41,422 research outputs found
Short-Term Resource Allocation and Management
Almost all sectors of the economy, such as, government, healthcare, education, ship repair, construction, and manufacturing require project management. A key component of project management deals with scheduling of tasks such that limited resources are utilized in an effective manner. Current research on resource constrained project-scheduling has been classified as: a) Single project with single mode for various tasks, b) Single project with multiple task modes, c) Multiple projects with single task mode, and d) Multiple projects with multiple task modes.;This work extends the current multi-project, multi-mode scheduling techniques. The resources can be renewable, and non-renewable. In addition, it focuses on short term scheduling, that is, scheduling on an hourly, daily, or weekly basis. Long term scheduling assumes a stable system, that is, resources, priorities, and other constraints do no change during the scheduling period. In this research, short term scheduling assumes a dynamic system, that is, resources, priorities, and other constraints change over time.;A hybrid approach is proposed to address the dynamic nature of the problem. It is based on discrete event simulation and a set of empirical rules provided by the project manager. The project manager is assumed to be highly knowledgeable about the project. He/she is regarded as an integral part of the system. Such an approach is better suited to deal with real world scheduling. The proposed approach does not seek to provide a single optimum solution, instead, it generates a series of feasible solutions, along with the impact of each solution on schedule and cost.;Two project case studies dealing with finding an optimum solution were selected from the literature. The proposed technique was applied to the data set in these studies. In both cases the proposed approach found the optimum solution. The model was then applied to two additional problems to test the features that could not be tested on the dataset from the literature.;As for practical implications, the proposed approach enhances the decision making process, by providing more resource allocation flexibility, and results in improved solutions in terms of total project duration and cost. From an academic viewpoint, this research enriches the existing literature, as it provides an extension of the resource constrained project scheduling problems, a discrete event simulation and four cases studies which highlights relevant issues to model properly the complexity of real-life projects
The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review
Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe
Pre-emptive resource-constrained multimode project scheduling using genetic algorithm: a dynamic forward approach
Purpose: The issue resource over-allocating is a big concern for project engineers in the process
of scheduling project activities. Resource over-allocating drawback is frequently seen after
scheduling of a project in practice which causes a schedule to be useless. Modifying an
over-allocated schedule is very complicated and needs a lot of efforts and time. In this paper, a
new and fast tracking method is proposed to schedule large scale projects which can help project
engineers to schedule the project rapidly and with more confidence.
Design/methodology/approach: In this article, a forward approach for maximizing net
present value (NPV) in multi-mode resource constrained project scheduling problem while
assuming discounted positive cash flows (MRCPSP-DCF) is proposed. The progress payment
method is used and all resources are considered as pre-emptible. The proposed approach
maximizes NPV using unscheduled resources through resource calendar in forward mode. For
this purpose, a Genetic Algorithm is applied to solve.
Findings: The findings show that the proposed method is an effective way to maximize NPV in
MRCPSP-DCF problems while activity splitting is allowed. The proposed algorithm is very fast
and can schedule experimental cases with 1000 variables and 100 resources in few seconds. The
results are then compared with branch and bound method and simulated annealing algorithm and
it is found the proposed genetic algorithm can provide results with better quality. Then algorithm
is then applied for scheduling a hospital in practice.
Originality/value: The method can be used alone or as a macro in Microsoft Office Project®
Software to schedule MRCPSP-DCF problems or to modify resource over-allocated activities
after scheduling a project. This can help project engineers to schedule project activities rapidly
with more accuracy in practice.Peer Reviewe
Millimeter Wave Cellular Networks: A MAC Layer Perspective
The millimeter wave (mmWave) frequency band is seen as a key enabler of
multi-gigabit wireless access in future cellular networks. In order to overcome
the propagation challenges, mmWave systems use a large number of antenna
elements both at the base station and at the user equipment, which lead to high
directivity gains, fully-directional communications, and possible noise-limited
operations. The fundamental differences between mmWave networks and traditional
ones challenge the classical design constraints, objectives, and available
degrees of freedom. This paper addresses the implications that highly
directional communication has on the design of an efficient medium access
control (MAC) layer. The paper discusses key MAC layer issues, such as
synchronization, random access, handover, channelization, interference
management, scheduling, and association. The paper provides an integrated view
on MAC layer issues for cellular networks, identifies new challenges and
tradeoffs, and provides novel insights and solution approaches.Comment: 21 pages, 9 figures, 2 tables, to appear in IEEE Transactions on
Communication
EVEREST IST - 2002 - 00185 : D23 : final report
Deliverable públic del projecte europeu EVERESTThis deliverable constitutes the final report of the project IST-2002-001858 EVEREST. After its successful completion, the project presents this document that firstly summarizes the context, goal and the approach objective of the project. Then it presents a concise summary of the major goals and results, as well as highlights the most valuable lessons derived form the project work. A list of deliverables and publications is included in the annex.Postprint (published version
Solution and quality robust project scheduling: a methodological framework.
The vast majority of the research efforts in project scheduling over the past several years has concentrated on the development of exact and suboptimal procedures for the generation of a baseline schedule assuming complete information and a deterministic environment. During execution, however, projects may be the subject of considerable uncertainty, which may lead to numerous schedule disruptions. Predictive-reactive scheduling refers to the process where a baseline schedule is developed prior to the start of the project and updated if necessary during project execution. It is the objective of this paper to review possible procedures for the generation of proactive (robust) schedules, which are as well as possible protected against schedule disruptions, and for the deployment of reactive scheduling procedures that may be used to revise or re-optimize the baseline schedule when unexpected events occur. We also offer a methodological framework that should allow project management to identify the proper scheduling methodology for different project scheduling environments. Finally, we survey the basics of Critical Chain scheduling and indicate in which environments it is useful.Framework; Information; Management; Processes; Project management; Project scheduling; Project scheduling under uncertainty; Stability; Robust scheduling; Quality; Scheduling; Stability; Uncertainty;
- …