    Improving construction materials management practices in construction sites

    Get PDF
    Construction Materials Management is a vital function for improving productivity in construction projects. Poor materials management can often affect the overall construction time, quality and budget. Currently, the construction material management practice in Somalia is believed to be poorly performed. Lack of standardized construction materials management system is one of the key issues facing by the building industry in Mogadishu-Somalia. The aim of this study was to investigate the current practices of material management at construction sites in Mogadishu-Somalia. A questionnaire survey study design was used to explore construction materials management practices. Fifty questionnaires were distributed to project managers, project engineers, site engineers, engineer, and foreman, and they were received and analysed. The following data analysis techniques were used: descriptive statistics were conducted to report sample characteristics, reliability and validity analyses were performed to confirm robustness of the instrument, graphical presentation such as bar charts were developed, and finally Average Mean Index Scale were constructed. The study results reveals that, 46.7% of respondent’s organization obtain materials for sites without site requisition by site engineer provisions, while 28.9% of respondent’s organization procure materials for sites with site requisition by project manager provisions and 13.3% of respondent’s organization procure materials for site by engineer. The results indicated that currently there is no standardized and computerized construction materials management system applied in Somalia. The researcher concluded that all contracting companies are interested in using some techniques of managing construction materials such as creating and updating database for materials categories from local and international suppliers. Finally, researcher recommends to use computerized construction materials management systems to reduce effort and time, and to achieve more accurate results

    Development of a Science Database System Applicable to Various Access Restrictions

    Get PDF
    金沢大学総合メディア基盤センターWe developed a general-purpose database (DB) system that manages and opens experimental and/or observational data accumulated in universities and academic institutes. This platform works as a web-DB management system in which databases can be easily managed without special skills and facilities. By defining a group manager and data manager, the proposed system defines a flexible access restriction for each user and each unit of datasets under the control of these managers. We demonstrate how a variety of web-DBs are appropriately integrated under one management system in such situations in which each web-DB has a different user interface in its search and data distribution functions and is designed with a different language (or script) and connection method to its DB. In spite of the diversity of web-DBs, the proposed system is highly suitable for practical use

    Structure of a Formal User Model for Construction Information Retrieval

    Get PDF
    Information science researchers and developers have spent many years addressing the problem of retrieving the exact information needed and using it for analysis purposes. In informationseeking dialogues, the user, i.e. construction project manager or supplier, often asks questions about specific aspects of the tasks they want to perform. But most of the time it is difficult for the software systems to unambiguously understand their overall intentions. The existence of information tunnels (Tannenbaum 2002) aggravates this phenomenon. This study includes a detailed case study of the material management process in the construction industry. Based on this case study, the structure of a formal user model for information retrieval in construction management is proposed. This prototype user model will be incorporated into the system design for construction information management and retrieval. This information retrieval system is a user-centered product based on the development of a user configurable visitor mechanism for managing and retrieving project information without worrying too much about the underlying data structure of the database system. An executable UML model combined with OODB is used to reduce the ambiguity in the user's intentions and to achieve user satisfaction

    Protocol for the EARCO Registry : a pan-European observational study in patients with α1-antitrypsin deficiency

    Get PDF
    Rationale and objectives Alpha-1 antitrypsin deficiency (AATD) is a genetic condition that leads to an increased risk of emphysema and liver disease. Despite extensive investigation, there remain unanswered questions concerning the natural history, pathophysiology, genetics and the prognosis of the lung disease in association with AATD. The European Alpha-1 Clinical Research Collaboration (EARCO) is designed to bring together researchers from European countries and to create a standardised database for the follow-up of patients with AATD. Study design and population The EARCO Registry is a non-interventional, multicentre, pan-European, longitudinal observational cohort study enrolling patients with AATD. Data will be collected prospectively without interference/modification of patient's management by the study team. The major inclusion criterion is diagnosed severe AATD, defined by an AAT serum level <11 µM (50 mg·dL−1) and/or a proteinase inhibitor genotype ZZ, SZ or compound heterozygotes or homozygotes of other rare deficient variants. Assessments at baseline and during the yearly follow-up visits include lung function testing (spirometry, body plethysmography and diffusing capacity of the lung), exercise capacity, blood tests and questionnaires (symptoms, quality of life and physical activity). To ensure correct data collection, there will be designated investigator staff to document the data in the case report form. All data will be reviewed by the EARCO database manager. Summary The EARCO Registry aims to understand the natural history and prognosis of AATD better with the goal to create and validate prognostic tools to support medical decision-making

    Comparison of module usage of project management information system and success rate of construction projects: case study

    Get PDF
    If construction is about delivering a built asset that is of high quality and efficiency, wouldn t most companies use all the tools and processes available at the highest organizational level possible? A major assumption is made that Prolog Manager is an effective Project Management Information System. Saying Company X will benefit from more module use with Prolog Manager system is not the same as saying they will suffer from lack of module usage. If a company has already attained success using manual systems it successes may continue. To be as successful as possible, maximum utilization of all modules of Prolog Manager at the unique project type organizational level is necessary, and correlations can be made between higher module usage and greater project successes with this type of company size and structure.M.S.Committee Chair: Dr. Linda Thomas-Mobley; Committee Member: Dr. Daniel Castro; Committee Member: Prof. Kathy Roper; Committee Member: Ron L. Smit