6,322 research outputs found

    Framework for sustainable TVET-Teacher Education Program in Malaysia Public Universities

    Get PDF
    Studies had stated that less attention was given to the education aspect, such as teaching and learning in planning for improving the TVET system. Due to the 21st Century context, the current paradigm of teaching for the TVET educators also has been reported to be fatal and need to be shifted. All these disadvantages reported hindering the country from achieving the 5th strategy in the Strategic Plan for Vocational Education Transformation to transform TVET system as a whole. Therefore, this study aims to develop a framework for sustainable TVET Teacher Education program in Malaysia. This study had adopted an Exploratory Sequential Mix-Method design, which involves a semi-structured interview (phase one) and survey method (phase two). Nine experts had involved in phase one chosen by using Purposive Sampling Technique. As in phase two, 118 TVET-TE program lecturers were selected as the survey sample chosen through random sampling method. After data analysis in phase one (thematic analysis) and phase two (Principal Component Analysis), eight domains and 22 elements have been identified for the framework for sustainable TVET-TE program in Malaysia. This framework was identified to embed the elements of 21st Century Education, thus filling the gap in this research. The research findings also indicate that the developed framework was unidimensional and valid for the development and research regarding TVET-TE program in Malaysia. Lastly, it is in the hope that this research can be a guide for the nations in producing a quality TVET teacher in the future

    Dynamic scheduling in a multi-product manufacturing system

    Get PDF
    To remain competitive in global marketplace, manufacturing companies need to improve their operational practices. One of the methods to increase competitiveness in manufacturing is by implementing proper scheduling system. This is important to enable job orders to be completed on time, minimize waiting time and maximize utilization of equipment and machineries. The dynamics of real manufacturing system are very complex in nature. Schedules developed based on deterministic algorithms are unable to effectively deal with uncertainties in demand and capacity. Significant differences can be found between planned schedules and actual schedule implementation. This study attempted to develop a scheduling system that is able to react quickly and reliably for accommodating changes in product demand and manufacturing capacity. A case study, 6 by 6 job shop scheduling problem was adapted with uncertainty elements added to the data sets. A simulation model was designed and implemented using ARENA simulation package to generate various job shop scheduling scenarios. Their performances were evaluated using scheduling rules, namely, first-in-first-out (FIFO), earliest due date (EDD), and shortest processing time (SPT). An artificial neural network (ANN) model was developed and trained using various scheduling scenarios generated by ARENA simulation. The experimental results suggest that the ANN scheduling model can provided moderately reliable prediction results for limited scenarios when predicting the number completed jobs, maximum flowtime, average machine utilization, and average length of queue. This study has provided better understanding on the effects of changes in demand and capacity on the job shop schedules. Areas for further study includes: (i) Fine tune the proposed ANN scheduling model (ii) Consider more variety of job shop environment (iii) Incorporate an expert system for interpretation of results. The theoretical framework proposed in this study can be used as a basis for further investigation

    Design and operational control of an AGV system

    Get PDF
    In this paper we first deal with the design and operational control of Automated Guided Vehicle (AGV) systems, starting from the literature on these topics. Three main issues emerge: track layout, the number of AGVs required and operational transportation control. An hierarchical queueing network approach to determine the number of AGVs is decribed. Also basic concepts are presented for the transportation control of both a job-shop and a flow-shop. Next we report on the results of a case study, in which track layout and transportation control are the main issues. Finally we suggest some topics for further research

    Communication and control in small batch part manufacturing

    Get PDF
    This paper reports on the development of a real-time control network as an integrated part of a shop floor control system for small batch part manufacturing. The shop floor control system is called the production control system (PCS). The PCS aims at an improved control of small batch part manufacturing systems, enabling both a more flexible use of resources and a decrease in the economical batch size. For this, the PCS integrates various control functions such as scheduling, dispatching, workstation control and monitoring, whilst being connected on-line to the production equipment on the shop floor. The PCS can be applied irrespective of the level of automation on the shop floor. The control network is an essential part of the PCS, as it provides a real-time connection between the different modules (computers) of the PCS, which are geographically distributed over the shop floor. An overview of the requirements of such a control network is given. The description of the design includes the services developed, the protocols used and the physical layout of the network. A prototype of the PCS, including the control network, has been installed and tested in a pilot plant. The control network has proven that it can supply a manufacturing environment, consisting of equipment from different vendors with different levels of automation, with a reliable, low cost, real-time communication facility

    Solution and quality robust project scheduling: a methodological framework.

