371,633 research outputs found
The integration of process planning and machine loading in small batch part manufacturing
PART is a highly automated planning system in which both process and production planning functions are integrated. This paper discusses a method to improve machine tool selection in process planning by integration with loading. A method is presented to select the best process plan from a number of possible alternatives taking into account the limited availability of resources. Various aspects of the quality of a process plan are evaluated and expressed in the so-called evaluation time. To prevent redundant work, partly worked out process plans are considered as alternatives. The consequences of the different alternatives have to be estimated which includes the estimation of machining times. The loading problem is modelled as the minimization of the total evaluation time for a given order set, subjected to capacity constraints
Heuristic Solutions for Loading in Flexible Manufacturing Systems
Production planning in flexible manufacturing system deals with the efficient organization of the production resources in order to meet a given production schedule. It is a complex problem and typically leads to several hierarchical subproblems that need to be solved sequentially or simultaneously. Loading is one of the planning subproblems that has to addressed. It involves assigning the necessary operations and tools among the various machines in some optimal fashion to achieve the production of all selected part types. In this paper, we first formulate the loading problem as a 0-1 mixed integer program and then propose heuristic procedures based on Lagrangian relaxation and tabu search to solve the problem. Computational results are presented for all the algorithms and finally, conclusions drawn based on the results are discussed
The Integration of Process Planning and Shop Floor Scheduling in Small Batch Part Manufacturing
In this paper we explore possibilities to cut manufacturing leadtimes and to improve delivery performance in a small batch part manufacturing shop by integrating process planning and shop floor scheduling. Using a set of initial process plans (one for each order in the shop), we exploit a resource decomposition procedure to determine schedules to determine schedules which minimize the maximum lateness, given these process plans. If the resulting schedule is still unsatisfactory, a critical path analysis is performed to select jobs as candidates for alternative process plans. In this way, an excellent due date performance can be achieved, with a minimum of process planning and scheduling effort
An extensible manufacturing resource model for process integration
Driven by industrial needs and enabled by process technology and information technology, enterprise integration is rapidly shifting from information integration to process integration to improve overall performance of enterprises. Traditional resource models are established based on the needs of individual applications. They cannot effectively serve process integration which needs resources to be represented in a unified, comprehensive and flexible way to meet the needs of various applications for different business processes. This paper looks into this issue and presents a configurable and extensible resource model which can be rapidly reconfigured and extended to serve for different applications. To achieve generality, the presented resource model is established from macro level and micro level. A semantic representation method is developed to improve the flexibility and extensibility of the model
Information support and interactive planning in the digital factory : approach and industry-driven evaluation
In the modern world we are continuously surrounded by information. The human brain has to analyse and interpret this information to transform into useable knowledge that is then used in decision making activities. The advent and implementation of Industry 4.0 will make it a requirement for systems within factories to interact and share large quantities of information with each other. This large volume of information will make it even more difficult for the human resources within the factory to sift through the large amount of information required since there is a limit to the information that our brains can cope with. Just in time information retrieval (JITIR) within the digital factory environment aims to provide support to the human stakeholders in the system by proactively yet non-intrusively providing the required information at the right time based on the users context. This paper will therefore provide an insight into the cognitive difficulties experienced by humans in the digital factory and how JITIR can tackle these challenges. By validating the JITIR concept, several industry scenarios have been evaluated: an exemplary model, concerning the machine tool industry, is presented in the paper. The results of this research are a set of guidelines for the development of a digital factory support tool.peer-reviewe
Operational Plan for HMIS Rollout to be Read in Conjunction with the MoH&SW Document of October 2007
