23,880 research outputs found

    Developing system models to help Great Britain's railways embrace innovative technologies with confidence

    Get PDF
    Railways are under pressure to become more efficient and cut their costs; innovation has a part to play in achieving these goals. The railway is, however, a complex and closely coupled system, making it difficult in the early stages of development, to be clear what the system-wide impact of innovation will be. The research covered in this paper stems from the idea that computer-based models of existing systems can help overcome this problem, by providing a baseline framework against which the impact of innovation can be identified. The paper describes development of a repeatable modelling methodology, which elicits\ud objective system data from Railway Group Standards and integrates it using CORE®, a powerful system modelling tool, to create system models. The ability of such models to help identify impacts is verified, using as an example the introduction of RailBAM (a new technology that acoustically monitors the health of rolling stock axle bearings) into the existing hot axle bearing detection system

    Balancing operating revenues and occupied refurbishment costs 1: problems of defining project success factors and selecting site planning methods

    Get PDF
    In planning the refurbishment of railway stations the spatial needs of the contractor and of the ongoing business stakeholders have to be balanced. A particular concern is the disruptive effect of construction works upon pedestrian movement. RaCMIT (Refurbishment and Customer Movement Integration Tool) was a research project aimed at addressing this problem. The objective of the research was to develop a decision protocol facilitating optimisation of overall project value to the client's business. This paper (the first of two) presents a framework for considering public disruption in occupied refurbishment using two case studies in large railway stations as examples. It briefly describes new tools which (combined with existing techniques) assist decision making in the management of disruption. It links strategic with sitebased decision making and suggests how public disruption may be treated as a variable to be jointly optimised along with traditional criteria such as time, cost and quality. Research observations as well as current literature suggest that for overall decision-making, opportunities may be lost (under current practice) for minimising joint project cost/revenue disruption, and, for spatio-temporal site decision-making, effective and efficient tools now exist to model both sides of the construction site boundary

    A hybrid and integrated approach to evaluate and prevent disasters

    Get PDF

    Drawing the line: balancing the spatial requirements of customer and contractor in occupied refurbishment

    Get PDF
    In planning the refurbishment of railway stations the spatial needs of the contractor and ofthe ongoing business stakeholders have to be balanced. A particular concern is thedisruptive effect of construction works upon pedestrian movement.RaCMIT (Refurbishment and Customer Movement Integration Tool) is a research projectaimed at addressing this problem through combining the knowledge of the client projectmanager, the construction planner and the pedestrian modelling expert.The objective of the research is to develop a decision protocol (based on problemsencountered in two case studies) facilitating optimisation of overall project value to theclient?s business.Research observations as well as current literature suggest that:? for overall decision-making, opportunities may be lost (under current practice) forminimising joint project cost/revenue disruption and? for spatial decision-making, temporary station configuration during construction(and not just overall pedestrian capacity) is a significant variable for both businessand safety outcomes. In planning the refurbishment of railway stations the spatial needs of the contractor and ofthe ongoing business stakeholders have to be balanced. A particular concern is thedisruptive effect of construction works upon pedestrian movement.RaCMIT (Refurbishment and Customer Movement Integration Tool) is a research projectaimed at addressing this problem through combining the knowledge of the client projectmanager, the construction planner and the pedestrian modelling expert.The objective of the research is to develop a decision protocol (based on problemsencountered in two case studies) facilitating optimisation of overall project value to theclient?s business.Research observations as well as current literature suggest that:? for overall decision-making, opportunities may be lost (under current practice) forminimising joint project cost/revenue disruption and? for spatial decision-making, temporary station configuration during construction(and not just overall pedestrian capacity) is a significant variable for both businessand safety outcomes

    Application of Multicriteria Decision-Making Methods in Railway Engineering: A Case Study of Train Control Information Systems (TCIS)

