2,919 research outputs found

    Enhancing Energy Production with Exascale HPC Methods

    Get PDF
    High Performance Computing (HPC) resources have become the key actor for achieving more ambitious challenges in many disciplines. In this step beyond, an explosion on the available parallelism and the use of special purpose processors are crucial. With such a goal, the HPC4E project applies new exascale HPC techniques to energy industry simulations, customizing them if necessary, and going beyond the state-of-the-art in the required HPC exascale simulations for different energy sources. In this paper, a general overview of these methods is presented as well as some specific preliminary results.The research leading to these results has received funding from the European Union's Horizon 2020 Programme (2014-2020) under the HPC4E Project (www.hpc4e.eu), grant agreement n° 689772, the Spanish Ministry of Economy and Competitiveness under the CODEC2 project (TIN2015-63562-R), and from the Brazilian Ministry of Science, Technology and Innovation through Rede Nacional de Pesquisa (RNP). Computer time on Endeavour cluster is provided by the Intel Corporation, which enabled us to obtain the presented experimental results in uncertainty quantification in seismic imagingPostprint (author's final draft

    Towards the Exploration of Task and Workflow Scheduling Methods and Mechanisms in Cloud Computing Environment

    Get PDF
    Cloud computing sets a domain and application-specific distributed environment to distribute the services and resources among users. There are numerous heterogeneous VMs available in the environment to handle user requests. The user requests are defined with a specific deadline. The scheduling methods are defined to set up the order of request execution in the cloud environment. The scheduling methods in a cloud environment are divided into two main categories called Task and Workflow Scheduling. This paper, is a study of work performed on task and workflow scheduling. Various feature processing, constraints-restricted, and priority-driven methods are discussed in this research. The paper also discussed various optimization methods to improve scheduling performance and reliability in the cloud environment. Various constraints and performance parameters are discussed in this research

    Applying future Exascale HPC methodologies in the energy sector

    Get PDF
    The appliance of new exascale HPC techniques to energy industry simulations is absolutely needed nowadays. In this sense, the common procedure is to customize these techniques to the specific energy sector they are of interest in order to go beyond the state-of-the-art in the required HPC exascale simulations. With this aim, the HPC4E project is developing new exascale methodologies to three different energy sources that are the present and the future of energy: wind energy production and design, efficient combustion systems for biomass-derived fuels (biogas), and exploration geophysics for hydrocarbon reservoirs. In this work, the general exascale advances proposed as part of HPC4E and its outcome to specific results in different domains are presented.The research leading to these results has received funding from the European Union's Horizon 2020 Programme (2014-2020) under the HPC4E Project (www.hpc4e.eu), grant agreement n° 689772, the Spanish Ministry of Economy and Competitiveness under the CODEC2 project (TIN2015-63562-R), and from the Brazilian Ministry of Science, Technology and Innovation through Rede Nacional de Pesquisa (RNP). Computer time on Endeavour cluster is provided by the Intel Corporation, which enabled us to obtain the presented experimental results in uncertainty quantification in seismic imaging.Postprint (author's final draft

    Synergy of the Developed 6D BIM Framework and Conception of the nD BIM Framework and nD BIM Process Ontology

    Get PDF
    The author developed a unified nD framework and process ontology for Building Information Modeling (BIM). The research includes a framework developed for 6D BIM, nD BIM, and nD ontology that defines the domain and sub-domain constructs for future nD BIM dimensions. The nD ontology defines the relationships of kinds within any new proposed dimensional domain for BIM. The developed nD BIM framework and ontology takes into account the current 2D-5D BIM dimensions. There is a synergy between the 6D and nD framework that allows the nD framework and ontology to be utilized as a unified template for future dimensional development. Future dimensions for BIM are referred as nD dimensions. The Architecture, Engineering, Construction, and Facility Management (AEC/FM) industries are suffering from many problems in the area of interoperability among BIM dimensions. All nD dimensions must be interoperable. The congestion between interoperable dimensions and communication among AEC/FM stakeholders are the main problems to be resolved. The objective of the research is to solve these problems by utilizing one single nD framework and ontology for nD BIMs. The AEC/FM industries can benefit from the developed 6D framework, nD framework and nD process ontology. nD dimensions must have ontological rules that clearly define the new dimension. The AEC/FM needs non-abstract dimensions to succeed in the areas of seamless dimensional integration, interoperability, round tripping of dimensional data, and precise collaboration among stakeholders. Defined dimensions allow future dimensions to be implemented in an integrated workflow. nD ontology demonstrates new dimensional domain K\u27 shall be defined while also explicitly defining its subset-domains {K1, K2
Kn}, and subset domains K shall contain some x information for interoperability among dimensions that are within K\u27. The research contributions are the framework and ontology for nD BIM. The author conducted case studies that validate the nD methodology. The case studies show that the methodology of the input, output, control and mechanism are correct and the theory can be utilized in application for the AEC/FM and is applicable for other industries. Other contributions include the custom web-based BimServer that serves as the central repository for harvesting all control data within nD BIMs and allows all stakeholders to participate on projects in real-time via an embedded virtual environment in the BimServer. The nD BIM methodology consists of one object-oriented parametric product data model as the input and the output. A relational database is the mechanism for the nD BIM process that distributes the dimensional data. The database is the crux of the nD BIM and it allows the interoperability between the nD dimensions and querying of the nD parametric product data

    Machine Learning in Wireless Sensor Networks: Algorithms, Strategies, and Applications

    Get PDF
    Wireless sensor networks monitor dynamic environments that change rapidly over time. This dynamic behavior is either caused by external factors or initiated by the system designers themselves. To adapt to such conditions, sensor networks often adopt machine learning techniques to eliminate the need for unnecessary redesign. Machine learning also inspires many practical solutions that maximize resource utilization and prolong the lifespan of the network. In this paper, we present an extensive literature review over the period 2002-2013 of machine learning methods that were used to address common issues in wireless sensor networks (WSNs). The advantages and disadvantages of each proposed algorithm are evaluated against the corresponding problem. We also provide a comparative guide to aid WSN designers in developing suitable machine learning solutions for their specific application challenges.Comment: Accepted for publication in IEEE Communications Surveys and Tutorial

    Adaptive structured parallelism

    Get PDF
    Algorithmic skeletons abstract commonly-used patterns of parallel computation, communication, and interaction. Parallel programs are expressed by interweaving parameterised skeletons analogously to the way in which structured sequential programs are developed, using well-defined constructs. Skeletons provide top-down design composition and control inheritance throughout the program structure. Based on the algorithmic skeleton concept, structured parallelism provides a high-level parallel programming technique which allows the conceptual description of parallel programs whilst fostering platform independence and algorithm abstraction. By decoupling the algorithm specification from machine-dependent structural considerations, structured parallelism allows programmers to code programs regardless of how the computation and communications will be executed in the system platform.Meanwhile, large non-dedicated multiprocessing systems have long posed a challenge to known distributed systems programming techniques as a result of the inherent heterogeneity and dynamism of their resources. Scant research has been devoted to the use of structural information provided by skeletons in adaptively improving program performance, based on resource utilisation. This thesis presents a methodology to improve skeletal parallel programming in heterogeneous distributed systems by introducing adaptivity through resource awareness. As we hypothesise that a skeletal program should be able to adapt to the dynamic resource conditions over time using its structural forecasting information, we have developed ASPara: Adaptive Structured Parallelism. ASPara is a generic methodology to incorporate structural information at compilation into a parallel program, which will help it to adapt at execution
    • 

    corecore