A Novel Approach to the Common Due-Date Problem on Single and Parallel Machines
This paper presents a novel idea for the general case of the Common Due-Date
(CDD) scheduling problem. The problem is about scheduling a certain number of
jobs on a single or parallel machines where all the jobs possess different
processing times but a common due-date. The objective of the problem is to
minimize the total penalty incurred due to earliness or tardiness of the job
completions. This work presents exact polynomial algorithms for optimizing a
given job sequence for single and identical parallel machines with the run-time
complexities of for both cases, where is the number of jobs.
Besides, we show that our approach for the parallel machine case is also
suitable for non-identical parallel machines. We prove the optimality for the
single machine case and the runtime complexities of both. Henceforth, we extend
our approach to one particular dynamic case of the CDD and conclude the chapter
with our results for the benchmark instances provided in the OR-library.Comment: Book Chapter 22 page
Single-machine scheduling with stepwise tardiness costs and release times
We study a scheduling problem that belongs to the yard operations component of the railroad planning problems, namely the hump sequencing problem. The scheduling problem is characterized as a single-machine problem with stepwise tardiness cost objectives. This is a new scheduling criterion which is also relevant in the context of traditional machine scheduling problems. We produce complexity results that characterize some cases of the problem as pseudo-polynomially solvable. For the difficult-to-solve cases of the problem, we develop mathematical programming formulations, and propose heuristic algorithms. We test the formulations and heuristic algorithms on randomly generated single-machine scheduling problems and real-life datasets for the hump sequencing problem. Our experiments show promising results for both sets of problems
Competitive-Ratio Approximation Schemes for Minimizing the Makespan in the Online-List Model
We consider online scheduling on multiple machines for jobs arriving
one-by-one with the objective of minimizing the makespan. For any number of
identical parallel or uniformly related machines, we provide a
competitive-ratio approximation scheme that computes an online algorithm whose
competitive ratio is arbitrarily close to the best possible competitive ratio.
We also determine this value up to any desired accuracy. This is the first
application of competitive-ratio approximation schemes in the online-list
model. The result proves the applicability of the concept in different online
models. We expect that it fosters further research on other online problems
An algorithm for a bi-objective parallel machine problem with eligibility, release dates and delivery times of the jobs
The scheduling of parallel machines is a well-known problem in many companies. Nevertheless, not always all the jobs can be manufactured in any machine and the eligibility appears. Based on a real-life problem, we present a model which has three different machines, called as high, medium and low level respectively. The set of jobs to be scheduled on these three parallel machines are also distributed among these three levels: one job from a level can be manufactured in a machine of the same or higher level. But a penalty appears when a job is manufactured in a machine different from the higher level. Besides, there are release dates and delivery times associated to each job. The tackled problem is bi-objective with the criteria: minimization of the final date-i.e. the maximum for all the jobs of their completion time plus the delivery time-and the minimization of the total penalty generated by the jobs. In a first step we revisited possible heuristics to minimize the final date on a single machine. In a second step a heuristic is proposed to approximate the set of efficient solutions and the Pareto front of the bi-objective problem. All the algorithms are experimented on various instances.Peer ReviewedPostprint (published version
Multiprocessor task scheduling in multistage hyrid flowshops: a genetic algorithm approach
This paper considers multiprocessor task scheduling in a multistage hybrid flow-shop environment. The objective is to minimize the make-span, that is, the completion time of all the tasks in the last stage. This problem is of practical interest in the textile and process industries. A genetic algorithm (GA) is developed to solve the problem. The GA is tested against a lower bound from the literature as well as against heuristic rules on a test bed comprising 400 problems with up to 100 jobs, 10 stages, and with up to five processors on each stage. For small problems, solutions found by the GA are compared to optimal solutions, which are obtained by total enumeration. For larger problems, optimum solutions are estimated by a statistical prediction technique. Computational results show that the GA is both effective and efficient for the current problem. Test problems are provided in a web site at www.benchmark.ibu.edu.tr/mpt-h; fsp
- …