2,740,730 research outputs found

    Foxconn Internship Program Plan Appendix 1

    Get PDF
    This document is part of a digital collection provided by the Martin P. Catherwood Library, ILR School, Cornell University, pertaining to the effects of globalization on the workplace worldwide. Special emphasis is placed on labor rights, working conditions, labor market changes, and union organizing.FLA_2012_Apple_VR_Apx1_Interns_China_Foxconn.pdf: 237 downloads, before Oct. 1, 2020

    Biology, Ecology, and Management of Deer in the Chicago Metropolitan Area W-87-R-8, Annual Job Progress Report

    Get PDF
    Annual Job Progress Report July 1, 1986 - June 30, 1987 issued September 28, 1987. Includes Appendix A: Helminthic and protozoan parasites of white-tailed deer in urban areas of northeastern Illinois, Jose G. Cisneros; Appendix B: Recommendations for a cooperative new initiative on urban deer management for Cook County, Illinois; Appendix C: Recommendations for deer removal on O'Hare International Airport.Report issued on: 28 September 1987INHS Technical Report prepared for Illinois Department of Conservation Division of Wildlife Resource

    Circular 59

    Get PDF
    This list of recommended annual flower varieties includes information on several hundred annual flower cultivars. The recommended varieties were selected from flowers grown in 1985 and 1986 at the Agricultural and Forestry Experiment Station Farm at the University of Alaska- Fairbanks. While this is by no means a complete listing of varieties suitable for Interior gardens, it does reflect many years of experience in annual flower production at the AFES farm. The methods used to evaluate the flowers and definitions for terms used in the listing can be found under Data Collection.Introduction -- Methods: Bedding Plant Production, Field Conditions, Weather Conditions, Data Collection -- List of Recommended Annual Flower Varieties -- Photo Section -- Appendix 1. Seeding Information -- Appendix 2. Flower Varieties by Color: Blue, Purple; Red, Pink; Red, Pink and White Mixes; White; Yellow, Orange, Gold; Mixed Colors; Foliage Only -- Appendix 3. Bloom Period: Early Season, All Season, Midseason, Late Season, Frost Resistant -- Appendix 4. Plant Heights: Short Varieties, Medium Varieties, Tall Varieties -- Appendix 5. Flowers for Special Purposes: Hanging Baskets, Light Shade, Walls, Rock Garden, Background -- Appendix 6. Seed Source

    End-of-Life Heart Failure Education With Staff Nurses; A Quality Improvement Project

    Get PDF
    Presented to the Faculty of the University of Alaska Anchorage in Partial Fulfillment of the Requirements for the Degree of MASTER OF SCIENCEHeart failure (HF) is a serious diagnosis and a major public health concern. The symptoms can be exhausting and can vary from person to person with periods of acute exacerbations requiring hospital admission. It is important for hospital staff nurses to be able to speak with knowledge and comfort about end‐of‐life planning. The purpose of this quality improvement project was to increase nurses’ awareness of the functional classification systems of HF, options and timing for palliative care, and describe nurses’ intent to use the information in practice. Nurses reported planning on using the information to “Be more Sensitive and Listen.” The prevailing theme to barriers to implementing this into practice was “Not enough time and discomfort.” Nurses who were comfortable having end‐of‐life discussions did not feel they had enough time, and those who were not comfortable did not engage because of discomfort toward the topic. Furthermore, recommendations from this study were the addition of a supportive palliative care team to manage patients with HF.End-of-Life Heart Failure Education with Staff Nurses; A Quality Improvement Project / Abstract / Table of Contents / Project / Background and Significant / Project Purpose / Literature Review / Methods / Analysis and Findings / Dissemination / Discussion / Conclusion / Impact on Practice / References / Appendix A New York Heart Failure Classification System / Appendix B Plan-Do-Check-Act Cycle / Appendix C Consent Form / Appendix D IRB Approval Letter / Appendix E Permission Letter / Appendix F Pre-Education Survey / Appendix G Post-Education Survey / Appendix H Case Study #1 / Appendix I Case Study #2 / Appendix J 'Do' Phase Education Intervention Lesson Plan / Appendix K Themes from QI Projec

    Database interfaces on NASA's heterogeneous distributed database system

    Get PDF
    The syntax and semantics of all commands used in the template are described. Template builders should consult this document for proper commands in the template. Previous documents (Semiannual reports) described other aspects of this project. Appendix 1 contains all substituting commands used in the system. Appendix 2 includes all repeating commands. Appendix 3 is a collection of DEFINE templates from eight different DBMS's

    National Probation Service and Learning and Skills Council : joint protocol

    Get PDF
    "This protocol sets out how the National Probation Service (NPS) and the Learning and Skills Council (LSC) intend to work together to improve the literacy, numeracy and language (English for Speakers of Other Languages (ESOL)) skills of offenders on NPS supervision. Appendix 1 gives relevant background information about the NPS. Appendix 2 gives relevant background information about the LSC" -- page 3
    • 

    corecore