other new ideas. Different real life problems with different dimensions are discussed in the book so that readers may connect with the recent issues in society and industry. The collection of the articles provides a glimpse into the new research trends in technology, business, and the environment

    Fuzzy Sets Applications in Civil Engineering Basic Areas

    Get PDF
    Civil engineering is a professional engineering discipline that deals with the design, construction, and maintenance of the physical and naturally built environment, including works like roads, bridges, canals, dams, and buildings. This paper presents some Fuzzy Logic (FL) applications in civil engeering discipline and shows the potential of facilities of FL in this area. The potential role of fuzzy sets in analysing system and human uncertainty is investigated in the paper. The main finding of this inquiry is FL applications used in different areas of civil engeering discipline with success. Once developed, the fuzzy logic models can be used for further monitoring activities, as a management tool

    implications to CRM and public policy

    Get PDF
    Thesis(Doctoral) --KDI School:Ph.D in Public Policy,2017With the advent of the Internet and Mobile Communications, the nature of communication has changed significantly over the past few decades .The promotion of technologies among the common people has been found to be an important element of public policy to reduce the digital divide. The rapid advancement of information technology (IT), automation systems and data communications systems leads to improvement of intelligent transport systems (ITS). ITS covers all branches of transportation and involves all dynamically interacting elements of transportation system, i.e. transport means, infrastructure, drivers and commuters. However, few researches have been carried out in the context of public sectors, especially that involving ITS. The purpose of this study is to investigate the justice dimensions that influence satisfaction and public confidence in the context of ITS and to explore implications to Citizen/Customer Relationship Management (CRM) and public policy. This study investigates the following research questions: i) Do levels of perceived justice (distributive, procedural and interactional) in ITS environment affect levels of satisfaction/dissatisfaction? ii) Do levels of satisfaction form ITS affect levels of public confidence? iii) Do levels of dissatisfaction form ITS affect levels of willingness to complain? iv) Do levels of dissatisfaction form ITS affect levels of complaining behavior? v) Do levels of complaining behavior in ITS environment affect levels of satisfaction with complaint handling when the complaints are resolved based on three dimensions (distributive, procedural and interactional)of justice? vi) Do levels of willingness to complain in ITS environment affect levels of public confidence? vii) Do levels of satisfaction with complaint handling in ITS environment affect levels of public confidence? The findings of this study imply that ITS users are more importantly perceive to equity and equality issues, or distributive justice. The employment of ITS should not be limited to the technical aspects of ITS, but should focus more attention on the subjective domain of justice. The results of this study also have important implications for public complaint handling in terms of increasing public satisfaction with ITS, which is crucial for CRM.Part I: Exploring Satisfaction/Dissatisfaction and Public Confidence in the ITS Environment; Implications to CRM and Public Policy Part II: ComparingSatisfaction/Dissatisfaction and Public Confidence in the ITS Environment in Public and Private Transportation Part III: Implementation Strategy of ITS in Developing CountriesdoctoralpublishedA. K. M. Anisur RAHMAN

    Modelling of interactions between rail service and travel demand: a passenger-oriented analysis

