258 research outputs found

    Multicriteria hybrid flow shop scheduling problem: literature review, analysis, and future research

    Get PDF
    This research focuses on the Hybrid Flow Shop production scheduling problem, which is one of the most difficult problems to solve. The literature points to several studies that focus the Hybrid Flow Shop scheduling problem with monocriteria functions. Despite of the fact that, many real world problems involve several objective functions, they can often compete and conflict, leading researchers to concentrate direct their efforts on the development of methods that take consider this variant into consideration. The goal of the study is to review and analyze the methods in order to solve the Hybrid Flow Shop production scheduling problem with multicriteria functions in the literature. The analyses were performed using several papers that have been published over the years, also the parallel machines types, the approach used to develop solution methods, the type of method develop, the objective function, the performance criterion adopted, and the additional constraints considered. The results of the reviewing and analysis of 46 papers showed opportunities for future researchon this topic, including the following: (i) use uniform and dedicated parallel machines, (ii) use exact and metaheuristics approaches, (iv) develop lower and uppers bounds, relations of dominance and different search strategiesto improve the computational time of the exact methods,  (v) develop  other types of metaheuristic, (vi) work with anticipatory setups, and (vii) add constraints faced by the production systems itself

    Preemptive scheduling on uniform parallel machines with controllable job processing times

    Get PDF
    In this paper, we provide a unified approach to solving preemptive scheduling problems with uniform parallel machines and controllable processing times. We demonstrate that a single criterion problem of minimizing total compression cost subject to the constraint that all due dates should be met can be formulated in terms of maximizing a linear function over a generalized polymatroid. This justifies applicability of the greedy approach and allows us to develop fast algorithms for solving the problem with arbitrary release and due dates as well as its special case with zero release dates and a common due date. For the bicriteria counterpart of the latter problem we develop an efficient algorithm that constructs the trade-off curve for minimizing the compression cost and the makespan

    A Bicriteria Simulated Annealing Algorithm for Scheduling Jobs on Parallel Machines with Sequence Dependent Setup Times

    Get PDF
    The study considers the scheduling problem of identical parallel machines subject to minimization of the maximum completion time and the maximum tardiness expressed in a linear convex objective function. The maximum completion time or makespan is the date when the last job to be completed leaves the system. The maximum tardiness is indicated by the job that is completed with the longest delay relative its due date. Minimizing both criteria can help assuring a high utilization of the production system as well as a high level of service towards the client. Due to the complexity of the problem, a Simulated Annealing (SA) heuristic has been implemented to be able to obtain an efficient solution in a reasonable running time. A set of n jobs is assigned, to one of the m identical parallel machines. Each job is processed in only one operation before its completion after which it leaves the system. Constraints, such as due dates for each job and setup times for the machines, are considered. The resolution procedure consists of two phases and begins with an initial solution generator. Then a SA heuristic is applied for further improvement of the solution. 4 generators are used to create an initial solution and 3 to generate neighbour solutions. To test and verify the performance of the proposed resolution procedure, a computational experimentation has been realized on a set of test problems generated ad-hoc

    Single-machine bicriteria scheduling

    Get PDF

    New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobs

    Get PDF
    Cataloged from PDF version of article.We consider the bicriteria scheduling problem of minimizing the number of tardy jobs and average flowtime on a single machine. This problem, which is known to be NP-hard, is important in practice, as the former criterion conveys the customer’s position, and the latter reflects the manufacturer’s perspective in the supply chain. We propose four new heuristics to solve this multiobjective scheduling problem. Two of these heuristics are constructive algorithms based on beam search methodology. The other two are metaheuristic approaches using a genetic algorithm and tabu-search. Our computational experiments indicate that the proposed beam search heuristics find efficient schedules optimally in most cases and perform better than the existing heuristics in the literature. 2009 Elsevier B.V. All rights reserved

    Extended classification for flowshops with resequencing

    Get PDF
    Este trabajo presenta una clasificación extendida de líneas de flujo no-permutación. Se consideran las múltiples opciones que se presentan al incluir la posibilidad de resecuenciar piezas en la línea. Se ha visto que en la literatura actual no se ha clasificado con profundidad este tipo de producción. Abstract This paper presents an extended cassification for non-permutation flowshops. The versatile options which occur with the possibility of resequencing jobs within the line are considered. The literature review shows that no classification exists which considers extensively this type of flowshop
    corecore