5,653 research outputs found
Competitive-Ratio Approximation Schemes for Minimizing the Makespan in the Online-List Model
We consider online scheduling on multiple machines for jobs arriving
one-by-one with the objective of minimizing the makespan. For any number of
identical parallel or uniformly related machines, we provide a
competitive-ratio approximation scheme that computes an online algorithm whose
competitive ratio is arbitrarily close to the best possible competitive ratio.
We also determine this value up to any desired accuracy. This is the first
application of competitive-ratio approximation schemes in the online-list
model. The result proves the applicability of the concept in different online
models. We expect that it fosters further research on other online problems
Malleable Scheduling Beyond Identical Machines
In malleable job scheduling, jobs can be executed simultaneously on multiple machines with the processing time depending on the number of allocated machines. Jobs are required to be executed non-preemptively and in unison, in the sense that they occupy, during their execution, the same time interval over all the machines of the allocated set. In this work, we study generalizations of malleable job scheduling inspired by standard scheduling on unrelated machines. Specifically, we introduce a general model of malleable job scheduling, where each machine has a (possibly different) speed for each job, and the processing time of a job j on a set of allocated machines S depends on the total speed of S for j. For machines with unrelated speeds, we show that the optimal makespan cannot be approximated within a factor less than e/(e-1), unless P = NP. On the positive side, we present polynomial-time algorithms with approximation ratios 2e/(e-1) for machines with unrelated speeds, 3 for machines with uniform speeds, and 7/3 for restricted assignments on identical machines. Our algorithms are based on deterministic LP rounding and result in sparse schedules, in the sense that each machine shares at most one job with other machines. We also prove lower bounds on the integrality gap of 1+phi for unrelated speeds (phi is the golden ratio) and 2 for uniform speeds and restricted assignments. To indicate the generality of our approach, we show that it also yields constant factor approximation algorithms (i) for minimizing the sum of weighted completion times; and (ii) a variant where we determine the effective speed of a set of allocated machines based on the L_p norm of their speeds
An EPTAS for Scheduling on Unrelated Machines of Few Different Types
In the classical problem of scheduling on unrelated parallel machines, a set
of jobs has to be assigned to a set of machines. The jobs have a processing
time depending on the machine and the goal is to minimize the makespan, that is
the maximum machine load. It is well known that this problem is NP-hard and
does not allow polynomial time approximation algorithms with approximation
guarantees smaller than unless PNP. We consider the case that there
are only a constant number of machine types. Two machines have the same
type if all jobs have the same processing time for them. This variant of the
problem is strongly NP-hard already for . We present an efficient
polynomial time approximation scheme (EPTAS) for the problem, that is, for any
an assignment with makespan of length at most
times the optimum can be found in polynomial time in the
input length and the exponent is independent of . In particular
we achieve a running time of , where
denotes the input length. Furthermore, we study three other problem
variants and present an EPTAS for each of them: The Santa Claus problem, where
the minimum machine load has to be maximized; the case of scheduling on
unrelated parallel machines with a constant number of uniform types, where
machines of the same type behave like uniformly related machines; and the
multidimensional vector scheduling variant of the problem where both the
dimension and the number of machine types are constant. For the Santa Claus
problem we achieve the same running time. The results are achieved, using mixed
integer linear programming and rounding techniques
Energy Efficient Scheduling via Partial Shutdown
Motivated by issues of saving energy in data centers we define a collection
of new problems referred to as "machine activation" problems. The central
framework we introduce considers a collection of machines (unrelated or
related) with each machine having an {\em activation cost} of . There
is also a collection of jobs that need to be performed, and is
the processing time of job on machine . We assume that there is an
activation cost budget of -- we would like to {\em select} a subset of
the machines to activate with total cost and {\em find} a schedule
for the jobs on the machines in minimizing the makespan (or any other
metric).
For the general unrelated machine activation problem, our main results are
that if there is a schedule with makespan and activation cost then we
can obtain a schedule with makespan \makespanconstant T and activation cost
\costconstant A, for any . We also consider assignment costs for
jobs as in the generalized assignment problem, and using our framework, provide
algorithms that minimize the machine activation and the assignment cost
simultaneously. In addition, we present a greedy algorithm which only works for
the basic version and yields a makespan of and an activation cost .
For the uniformly related parallel machine scheduling problem, we develop a
polynomial time approximation scheme that outputs a schedule with the property
that the activation cost of the subset of machines is at most and the
makespan is at most for any
- …