Implementing Multi-Periodic Critical Systems: from Design to Code Generation
This article presents a complete scheme for the development of Critical
Embedded Systems with Multiple Real-Time Constraints. The system is programmed
with a language that extends the synchronous approach with high-level real-time
primitives. It enables to assemble in a modular and hierarchical manner several
locally mono-periodic synchronous systems into a globally multi-periodic
synchronous system. It also allows to specify flow latency constraints. A
program is translated into a set of real-time tasks. The generated code (\C\
code) can be executed on a simple real-time platform with a dynamic-priority
scheduler (EDF). The compilation process (each algorithm of the process, not
the compiler itself) is formally proved correct, meaning that the generated
code respects the real-time semantics of the original program (respect of
periods, deadlines, release dates and precedences) as well as its functional
semantics (respect of variable consumption).Comment: 15 pages, published in Workshop on Formal Methods for Aerospace
(FMA'09), part of Formal Methods Week 2009
A static scheduling approach to enable safety-critical OpenMP applications
Parallel computation is fundamental to satisfy the performance requirements of advanced safety-critical systems. OpenMP is a good candidate to exploit the performance opportunities of parallel platforms. However, safety-critical systems are often based on static allocation strategies, whereas current OpenMP implementations are based on dynamic schedulers. This paper proposes two OpenMP-compliant static allocation approaches: an optimal but costly approach based on an ILP formulation, and a sub-optimal but tractable approach that computes a worst-case makespan bound close to the optimal one.This work is funded by the EU projects P-SOCRATES (FP7-ICT-2013-10) and HERCULES (H2020/ICT/2015/688860), and the Spanish Ministry of Science and Innovation under contract TIN2015-65316-P.Peer ReviewedPostprint (author's final draft
Towards an HLA Run-time Infrastructure with Hard Real-time Capabilities
Our work takes place in the context of the HLA standard and its application in real-time systems context. The HLA standard is inadequate for taking into consideration the different constraints involved in real-time computer systems. Many works have been invested in order to providing real-time capabilities to Run Time Infrastructures (RTI) to run real time simulation. Most of these initiatives focus on major issues including QoS guarantee, Worst Case Transit Time (WCTT) knowledge and scheduling services provided by the underlying operating systems. Even if our ultimate objective is to achieve real-time capabilities for distributed HLA federations executions, this paper describes a preliminary work focusing on achieving hard real-time properties for HLA federations running on a single computer under Linux operating systems. Our paper proposes a novel global bottom up approach for designing real-time Run time Infrastructures and a formal model for validation of uni processor to (then) distributed real-time simulation with CERTI
How the structure of precedence constraints may change the complexity class of scheduling problems
This survey aims at demonstrating that the structure of precedence
constraints plays a tremendous role on the complexity of scheduling problems.
Indeed many problems can be NP-hard when considering general precedence
constraints, while they become polynomially solvable for particular precedence
constraints. We also show that there still are many very exciting challenges in
this research area
Project scheduling under uncertainty using fuzzy modelling and solving techniques
In the real world, projects are subject to numerous uncertainties at different levels of planning. Fuzzy project scheduling is one of the approaches that deal with uncertainties in project scheduling problem. In this paper, we provide a new technique that keeps uncertainty at all steps of the modelling and solving procedure by considering a fuzzy modelling of the workload inspired from the fuzzy/possibilistic approach. Based on this modelling, two project scheduling techniques, Resource Constrained Scheduling and Resource Leveling, are considered and generalized to handle fuzzy parameters. We refer to these problems as the Fuzzy Resource Constrained Project Scheduling Problem (FRCPSP) and the Fuzzy Resource Leveling Problem (FRLP). A Greedy Algorithm and a Genetic Algorithm are provided to solve FRCPSP and FRLP respectively, and are applied to civil helicopter maintenance within the framework of a French industrial project called Helimaintenance
A scheduling theory framework for GPU tasks efficient execution
Concurrent execution of tasks in GPUs can reduce the computation time of a workload by
overlapping data transfer and execution commands.
However it is difficult to implement an efficient run-
time scheduler that minimizes the workload makespan
as many execution orderings should be evaluated. In
this paper, we employ scheduling theory to build a
model that takes into account the device capabili-
ties, workload characteristics, constraints and objec-
tive functions. In our model, GPU tasks schedul-
ing is reformulated as a flow shop scheduling prob-
lem, which allow us to apply and compare well known
methods already developed in the operations research
field. In addition we develop a new heuristic, specif-
ically focused on executing GPU commands, that
achieves better scheduling results than previous tech-
niques. Finally, a comprehensive evaluation, showing
the suitability and robustness of this new approach,
is conducted in three different NVIDIA architectures
(Kepler, Maxwell and Pascal).Proyecto TIN2016- 0920R, Universidad de Málaga (Campus de Excelencia Internacional Andalucía Tech) y programa de donación de NVIDIA Corporation
Formal and Informal Methods for Multi-Core Design Space Exploration
We propose a tool-supported methodology for design-space exploration for
embedded systems. It provides means to define high-level models of applications
and multi-processor architectures and evaluate the performance of different
deployment (mapping, scheduling) strategies while taking uncertainty into
account. We argue that this extension of the scope of formal verification is
important for the viability of the domain.Comment: In Proceedings QAPL 2014, arXiv:1406.156
Solution and quality robust project scheduling: a methodological framework.
The vast majority of the research efforts in project scheduling over the past several years has concentrated on the development of exact and suboptimal procedures for the generation of a baseline schedule assuming complete information and a deterministic environment. During execution, however, projects may be the subject of considerable uncertainty, which may lead to numerous schedule disruptions. Predictive-reactive scheduling refers to the process where a baseline schedule is developed prior to the start of the project and updated if necessary during project execution. It is the objective of this paper to review possible procedures for the generation of proactive (robust) schedules, which are as well as possible protected against schedule disruptions, and for the deployment of reactive scheduling procedures that may be used to revise or re-optimize the baseline schedule when unexpected events occur. We also offer a methodological framework that should allow project management to identify the proper scheduling methodology for different project scheduling environments. Finally, we survey the basics of Critical Chain scheduling and indicate in which environments it is useful.Framework; Information; Management; Processes; Project management; Project scheduling; Project scheduling under uncertainty; Stability; Robust scheduling; Quality; Scheduling; Stability; Uncertainty;
- …