    Mixed-Criticality Scheduling to Minimize Makespan

    Get PDF
    In the mixed-criticality job model, each job is characterized by two execution time parameters, representing a smaller (less conservative) estimate and a larger (more conservative) estimate on its actual, unknown, execution time. Each job is further classified as being either less critical or more critical. The desired execution semantics are that all jobs should execute correctly provided all jobs complete upon being allowed to execute for up to the smaller of their execution time estimates, whereas if some jobs need to execute beyond their smaller execution time estimates (but not beyond their larger execution time estimates), then only the jobs classified as being more critical are required to execute correctly. The scheduling of collections of such mixed-criticality jobs upon identical multiprocessor platforms in order to minimize the makespan is considered here

    The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review

    Get PDF
    Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe

    Unified Concept of Bottleneck

    Get PDF
    The term `bottleneck` has been extensively used in operations management literature. Management paradigms like the Theory of Constraints focus on the identification and exploitation of bottlenecks. Yet, we show that the term has not been rigorously defined. We provide a classification of bottleneck definitions available in literature and discuss several myths associated with the concept of bottleneck. The apparent diversity of definitions raises the question whether it is possible to have a single bottleneck definition which has as much applicability in high variety job shops as in mass production environments. The key to the formulation of an unified concept of bottleneck lies in relating the concept of bottleneck to the concept of shadow price of resources. We propose an universally applicable bottleneck definition based on the concept of average shadow price. We discuss the procedure for determination of bottleneck values for diverse production environments. The Law of Diminishing Returns is shown to be a sufficient but not necessary condition for the equivalence of the average and the marginal shadow price. The equivalence of these two prices is proved for several environments. Bottleneck identification is the first step in resource acquisition decisions faced by managers. The definition of bottleneck presented in the paper has the potential to not only reduce ambiguity regarding the meaning of the term but also open a new window to the formulation and analysis of a rich set of problems faced by managers.

    A Measurement-Based Model for Parallel Real-Time Tasks

    Get PDF
    Under the federated paradigm of multiprocessor scheduling, a set of processors is reserved for the exclusive use of each real-time task. If tasks are characterized very conservatively (as is typical in safety-critical systems), it is likely that most invocations of the task will have computational demand far below the worst-case characterization, and could have been scheduled correctly upon far fewer processors than were assigned to it assuming the worst-case characterization of its run-time behavior. Provided we could safely determine during run-time when all the processors are going to be needed, for the rest of the time the unneeded processors could be idled in low-energy "sleep" mode, or used for executing non-real time work in the background. In this paper we propose a model for representing parallelizable real-time tasks in a manner that permits us to do so. Our model does not require us to have fine-grained knowledge of the internal structure of the code represented by the task; rather, it characterizes each task by a few parameters that are obtained by repeatedly executing the code under different conditions and measuring the run-times

    Timeslack-based techniques for generating robust projectschedules subject to resource uncertainty.

    Get PDF
    The classical, deterministic resource-constrained project scheduling problem has been the subject of a great deal of research during the previous decades. This is not surprising given the high practical relevance of this scheduling problem. Nevertheless, extensions are needed to be better able to cope with situations arising in practice such as multiple activity execution modes, activity duration changes and resource breakdowns. In this paper we analytically determine the impact of unexpected resource breakdowns on activity durations. Furthermore, using this information we develop an approach for inserting explicit idle time into the project schedule in order to protect it as well as possible from disruptions caused by resource unavailabilities. This strategy will be compared to a traditional simulation-based procedure and to a heuristic developed for the case of stochastic activity durations.Uncertainty; Project scheduling; Scheduling; Research; Impact; Information; Time; Order; IT; Strategy; Heuristic;

    A hybrid shifting bottleneck-tabu search heuristic for the job shop total weighted tardiness problem

    Get PDF
    In this paper, we study the job shop scheduling problem with the objective of minimizing the total weighted tardiness. We propose a hybrid shifting bottleneck - tabu search (SB-TS) algorithm by replacing the reoptimization step in the shifting bottleneck (SB) algorithm by a tabu search (TS). In terms of the shifting bottleneck heuristic, the proposed tabu search optimizes the total weighted tardiness for partial schedules in which some machines are currently assumed to have infinite capacity. In the context of tabu search, the shifting bottleneck heuristic features a long-term memory which helps to diversify the local search. We exploit this synergy to develop a state-of-the-art algorithm for the job shop total weighted tardiness problem (JS-TWT). The computational effectiveness of the algorithm is demonstrated on standard benchmark instances from the literature

    Precise Scheduling of DAG Tasks with Dynamic Power Management

    Get PDF

    Proactive resource allocation heuristics for robust project scheduling.

    Get PDF
    The well-known deterministic resource-constrained project scheduling problem (RCPSP) involves the determination of a predictive schedule (baseline schedule or pre-schedule) of the project activities that satisfies the finish-start precedence relations and the renewable resource constraints under the objective of minimizing the project duration. This pre-schedule serves as a baseline for the execution of the project. During execution, however, the project can be subject to several types of disruptions that may disturb the baseline schedule. Management must then rely on a reactive scheduling procedure for revising or reoptimizing the pre-schedule. The objective of our research is to develop procedures for allocating resources to the activities of a given baseline schedule in order to maximize its stability. We propose two integer programming based heuristics and report on computational results obtained on a set of benchmark problems.

    Strategy Switching: Smart Fault-Tolerance for Weakly-Hard Resource-Constrained Real-Time Applications

    Get PDF
    The probability of data corruption as a result of single event upsets (SEUs) increases as transistor sizes decrease. Software-based fault-tolerance can help offer protection against SEUs on Commercial off The Shelf (COTS) hardware. However, such fault tolerance relies on replication, for which there may be insufficient resources in resource-constrained environments. Systems in the weakly-hard real-time domain can tolerate some faults as a product of their domain. Combining both the need for fault-tolerance and the intrinsic ability to tolerate faults, we propose a new approach for applying fault-tolerance named strategy switching. Strategy switching minimizes the effective unmitigated fault-rate by switching which tasks are to be run under a fault-tolerance scheme at runtime. Our method does not require bounding the number of faults for a given number of consecutive iterations.We show how our method improves the steady-state fault rate by analytically computing the rate for our test set of generated DAGs and comparing this against a static application of fault-tolerance. Finally, we validate our method using UPPAAL.</p