    A Flowshop Scheduling Problem With Transportation Times and Capacity Constraints

    Get PDF
    Although there are numerous methodologies and research studies on machine scheduling, most of the literature assumes that there is an unlimited number of transporters to deliver jobs from one machine to another for further processing and that transportation times can be neglected. These two assumptions are not applicable if one intends to generate an accurate schedule for the shop floor. In this research, a flowshop scheduling problem with two machines, denoted as M1 and M2, and a single transporter with capacity c is considered. The main focus is on the development of a dynamic programming algorithm to generate a schedule that minimizes the makespan. The transporter takes t1 time units to travel with at least one job from machine M1 to machine M2, and t2 time units to return empty to machine M1. When the processing times for all n jobs on machine M1 are constant, denoted as pj1≡p1, and the capacity of the transporter c is at least ()12121−⎥⎥⎤⎢⎢⎡+ptt, the computational complexity of the proposed algorithm is shown to be

    Makespan minimization for flow-shop problems with transportation times and a single robot

    Get PDF
    In a flow-shop problem with transportation times and a single robot n jobs consisting of m operations have to be processed in the same order on m machines. Additionally, transportation times are considered if a job changes from one machine to another. We assume that unlimited buffer space exists between the machines and all transportations have to be done by a single robot. The objective is to determine a feasible schedule with minimal makespan. New complexity results are derived for special cases where the processing or transportation times are constant values. Some of these may also be interpreted as new results for special cases of the classical 3-machine flow-shop F3||Cmax with constant processing times at certain stages

    Minimizing the sum of flow times with batching and delivery in a supply chain

    Get PDF
    This thesis was submitted for the degree of Doctor of Philosophy and awarded by Brunel University.The aim of this thesis is to study one of the classical scheduling objectives that is of minimizing the sum of flow times, in the context of a supply chain network. We consider the situation that a supplier schedules a set of jobs for delivery in batches to several manufacturers, who in tum have to schedule and deliver jobs in batches to several customers. The individual problem from the viewpoint of supplier and manufacturers will be considered separately. The decision problem faced by the supplier is that of minimizing the sum of flow time and delivery cost of a set of jobs to be processed on a single machine for delivery in batches to manufacturers. The problem from the viewpoint of manufacturer is similar to the supplier's problem and the only difference is that the scheduling, batching and delivery decisions made by the supplier define a release date for each job, before which the manufacturer cannot start the processing of that job. Also a combined problem in the light of cooperation between the supplier and manufacturer will be considered. The objective of the combined problem is to find the best scheduling, batching, and delivery decisions that benefit the entire system including the supplier and manufacturer. Structural properties of each problem are investigated and used to devise a branch and bound solution scheme. Computational experience shows significant improvements over existing algorithms and also shows that cooperation between a supplier and a manufacturer reduces the total system cost of up to 12.35%, while theoretically the reduction of up to 20% can be achieved for special cases

    Minimizing the sum of flow times with batching and delivery in a supply chain

    Get PDF
    The aim of this thesis is to study one of the classical scheduling objectives that is of minimizing the sum of flow times, in the context of a supply chain network. We consider the situation that a supplier schedules a set of jobs for delivery in batches to several manufacturers, who in tum have to schedule and deliver jobs in batches to several customers. The individual problem from the viewpoint of supplier and manufacturers will be considered separately. The decision problem faced by the supplier is that of minimizing the sum of flow time and delivery cost of a set of jobs to be processed on a single machine for delivery in batches to manufacturers. The problem from the viewpoint of manufacturer is similar to the supplier's problem and the only difference is that the scheduling, batching and delivery decisions made by the supplier define a release date for each job, before which the manufacturer cannot start the processing of that job. Also a combined problem in the light of cooperation between the supplier and manufacturer will be considered. The objective of the combined problem is to find the best scheduling, batching, and delivery decisions that benefit the entire system including the supplier and manufacturer. Structural properties of each problem are investigated and used to devise a branch and bound solution scheme. Computational experience shows significant improvements over existing algorithms and also shows that cooperation between a supplier and a manufacturer reduces the total system cost of up to 12.35%, while theoretically the reduction of up to 20% can be achieved for special cases.EThOS - Electronic Theses Online ServiceGBUnited Kingdo