The MoH&SW, with a consortium of partners, in October 2007, developed a Proposal to Strengthen the HMIS in Tanzania. This document builds on that proposal to develop a budgeted 6‐month plan to kick‐start implementation of the Revised MTUHA in one region and at national level, to develop a replicable model that can be scaled up to other regions as additional funds become available. The overall HMIS revision process will ensure that, within a period of five years the HMIS will be functional in all 21 regions of the country, in a phased manner Six months intensive systems and database development in Mtwara region Eighteen months implementation in one region in each of the six zones Within 5 years, National rollout to every region The initial six months implementation process, described in depth in this document, will use action research and participatory development methodology that will integrate the six work packages in the HMIS document, in line with the HSSP III proposals for strengthening M&E. A number of dedicated teams will roll out the HMIS, develop a toolkit for implementation in other regions and produce a modern web based data warehouse. The project logframe aims to provide quality routine data for monitoring MDGs and the NHSSPIII by producing five outputs – HMIS revision, HMIS implementation, Capacity development, the DHIS software and action research. Terms of reference are developed for each of the HMIS teams, based on the activities in the logframe – Indicator and dataset revision, HMIS design, Database development and training team. An action‐based budget of US1,25 million for the first year, including the rollout activities, the development of training material, adaptation of software etc. The other six regions will cost 1,05million for first year; all regions will reduce to 300,000 in the third year. National level costs will reduce from 1,2 million for the first year, including the rollout activities, the development of training material, adaptation of software et
Issues in Evaluating Health Department Web-Based Data Query Systems: Working Papers
Compiles papers on conceptual and methodological topics to consider in evaluating state health department systems that provide aggregate data online, such as taxonomy, logic models, indicators, and design. Includes surveys and examples of evaluations
Development of titanium dioxide nanoparticles/nanosolution for photocatalytic activity
Biological and chemical contaminants by man-made activities have been serious
global issue. Exposure of these contaminants beyond the limits may result in serious
environmental and health problem. Therefore, it is important to develop an effective
solution that can be easily utilized by mankind. One of the effective ways to
overcome this problem is by using titanium dioxide (TiO2). TiO2 is a well-known
photocatalyst that widely used for environmental clean-up due to its ability to
decompose organic pollutant and kill bacteria. Although it is proven TiO2 has an
advantage to solve this concern, its usefulness unfortunately is limited only under
UV light irradiation. Therefore, the aim of this work was to investigate the potential
of TiO2 that can be activated under visible light by the incorporation of metal ions
(Fe, Ag, Zr and Ag-Zr). In this study, sol-gel method was employed for the synthesis
of metal ions incorporated TiO2. XRD analysis revealed that all samples content
biphasic anatase-brookite TiO2 of size 3 nm to 5 nm. It was found that the
incorporation of these metal ions did not change the morphology of TiO2 but the
crystallinity and optical properties were affected. The crystallinity of anatase in the
biphasic TiO2 was found to be decreased and favored brookite formation. PL analysis
showed metal ions incorporation suppressed the recombination of electron-hole pairs
while the band gap energy of TiO2 (3.2 eV) was decreased by the incorporation of Fe
(2.46 eV) and Ag (2.86 eV). Among this incorporation, Ag-Zr incorporated TiO2
showed highest performance for methyl orange degradation (93%) under fluorescent
xxv
light irradiation for 10 h. This follows by Zr-TiO2 (82%), Fe-TiO2 (75%) and Ag�TiO2 (43%). Meanwhile, the highest antibacterial performance was exhibited by Ag�TiO2. TEM images showed that E.coli bacterium was killed within 12 h after treated
with Ag-TiO2. The results obtained from the fieldwork study established that Ag-Zr
incorporation have excellent performances for VOC removal and antibacterial test.
The VOC content after treated with Ag-Zr-TiO2 fulfilled the Industry Code of
Practice on Indoor Air Quality 2010 which is lower than 3 ppm. In addition, the
percentage of microbes also found to be decrease around 45 % within 5 days of
monitoring
BIM adoption and implementation for architectural practices
Severe issues about data acquisition and management arise during the design creation and development due to complexity, uncertainty and ambiguity. BIM (Building Information Modelling) is a tool for a team based lean design approach towards improved architectural practice across the supply chain. However, moving from a CAD (Computer Aided Design) approach to BIM (Building Information Modelling) represents a fundamental change for individual disciplines and the construction industry as a whole. Although BIM has been implemented by large practices, it is not widely used by SMEs (Small and Medium Sized Enterprises).
Purpose: This paper aims to present a systematic approach for BIM implementation for Architectural SMEs at the organizational level
Design/Methodology/Approach: The research is undertaken through a KTP (Knowledge transfer Partnership) project between the University of Salford and John McCall Architects (JMA) a SME based in Liverpool. The overall aim of the KTP is to develop lean design practice through BIM adoption. The BIM implementation approach uses a socio-technical view which does not only consider the implementation of technology but also considers the socio-cultural environment that provides the context for its implementation. The action research oriented qualitative and quantitative research is used for discovery, comparison, and experimentation as it provides �learning by doing�.
Findings: The strategic approach to BIM adoption incorporated people, process and technology equally and led to capacity building through the improvements in process, technological infrastructure and upskilling of JMA staff to attain efficiency gains and competitive advantages.
Originality/Value: This paper introduces a systematic approach for BIM adoption based on the action research philosophy and demonstrates a roadmap for BIM adoption at the operational level for SME companie
- …