    Get PDF
    The vast majority of the research efforts in project scheduling over the past several years has concentrated on the development of exact and suboptimal procedures for the generation of a baseline schedule assuming complete information and a deterministic environment. During execution, however, projects may be the subject of considerable uncertainty, which may lead to numerous schedule disruptions. Predictive-reactive scheduling refers to the process where a baseline schedule is developed prior to the start of the project and updated if necessary during project execution. It is the objective of this paper to review possible procedures for the generation of proactive (robust) schedules, which are as well as possible protected against schedule disruptions, and for the deployment of reactive scheduling procedures that may be used to revise or re-optimize the baseline schedule when unexpected events occur. We also offer a methodological framework that should allow project management to identify the proper scheduling methodology for different project scheduling environments. Finally, we survey the basics of Critical Chain scheduling and indicate in which environments it is useful.Framework; Information; Management; Processes; Project management; Project scheduling; Project scheduling under uncertainty; Stability; Robust scheduling; Quality; Scheduling; Stability; Uncertainty;

    High-Level Object Oriented Genetic Programming in Logistic Warehouse Optimization

    Get PDF
    Disertační práce je zaměřena na optimalizaci průběhu pracovních operací v logistických skladech a distribučních centrech. Hlavním cílem je optimalizovat procesy plánování, rozvrhování a odbavování. Jelikož jde o problém patřící do třídy složitosti NP-težký, je výpočetně velmi náročné nalézt optimální řešení. Motivací pro řešení této práce je vyplnění pomyslné mezery mezi metodami zkoumanými na vědecké a akademické půdě a metodami používanými v produkčních komerčních prostředích. Jádro optimalizačního algoritmu je založeno na základě genetického programování řízeného bezkontextovou gramatikou. Hlavním přínosem této práce je a) navrhnout nový optimalizační algoritmus, který respektuje následující optimalizační podmínky: celkový čas zpracování, využití zdrojů, a zahlcení skladových uliček, které může nastat během zpracování úkolů, b) analyzovat historická data z provozu skladu a vyvinout sadu testovacích příkladů, které mohou sloužit jako referenční výsledky pro další výzkum, a dále c) pokusit se předčit stanovené referenční výsledky dosažené kvalifikovaným a trénovaným operačním manažerem jednoho z největších skladů ve střední Evropě.This work is focused on the work-flow optimization in logistic warehouses and distribution centers. The main aim is to optimize process planning, scheduling, and dispatching. The problem is quite accented in recent years. The problem is of NP hard class of problems and where is very computationally demanding to find an optimal solution. The main motivation for solving this problem is to fill the gap between the new optimization methods developed by researchers in academic world and the methods used in business world. The core of the optimization algorithm is built on the genetic programming driven by the context-free grammar. The main contribution of the thesis is a) to propose a new optimization algorithm which respects the makespan, the utilization, and the congestions of aisles which may occur, b) to analyze historical operational data from warehouse and to develop the set of benchmarks which could serve as the reference baseline results for further research, and c) to try outperform the baseline results set by the skilled and trained operational manager of the one of the biggest warehouses in the middle Europe.

    Real-Time Scheduling Approaches for Vehicle-Based Internal Transport Systems

    Get PDF
    In this paper, we study the problem of scheduling and dispatching vehicles in vehicle-based internal transport systems within warehouses and production facilities. We develop and use two rolling horizon policies to solve real-time vehicle scheduling problems. To solve static instances of scheduling problems, we propose two new heuristics: combined and column-generation heuristics. We solve a real-time scheduling problem by applying a heuristic to dynamically solve a series of static instances under a rolling horizon policy. A rolling horizon can be seen either as a fixed-time interval in which advance information about loads’ arrivals is available, or as a fixed number of loads which are known to become available in the near future. We also propose a new look-ahead dynamic assignment algorithm, a different dynamic vehicle-scheduling approach. We evaluate these dynamic scheduling strategies by comparing their performance with that of two of the best online vehicle dispatching rules mentioned in the literature. Experimental results show that the new look-ahead dynamic assignment algorithm and dynamic scheduling approaches consistently outperform vehicle dispatching rules

    Production scheduling in a foundry machine shop

    Get PDF
    Bibliography: pages 89-92.The scheduling of production in job shops is generally accomplished in four stages; aggregate planning, machine loading, sequencing and detailed scheduling. In industrial job shops, the number of jobs and machines makes detailed scheduling a particularly complicated and unwieldy task. When faced with this situation, a typical response of managements is to simply ignore the problem and apply some remedial action by adapting existing company operation procedures. The first objective of this dissertation is to indicate the dangers and inefficiencies which result when the problem of detailed scheduling is ignored. This is done in terms of a case study analysis in which the problems which currently exist in the machine shop at Atlantis Aluminium, a jobbing foundry, are illustrated. The second objective is to develop a systematic approach for the solution of detailed scheduling in job shops. Major steps in this approach are: i) a classification of shop scheduling problems ii) a survey of relevant scheduling literature in order to determine existing detailed scheduling techniques iii) the design of the scheduling system This approach is illustrated by applying it to the machine shop at Atlantis Aluminium