    Get PDF
    The proposed research is situated in the field of design, management and optimisation in railway network operations. Rail transport has in its favour several specific features which make it a key factor in public transport management, above all in high-density contexts. Indeed, such a system is environmentally friendly (reduced pollutant emissions), high-performing (high travel speeds and low values of headways), competitive (low unitary costs per seat-km or carried passenger-km) and presents a high degree of adaptability to intermodality. However, it manifests high vulnerability in the case of breakdowns. This occurs because a faulty convoy cannot be easily overtaken and, sometimes, cannot be easily removed from the line, especially in the case of isolated systems (i.e. systems which are not integrated into an effective network) or when a breakdown occurs on open tracks. Thus, re-establishing ordinary operational conditions may require excessive amounts of time and, as a consequence, an inevitable increase in inconvenience (user generalised cost) for passengers, who might decide to abandon the system or, if already on board, to exclude the railway system from their choice set for the future. It follows that developing appropriate techniques and decision support tools for optimising rail system management, both in ordinary and disruption conditions, would consent a clear influence of the modal split in favour of public transport and, therefore, encourage an important reduction in the externalities caused by the use of private transport, such as air and noise pollution, traffic congestion and accidents, bringing clear benefits to the quality of life for both transport users and non-users (i.e. individuals who are not system users). Managing to model such a complex context, based on numerous interactions among the various components (i.e. infrastructure, signalling system, rolling stock and timetables) is no mean feat. Moreover, in many cases, a fundamental element, which is the inclusion of the modelling of travel demand features in the simulation of railway operations, is neglected. Railway transport, just as any other transport system, is not finalised to itself, but its task is to move people or goods around, and, therefore, a realistic and accurate cost-benefit analysis cannot ignore involved flows features. In particular, considering travel demand into the analysis framework presents a two-sided effect. Primarily, it leads to introduce elements such as convoy capacity constraints and the assessment of dwell times as flow-dependent factors which make the simulation as close as possible to the reality. Specifically, the former allows to take into account the eventuality that not all passengers can board the first arriving train, but only a part of them, due to overcrowded conditions, with a consequent increase in waiting times. Due consideration of this factor is fundamental because, if it were to be repeated, it would make a further contribution to passengers’ discontent. While, as regards the estimate of dwell times on the basis of flows, it becomes fundamental in the planning phase. In fact, estimating dwell times as fixed values, ideally equal for all runs and all stations, can induce differences between actual and planned operations, with a subsequent deterioration in system performance. Thus, neglecting these aspects, above all in crowded contexts, would render the simulation distorted, both in terms of costs and benefits. The second aspect, on the other hand, concerns the correct assessment of effects of the strategies put in place, both in planning phases (strategic decisions such as the realisation of a new infrastructure, the improvement of the current signalling system or the purchasing of new rolling stock) and in operational phases (operational decisions such as the definition of intervention strategies for addressing disruption conditions). In fact, in the management of failures, to date, there are operational procedures which are based on hypothetical times for re-establishing ordinary conditions, estimated by the train driver or by the staff of the operation centre, who, generally, tend to minimise the impact exclusively from the company’s point of view (minimisation of operational costs), rather than from the standpoint of passengers. Additionally, in the definition of intervention strategies, passenger flow and its variation in time (different temporal intervals) and space (different points in the railway network) are rarely considered. It appears obvious, therefore, how the proposed re-examination of the dispatching and rescheduling tasks in a passenger-orientated perspective, should be accompanied by the development of estimation and forecasting techniques for travel demand, aimed at correctly taking into account the peculiarities of the railway system; as well as by the generation of ad-hoc tools designed to simulate the behaviour of passengers in the various phases of the trip (turnstile access, transfer from the turnstiles to the platform, waiting on platform, boarding and alighting process, etc.). The latest workstream in this present study concerns the analysis of the energy problems associated to rail transport. This is closely linked to what has so far been described. Indeed, in order to implement proper energy saving policies, it is, above all, necessary to obtain a reliable estimate of the involved operational times (recovery times, inversion times, buffer times, etc.). Moreover, as the adoption of eco-driving strategies generates an increase in passenger travel times, with everything that this involves, it is important to investigate the trade-off between energy efficiency and increase in user generalised costs. Within this framework, the present study aims at providing a DSS (Decision Support System) for all phases of planning and management of rail transport systems, from that of timetabling to dispatching and rescheduling, also considering space-time travel demand variability as well as the definition of suitable energy-saving policies, by adopting a passenger-orientated perspective

    Planning and Scheduling Optimization

    Get PDF
    Although planning and scheduling optimization have been explored in the literature for many years now, it still remains a hot topic in the current scientific research. The changing market trends, globalization, technical and technological progress, and sustainability considerations make it necessary to deal with new optimization challenges in modern manufacturing, engineering, and healthcare systems. This book provides an overview of the recent advances in different areas connected with operations research models and other applications of intelligent computing techniques used for planning and scheduling optimization. The wide range of theoretical and practical research findings reported in this book confirms that the planning and scheduling problem is a complex issue that is present in different industrial sectors and organizations and opens promising and dynamic perspectives of research and development
    • …
    corecore