    BIM-based Generative Modular Housing Design and Implications for Post-Disaster Housing Recovery

    Get PDF
    The adverse social and financial impacts of catastrophic disasters are increasing as population centers grow. After disastrous events, the government agencies must respond to post-disaster housing issues quickly and efficiently and provide sufficient resources for the reconstruction of destroyed and damaged houses for full rehabilitation. However, post-disaster housing reconstruction is a highly complex process because of the large number of projects, shortage of resources, and heavy pressure for delivery of the projects after a disastrous event. This complexity and lack of an inconsistent, systematic approach for planning lead to an ad-hoc decision-making process and inefficient recovery. This research explored modular construction as a highly time-efficient approach to tackle the abovementioned challenges and facilitate the housing reconstruction process. Firstly, this research investigated the feasibility of using the modular construction method for rapid post-disaster housing reconstruction through a targeted literature review and survey of subject matter experts to broaden the understanding of modular construction-based post-disaster housing reconstruction, benefits, and barriers. Second, this research focused on improving the design and pre-planning phase of modular construction that can facilitate the successful implementation of modular construction in a post-disaster situation. To this end, a BIM-based generative modular housing design system was developed by using Generative Adversarial Networks (GANs) to automate the entire design process by incorporating manufacturing and construction constraints to fit the needs of the modular construction method. The framework was further extended by developing an optimization model to optimize the modularization strategy in the early design phase which was capable of reflecting the entire multi-stage process of modular construction (production, transportation, and assembly), and considering both individual project’s requirements and post-disaster housing reconstruction portfolio’s requirements. The outcomes of this study fit the MC industry that may be used by designers and modular housing companies looking to automate their design process. It is also expected to provide critical benchmarks for planners, decision-makers, and community developers to facilitate their decision-making process on considering modular construction as an efficient way for mass post-disaster housing reconstruction and addressing communities’ housing needs following a disastrous event

    Generative design in building information modelling (BIM) : approaches and requirements

    Get PDF
    The integration of generative design (GD) and building information modelling (BIM), as a new technology consolidation, can facilitate the constructability of GD’s automatic design solutions, while improving BIM’s capability in the early design phase. Thus, there has been an increasing interest to study GD-BIM, with current focuses mainly on exploring applications and investigating tools. However, there are a lack of studies regarding methodological relationships and skill requirement based on different development objectives or GD properties; thus, the threshold of developing GD-BIM still seems high. This study conducts a critical review of current approaches for developing GD in BIM, and analyses methodological relationships, skill requirements, and improvement of GD-BIM development. Accordingly, novel perspectives of objective-oriented, GD component-based, and skill-driven GD-BIM development as well as reference guides are proposed. Finally, future research directions, challenges, and potential solutions are discussed. This research aims to guide designers in the building industry to properly determine approaches for developing GD-BIM and inspire researchers’ future studies

    CREATING SUSTAINABLE CONSTRUCTION: BUILDING INFORMATICS MODELLING AND LEAN CONSTRUCTION APPROACH

    Get PDF
    Sustainability concept has been a driving force in construction process because it has become a priority in the industry. This research explores a means to the desired good results by introducing the integration of Lean construction and Building information modeling in the construction industry. It was observed that most companies implemented the use of BIM tools in their design process but yet do not realize that a greater level of efficiency can be attained by the integration of the duo. This research sought to find answers to the areas of construction that Lean and BIM can be applied. Their workability, barriers to their implementation and the success factors for their effective implementation. Random sampling technique was used in sample sizing, 150 samples of questionnaire was used in data collation and processed with SPSS software. It was discovered among the number of construction companies surveyed that there is major focus on various challenges of delay and ineffective works during the course of their construction process. As a result of the research, a model was created to aid the easy implementation of lean construction using a BIM tool without playing blind to the truth that lean construction requires a conscious change of way of thinking and order of operations within a company

    Open BIM Standards: A Review of the Processes for Managing Existing Structures in the Pre- and Post-Earthquake Phases

    Get PDF
    The problem of managing existing structures before and after seismic events has led to the development of many di erent strategies across the lobe. These aim to mitigate the catastrophic e ects of earthquakes on the occupants of a building, as well as improve the management of the emergency that inevitably ensues. This paper explores the use of an openBIM approach to resolve the issues referred to above, which is possible because of two new standards: Industry Foundation Classes and Information Delivery Manuals. A review of the most popular strategies adopted in both the pre- and post-earthquake phases is conducted using a process map. This organizes the relevant steps and processes into tasks, and additionally identifies the points at which information is produced and exchanged and the party responsible for doing so. Also described is how BIM models can be utilized in essential pre- and post-earthquake activities, as well as current benefits and ongoing developments intended to improve the processes themselves

