    Welcome to OR&S! Where students, academics and professionals come together

    Get PDF
    In this manuscript, an overview is given of the activities done at the Operations Research and Scheduling (OR&S) research group of the faculty of Economics and Business Administration of Ghent University. Unlike the book published by [1] that gives a summary of all academic and professional activities done in the field of Project Management in collaboration with the OR&S group, the focus of the current manuscript lies on academic publications and the integration of these published results in teaching activities. An overview is given of the publications from the very beginning till today, and some of the topics that have led to publications are discussed in somewhat more detail. Moreover, it is shown how the research results have been used in the classroom to actively involve students in our research activities

    The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review

    Get PDF
    Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe

    Resource-constrained project scheduling.

    Get PDF
    Abstract: Resource-constrained project scheduling involves the scheduling of project activities subject to precedence and resource constraints in order to meet the objective(s) in the best possible way. The area covers a wide variety of problem types. The objective of this paper is to provide a survey of what we believe are important recent in the area . Our main focus will be on the recent progress made in and the encouraging computational experience gained with the use of optimal solution procedures for the basic resource-constrained project scheduling problem (RCPSP) and important extensions. The RCPSP involves the scheduling of a project its duration subject to zero-lag finish-start precedence constraints of the PERT/CPM type and constant availability constraints on the required set of renewable resources. We discuss recent striking advances in dealing with this problem using a new depth-first branch-and-bound procedure, elaborating on the effective and efficient branching scheme, bounding calculations and dominance rules, and discuss the potential of using truncated branch-and-bound. We derive a set of conclusions from the research on optimal solution procedures for the basis RCPSP and subsequently illustrate how effective and efficient branching rules and several of the strong dominance and bounding arguments can be extended to a rich and realistic variety of related problems. The preemptive resource-constrained project scheduling problem (PRCPSP) relaxes the nonpreemption condition of the RCPSP, thus allowing activities to be interrupted at integer points in time and resumed later without additional penalty cost. The generalized resource-constrained project scheduling (GRCPSP) extends the RCPSP to the case of precedence diagramming type of precedence constraints (minimal finish-start, start-start, start-finish, finish-finish precedence relations), activity ready times, deadlines and variable resource availability's. The resource-constrained project scheduling problem with generalized precedence relations (RCPSP-GPR) allows for start-start, finish-start and finish-finish constraints with minimal and maximal time lags. The MAX-NPV problem aims at scheduling project activities in order to maximize the net present value of the project in the absence of resource constraints. The resource-constrained project scheduling problem with discounted cash flows (RCPSP-DC) aims at the same non-regular objective in the presence of resource constraints. The resource availability cost problem (RACP) aims at determining the cheapest resource availability amounts for which a feasible solution exists that does not violate the project deadline. In the discrete time/cost trade-off problem (DTCTP) the duration of an activity is a discrete, non-increasing function of the amount of a single nonrenewable resource committed to it. In the discrete time/resource trade-off problem (DTRTP) the duration of an activity is a discrete, non-increasing function of the amount of a single renewable resource. Each activity must then be scheduled in one of its possible execution modes. In addition to time/resource trade-offs, the multi-mode project scheduling problem (MRCPSP) allows for resource/resource trade-offs and constraints on renewable, nonrenewable and doubly-constrained resources. We report on recent computational results and end with overall conclusions and suggestions for future research.Scheduling; Optimal;

    Time-constrained project scheduling

    Get PDF
    We study the Time-Constrained Project Scheduling Problem (TCPSP), in which the scheduling of activities is subject to strict deadlines. To be able to meet these deadlines, it is possible to work in overtime or hire additional capacity in regular time or overtime. For this problem, we develop a two stage heuristic. The key of our approach lies in the first stage in which we construct partial schedules with a randomized sampling technique. In these partial schedules, jobs may be scheduled for a shorter duration than required. The second stage uses an ILP formulation of the problem to turn a partial schedule into a feasible schedule, and to perform a neighbourhood search. The developed heuristic is quite flexible and, therefore, suitable for practice. We present experimental results on modified RCPSP benchmark instances. The two stage heuristic solves many instances to optimality, and if we substantially decrease the deadline, the rise in cost is only small

    Solving the Resource Constrained Project Scheduling Problem with Generalized Precedences by Lazy Clause Generation

    Full text link
    The technical report presents a generic exact solution approach for minimizing the project duration of the resource-constrained project scheduling problem with generalized precedences (Rcpsp/max). The approach uses lazy clause generation, i.e., a hybrid of finite domain and Boolean satisfiability solving, in order to apply nogood learning and conflict-driven search on the solution generation. Our experiments show the benefit of lazy clause generation for finding an optimal solutions and proving its optimality in comparison to other state-of-the-art exact and non-exact methods. The method is highly robust: it matched or bettered the best known results on all of the 2340 instances we examined except 3, according to the currently available data on the PSPLib. Of the 631 open instances in this set it closed 573 and improved the bounds of 51 of the remaining 58 instances.Comment: 37 pages, 3 figures, 16 table

    A Decision Support System for Ship Maintenance Capacity Planning

    Get PDF
    In this paper, the basic framework and algorithms of a decision support system are discussed, which enhance process and capacity planning at a large repair shop. The research is strongly motivated by experiences in a project carried out at a dockyard, which performs repair, overhaul and modification programs for various classes of navy ships. We outline the basic requirements placed upon order acceptance, process planning and capacity scheduling for large maintenance projects. In subsequent sections a number of procedures and algorithms to deal with these requirements, in particular a procedure for workload-based capacity planning, a database system to support process planning are developed, as well as a resource-constrained project scheduling system to support work planning at a more detailed level. The system has been designed to support decision making at the Navy Dockyard in particular, however, we believe that, due to its generic structure, it is applicable to a wide range of project-based manufacturing and maintenance environments

    A new approach to minimize the makespan of various resource-constrained project scheduling problems

    Get PDF
    Conferência realizada de 30 de março a 2 de abril de 2014This abstract presents a new solution approach to solve the resource-constrained project scheduling problem in the presence of multiple modes with mode identity constraints and two types of logical constraints. Apart from the traditional AND constraints with minimal time-lags, these precedences are extended to OR constraints. These logical constraints extend the set of relations between pairs of activities and make the RCPSP definition somewhat different from the traditional RCPSP research topics in literature. It is known that the RCPSP with AND constraints, and hence its extension to OR constraints, is NP-hard

    A hybrid scatter search. Electromagnetism meta-heuristic for project scheduling.

    Get PDF
    In the last few decades, several effective algorithms for solving the resource-constrained project scheduling problem have been proposed. However, the challenging nature of this problem, summarised in its strongly NP-hard status, restricts the effectiveness of exact optimisation to relatively small instances. In this paper, we present a new meta-heuristic for this problem, able to provide near-optimal heuristic solutions. The procedure combines elements from scatter search, a generic population-based evolutionary search method, and a recently introduced heuristic method for the optimisation of unconstrained continuous functions based on an analogy with electromagnetism theory, hereafter referred to as the electromagnetism meta-heuristic. We present computational experiments on standard benchmark datasets, compare the results with current state-ofthe-art heuristics, and show that the procedure is capable of producing consistently good results for challenging instances of the resource-constrained project scheduling problem. We also demonstrate that the algorithm outperforms state-of-the-art existing heuristics.Algorithms; Effectiveness; Electromagnetism; Functions; Heuristic; Project scheduling; Scatter; Scatter search; Scheduling; Theory;