65,327 research outputs found

    Finite domain constraint programming systems

    Get PDF
    Tutorial at CP'2002, Principles and Practice of Constraint Programming. Powerpoint slides.</p

    Combining Homotopy Methods and Numerical Optimal Control to Solve Motion Planning Problems

    Full text link
    This paper presents a systematic approach for computing local solutions to motion planning problems in non-convex environments using numerical optimal control techniques. It extends the range of use of state-of-the-art numerical optimal control tools to problem classes where these tools have previously not been applicable. Today these problems are typically solved using motion planners based on randomized or graph search. The general principle is to define a homotopy that perturbs, or preferably relaxes, the original problem to an easily solved problem. By combining a Sequential Quadratic Programming (SQP) method with a homotopy approach that gradually transforms the problem from a relaxed one to the original one, practically relevant locally optimal solutions to the motion planning problem can be computed. The approach is demonstrated in motion planning problems in challenging 2D and 3D environments, where the presented method significantly outperforms a state-of-the-art open-source optimizing sampled-based planner commonly used as benchmark

    A hybrid GA–PS–SQP method to solve power system valve-point economic dispatch problems

    No full text
    This study presents a new approach based on a hybrid algorithm consisting of Genetic Algorithm (GA), Pattern Search (PS) and Sequential Quadratic Programming (SQP) techniques to solve the well-known power system Economic dispatch problem (ED). GA is the main optimizer of the algorithm, whereas PS and SQP are used to fine tune the results of GA to increase confidence in the solution. For illustrative purposes, the algorithm has been applied to various test systems to assess its effectiveness. Furthermore, convergence characteristics and robustness of the proposed method have been explored through comparison with results reported in literature. The outcome is very encouraging and suggests that the hybrid GA–PS–SQP algorithm is very efficient in solving power system economic dispatch problem

    The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling

    Get PDF
    Over the past few years growing global competition has forced the manufacturing industries to upgrade their old production strategies with the modern day approaches. As a result, recent interest has been developed towards finding an appropriate policy that could enable them to compete with others, and facilitate them to emerge as a market winner. Keeping in mind the abovementioned facts, in this paper the authors have proposed an integrated process planning and scheduling model inheriting the salient features of outsourcing, and leagile principles to compete in the existing market scenario. The paper also proposes a model based on leagile principles, where the integrated planning management has been practiced. In the present work a scheduling problem has been considered and overall minimization of makespan has been aimed. The paper shows the relevance of both the strategies in performance enhancement of the industries, in terms of their reduced makespan. The authors have also proposed a new hybrid Enhanced Swift Converging Simulated Annealing (ESCSA) algorithm, to solve the complex real-time scheduling problems. The proposed algorithm inherits the prominent features of the Genetic Algorithm (GA), Simulated Annealing (SA), and the Fuzzy Logic Controller (FLC). The ESCSA algorithm reduces the makespan significantly in less computational time and number of iterations. The efficacy of the proposed algorithm has been shown by comparing the results with GA, SA, Tabu, and hybrid Tabu-SA optimization methods
    • 

    corecore