    Development and validation of natural user interfaces for semantic enrichment of BIM models using open formats

    Get PDF
    Purpose: Despite the technological paradigm shift presented to the architecture, engineering, construction and operations sector (AECO), the full-fledged acceptance of the building information modelling (BIM) methodology has been slower than initially anticipated. Indeed, this study aims to acknowledge the need for increasing supportive technologies enabling the use of BIM, attending to available human resources, their requirements and their tasks. Design/methodology/approach: A complete case study is described, including the development process centred on design science research methodology followed by the usability assessment procedure validated by construction projects facility management operational staff. Findings: Results show that participants could interact with BIM using openBIM processes and file formats naturally, as most participants reached an efficiency level close to that expected for users already familiar with the interface (i.e. high-efficiency values). These results are consistent with the reported perceived satisfaction and analysis of participants’ discourses through 62 semi-structured interviews. Originality/value: The contributions of the present study are twofold: a proposal for a virtual reality openBIM framework is presented, particularly for the semantic enrichment of BIM models, and a methodology for evaluating the usability of this type of system in the AECO sector.info:eu-repo/semantics/publishedVersio

    BIM Enabled Sustainable Facility Management

    Get PDF
    The scope of facility management spans from traditional activities like repair & maintenance, health & safety, through to real estate management, financial management, change management, and even contract management, tender and procurement, construction, and demolition and disposal of the constructed facility. It therefore requires considering sustainability aspects of construction, which are better addressed through sustainable design strategies. A consolidated but holistic framework has been conceptualized to ensure sustainability in facility management, especially to practice in building and AEC (architecture, engineering and construction) sectors. Although testing and validation is needed, the conceptualized framework is expected to achieve sustainability in the relevant sectors

    A Computational Procedure for Generating Specimens of BIM and Point Cloud Data for Building Change Detection

    Get PDF
    The potential for automated construction quality inspection, construction progress tracking and post-earthquake damage assessment drives research in interpretation of remote sensing data and compilation of semantic models of buildings in different states. However, research efforts are often hampered by a lack of full-scale datasets. This is particularly the case for earthquake damage assessment research, where acquisition of scans is restricted by scarcity of access to post-earthquake sites. To solve this problem, we have developed a procedure for compiling digital specimens in both pre- and post-event states and for generating synthetic data equivalent to which would result from laser scanning in the field. The procedure is validated by comparing the physical and synthetic scans of a damaged beam. Interpretation of the beam damage from the synthetic data demonstrates the feasibility of using this procedure to replace physical specimens with digital models for experimentation and for other civil engineering applications

    Performance assessment of urban precinct design: a scoping study

    Get PDF
    Executive Summary: Significant advances have been made over the past decade in the development of scientifically and industry accepted tools for the performance assessment of buildings in terms of energy, carbon, water, indoor environment quality etc. For resilient, sustainable low carbon urban development to be realised in the 21st century, however, will require several radical transitions in design performance beyond the scale of individual buildings. One of these involves the creation and application of leading edge tools (not widely available to built environment professions and practitioners) capable of being applied to an assessment of performance across all stages of development at a precinct scale (neighbourhood, community and district) in either greenfield, brownfield or greyfield settings. A core aspect here is the development of a new way of modelling precincts, referred to as Precinct Information Modelling (PIM) that provides for transparent sharing and linking of precinct object information across the development life cycle together with consistent, accurate and reliable access to reference data, including that associated with the urban context of the precinct. Neighbourhoods are the ‘building blocks’ of our cities and represent the scale at which urban design needs to make its contribution to city performance: as productive, liveable, environmentally sustainable and socially inclusive places (COAG 2009). Neighbourhood design constitutes a major area for innovation as part of an urban design protocol established by the federal government (Department of Infrastructure and Transport 2011, see Figure 1). The ability to efficiently and effectively assess urban design performance at a neighbourhood level is in its infancy. This study was undertaken by Swinburne University of Technology, University of New South Wales, CSIRO and buildingSMART Australasia on behalf of the CRC for Low Carbon Living
    • 