320 research outputs found

    A Survey of Pipelined Workflow Scheduling: Models and Algorithms

    Get PDF
    International audienceA large class of applications need to execute the same workflow on different data sets of identical size. Efficient execution of such applications necessitates intelligent distribution of the application components and tasks on a parallel machine, and the execution can be orchestrated by utilizing task-, data-, pipelined-, and/or replicated-parallelism. The scheduling problem that encompasses all of these techniques is called pipelined workflow scheduling, and it has been widely studied in the last decade. Multiple models and algorithms have flourished to tackle various programming paradigms, constraints, machine behaviors or optimization goals. This paper surveys the field by summing up and structuring known results and approaches

    Metaheuristic approaches for Complete Network Signal Setting Design (CNSSD)

    Get PDF
    2014 - 2015In order to mitigate the urban traffic congestion and increase the travelers’ surplus, several policies can be adopted which may be applied in short or long time horizon. With regards to the short term policies, one of the most straightforward is control through traffic lights at single junction or network level. The main goal of traffic control is avoiding that incompatible approaches have green at the same time. With respect to this aim existing methodologies for Signal Setting Design (NSSD) can be divided into two classes as in following described Approach-based (or Phase-based) methods address the signal setting as a periodic scheduling problem: the cycle length, and for each approach the start and the end of the green are considered as decision variables, some binary variables (or some non-linear constraints) are included to avoid incompatible approaches having green at the same time (see for instance Improta and Cantarella, 1987). If needed the stage composition and sequence may easily be obtained from decision variables. Commercial software codes following this methodology are available for single junction control only, such Oscady Pro® (TRL, UK; Burrow, 1987). Once the green timing and scheduling have been carried out for each junction, offsets can be optimized (coordination) using the stage matrices obtained from single junction optimization (possibly together with green splits again) through one of codes mentioned below. Stage-based signal setting methods dealt with that by dividing the cycle length into stages, each one being a time interval during which some mutually compatible approaches have green. Stage composition, say which approaches have green, and sequence, say their order, can be represented through the approach-stage incidence matrix, or stage matrix for short. Once the stage matrix is given for each junction, the cycle length, the green splits and the offsets can be optimised (synchronisation) through some well established commercial software codes. Two of the most commonly used codes are: TRANSYT14® (TRL, UK) (recently TRANSYT15® has been released) and TRANSYT-7F® (FHWA, USA). Both allow to compute the green splits, the offsets and the cycle length by combining a traffic flow model and a signal setting optimiser. Both may be used for coordination (optimisation of offsets only, once green splits are known) or synchronisation. TRANSYT14® generates several (but not all) significant stage sequences to be tested but the optimal solution is not endogenously generated, while TRANSYT-7F® is able to optimise the stage sequence for each single junction starting from the ring and barrier NEMA (i.e. National Electrical Manufacturers Association) phases. Still these methods do not allow for stage matrix optimisation; moreover the effects of stage composition and sequence on network performance are not well analysed in literature... [edited by Author]XIV n.s

    New solution methods for single machine bicriteria scheduling problem : minimization of average flowtime and number of tardy jobs

    Get PDF
    Cataloged from PDF version of article.In this thesis, we consider the bicriteria scheduling problem of minimizing number of tardy jobs and average flowtime on a single machine. This problem, which is known to be NP-hard, is important in practice as the former criterion conveys the customer’s position and the latter reflects the manufacturer’s perspective in the supply chain. We propose two new heuristics to solve this multiobjective scheduling problem. These two heuristics are constructive algorithms which are based on beam search methodology. We compare these proposed algorithms with three existing heuristics in the literature and two new meta-heuristics. Our computational experiments illustrate that proposed heuristics find efficient schedules optimally in most of the cases and perform better than the other heuristics.Erenay, Fatih SafaM.S

    The bi-objective travelling salesman problem with profits and its connection to computer networks.

    Get PDF
    This is an interdisciplinary work in Computer Science and Operational Research. As it is well known, these two very important research fields are strictly connected. Among other aspects, one of the main areas where this interplay is strongly evident is Networking. As far as most recent decades have seen a constant growing of every kind of network computer connections, the need for advanced algorithms that help in optimizing the network performances became extremely relevant. Classical Optimization-based approaches have been deeply studied and applied since long time. However, the technology evolution asks for more flexible and advanced algorithmic approaches to model increasingly complex network configurations. In this thesis we study an extension of the well known Traveling Salesman Problem (TSP): the Traveling Salesman Problem with Profits (TSPP). In this generalization, a profit is associated with each vertex and it is not necessary to visit all vertices. The goal is to determine a route through a subset of nodes that simultaneously minimizes the travel cost and maximizes the collected profit. The TSPP models the problem of sending a piece of information through a network where, in addition to the sending costs, it is also important to consider what “profit” this information can get during its routing. Because of its formulation, the right way to tackled the TSPP is by Multiobjective Optimization algorithms. Within this context, the aim of this work is to study new ways to solve the problem in both the exact and the approximated settings, giving all feasible instruments that can help to solve it, and to provide experimental insights into feasible networking instances

    Single machine interfering jobs problem with flowtime objective

    Get PDF
    Interfering jobs problems (or multi agents scheduling problems) are an emergent topic in the scheduling literature.In these decisión problems,two or more sets of jobs have to be scheduled, each one with its own criteria. More specifically, we focus on a problem in which jobs belonging to two sets have to be scheduled in a single machine in order to minimize the total flowtime of the jobs in one set, while the total flowtime of the jobs in the other set should not exceed a given constant €. This problem is known to be weakly NP- hard, and, in the literature, a dynamic programming (DP) algorithm has been proposed to find optimal solutions. In this paper, we first analyse the distribution of solutions of the problem in order to establish its empirical hardness. Next, a novel encoding scheme and a set of properties associated to the neighbourhood of this scheme are presented. These properties are used to develop both exact and approximate methods, i.e. a branch and bound (B&B) method, several constructive heuristics, and different versions of a genetic algorithm (GA). The computational experience carried out shows that the proposed B&B is more efficient than the exist- ing DP algorithm. The results also show the advantages of the proposed encoding scheme, as the approximate methods yield close-to-optimum solutions for big-sized instances where exact methods are not feasible.Ministerio de Economía y Competitividad DPI2013-44461-P/DPIMinisterio de Economía y Competitividad DPI2010-15573/DP