    Get PDF
    In order to improve its position in the transport market railway, as a complex system, it has to fulfill a number of objectives such as increased capacity and asset utilization, improved reliability and safety, higher customer service levels, better energy efficiency and fewer emissions, along with increased economic viability and profits. Some of these objectives call for the implementation of maximum values, while some of them require minimum values. Additionally, some can be expressed quantitatively, while some, for example, customer service, can be described qualitatively through a descriptive scale of points. The application of MCDM in railway engineering can play a significant role. Therefore, the major objective of this chapter is the review of the application of MCDM methods in railway engineering. As one of the means in achieving the objectives of railways and above all the utilization of capacity are Train Control Information Systems (TCIS). Based on that, the aim of this chapter is the evaluation of the efficiency of TCIS in the improvement of railway capacity utilization through defined technical-technological indicators. The non-radial Data Envelopment Analysis (DEA) model for the evaluation of TCIS efficiency in improvement of utilization of railway capacity using the selected indicators is proposed. The proposed non-radial DEA model for TCIS efficiency evaluation in using railway capacity could be applied to an overall network or for separate parts of railway lines

    Multi-technique approach to rockfall monitoring in the Montserrat massif (Catalonia, NE Spain)

    Get PDF
    Montserrat Mountain is located near Barcelona in Catalonia, in the northeast of Spain, and its massif is formed by conglomerate interleaved by siltstone/sandstone with steep slopes very prone to rockfalls. The increasing number of visitors in the monastery area, reaching 2.4 million per year, has highlighted the risk derived from rockfalls for this building area and also for the terrestrial accesses, both roads and the rack railway. A risk mitigation plan has been launched, and its first phase during 2014-2016 has been focused largely on testing several monitoring techniques for their later implementation. The results of the pilot tests, performed as a development from previous sparse experiences and data, are presented together with the first insights obtained. These tests combine four monitoring techniques under different conditions of continuity in space and time domains, which are: displacement monitoring with Ground-based Synthetic Aperture Radar and characterization at slope scale, with an extremely non-uniform atmospheric phase screen due to the stepped topography and atmosphere stratification; Terrestrial Laser Scanner surveys quantifying the frequency of small or even previously unnoticed rockfalls, and monitoring rock block centimetre scale displacements; the monitoring of rock joints implemented through a wireless sensor network with an ad hoc design of ZigBee loggers developed by ICGC; and, finally, monitoring singular rock needles with Total Station.Peer ReviewedPostprint (author's final draft

    Vulnerability assessment modelling for railway networks

    Get PDF
    Railway networks are prone to many different potential disruptive events such as technical failures (e.g. the failure of aging components), natural disasters (e.g. flooding) and intentional man-made disasters (e.g. trespass and suicide). Assessing the vulnerability of railway networks can help infrastructure managers to create the right preventive strategies to improve the robustness and the resilience of railway networks before the occurrence of disruptions. This study proposes a stochastic-vulnerability analysis model that enables the critical components of railway networks to be identified. The model is developed using a discrete event simulation technique. Its framework includes modules for assigning the disruption to the network components, predicting the network vulnerability, in terms of passenger delays and journey cancellations, and calculating the risk-based criticality of network components. Finally, an example application of the model is presented using a part of the East Midland railway network in UK

    A hybrid Delphi-AHP multi-criteria analysis of Moving Block and Virtual Coupling railway signalling

    Get PDF
    The railway industry needs to investigate overall impacts of next generation signalling systems such as Moving Block (MB) and Virtual Coupling (VC) to identify development strategies to face the forecasted railway demand growth. To this aim an innovative multi-criteria analysis (MCA) framework is introduced to analyse and compare VC and MB in terms of relevant criteria including quantitative (e.g. costs, capacity, stability, energy) and qualitative ones (e.g. safety, regulatory approval). We use a hybrid Delphi-Analytic Hierarchic Process (AHP) technique to objectively select, combine and weight the different criteria to more reliable MCA outcomes. The analysis has been performed for different rail market segments including high-speed, mainline, regional, urban and freight corridors. The results show that there is a highly different technological maturity level between MB and VC given the larger number of vital issues not yet solved for VC. The MCA also indicates that VC could outperform MB for all market segments if it reaches a comparable maturity and safety level. The provided analysis can effectively support the railway industry in strategic investment planning of VC
    • …
    corecore