76 research outputs found

    A hybrid shifting bottleneck-tabu search heuristic for the job shop total weighted tardiness problem

    Get PDF
    In this paper, we study the job shop scheduling problem with the objective of minimizing the total weighted tardiness. We propose a hybrid shifting bottleneck - tabu search (SB-TS) algorithm by replacing the reoptimization step in the shifting bottleneck (SB) algorithm by a tabu search (TS). In terms of the shifting bottleneck heuristic, the proposed tabu search optimizes the total weighted tardiness for partial schedules in which some machines are currently assumed to have infinite capacity. In the context of tabu search, the shifting bottleneck heuristic features a long-term memory which helps to diversify the local search. We exploit this synergy to develop a state-of-the-art algorithm for the job shop total weighted tardiness problem (JS-TWT). The computational effectiveness of the algorithm is demonstrated on standard benchmark instances from the literature

    A linear programming-based method for job shop scheduling

    Get PDF
    We present a decomposition heuristic for a large class of job shop scheduling problems. This heuristic utilizes information from the linear programming formulation of the associated optimal timing problem to solve subproblems, can be used for any objective function whose associated optimal timing problem can be expressed as a linear program (LP), and is particularly effective for objectives that include a component that is a function of individual operation completion times. Using the proposed heuristic framework, we address job shop scheduling problems with a variety of objectives where intermediate holding costs need to be explicitly considered. In computational testing, we demonstrate the performance of our proposed solution approach

    Dynamic resource constrained multi-project scheduling problem with weighted earliness/tardiness costs

    Get PDF
    In this study, a conceptual framework is given for the dynamic multi-project scheduling problem with weighted earliness/tardiness costs (DRCMPSPWET) and a mathematical programming formulation of the problem is provided. In DRCMPSPWET, a project arrives on top of an existing project portfolio and a due date has to be quoted for the new project while minimizing the costs of schedule changes. The objective function consists of the weighted earliness tardiness costs of the activities of the existing projects in the current baseline schedule plus a term that increases linearly with the anticipated completion time of the new project. An iterated local search based approach is developed for large instances of this problem. In order to analyze the performance and behavior of the proposed method, a new multi-project data set is created by controlling the total number of activities, the due date tightness, the due date range, the number of resource types, and the completion time factor in an instance. A series of computational experiments are carried out to test the performance of the local search approach. Exact solutions are provided for the small instances. The results indicate that the local search heuristic performs well in terms of both solution quality and solution time

    Assembly job shop scheduling problems with component availability constraints.

    Get PDF
    Job shop scheduling has been widely studied for several decades. In generalized of the job shop scheduling problem, n jobs are to be processed on m machines under specific routings and due dates. The majority of job shop scheduling research concentrates on manufacturing environments processing string-type jobs with a linear routing where no assembly operations are involved. However, many manufacturing environments produce complex products with multi-level assembly job structures and cannot be scheduled efficiently with existing job shop scheduling techniques. Little research has been done in the area of assembly job shop scheduling, and we are not aware any of those studies consider on the availability of purchased components and the impact of component availability on the performance of assembly job shops. This research focuses on scheduling job shops that process jobs requiring multiple-levels of assembly and it also considers the availability of components that are procured from outside suppliers. By considering material constraints during production scheduling, manufacturers can increase resource utilization and improve due date performance.To represent assembly job shop scheduling problems with component availability constraints, a modified disjunctive graph formulation is developed in this research. A mixed-integer programming model with the objective of minimizing the total weighted-tardiness is also developed in this research. Several heuristic methods, described as modified shifting bottleneck procedure (MSBP), efficient shifting bottleneck procedure (ESBP) and rolling horizon procedure (RHP), are proposed to reduce the computational time required for assembly job shop scheduling problems. These methods are extended from the shifting bottleneck procedure. The performance of various flavors of the MSBP and ESBP is demonstrated on a set of test instances and compared with different dispatching rules that are widely used in practice. Results show that MSBP and ESBP outperform the dispatching rules by 18% to 16% on average.This dissertation not only studies the assembly job shop scheduling problem with component availability constraints, but also demonstrates how the decomposition methodology can reduce the complexity of NP-hard problems. Based on the relative preference of solution quality and computational time, recommendations for appropriate methods to solve assembly job shop scheduling problems with different problem sizes are given in the conclusions of this dissertation

    Train scheduling with application to the UK rail network

    No full text
    Nowadays, transforming the railway industry for better performance and making the best usage of the current capacity are the key issues in many countries. Operational research methods and in particular scheduling techniques have a substantial potential to offer algorithmic solutions to improve railway operation and control. This thesis looks at train scheduling and rescheduling problems in a microscopic level with regard to the track topology. All of the timetable components are fixed and we aim to minimize delay by considering a tardiness objective function and only allowing changes to the order and to the starting times of trains on blocks. Various operational and safety constraints should be considered. We have achieved further developments in the field including generalizations to the existing models in order to obtain a generic model that includes important additional constraints. We make use of the analogy between the train scheduling problem and job shop scheduling problem. The model is customized to the UK railway network and signaling system. Introduced solution methods are inspired by the successful results of the shifting bottleneck to solve the job shop scheduling problems. Several solution methods such as mathematical programming and different variants of the shifting bottleneck are investigated. The proposed methods are implemented on a real-world case study based on London Bridge area in the South East of the UK. It is a dense network of interconnected lines and complicated with regard to stations and junctions structure. Computational experiments show the efficiency and limitations of the mathematical programming model and one variant of the proposed shifting bottleneck algorithms. This study also addresses train routing and rerouting problems in a mesoscopic level regarding relaxing some of the detailed constraints. The aim is to make the best usage of routing options in the network to minimize delay propagation. In addition to train routes, train entry times and orders on track segment are defined. Hence, the routing and scheduling decisions are combined in the solutions arising from this problem. Train routing and rerouting problems are formulated as modified job shop problems to include the main safety and operational constraints. Novel shifting bottleneck algorithms are provided to solve the problem. Computational results are reported on the same case study based on London Bridge area and the results show the efficiency of one variant of the developed shifting bottleneck algorithms in terms of solution quality and runtime

    Flow shop scheduling with earliness, tardiness and intermediate inventory holding costs

    Get PDF
    We consider the problem of scheduling customer orders in a flow shop with the objective of minimizing the sum of tardiness, earliness (finished goods inventory holding) and intermediate (work-in-process) inventory holding costs. We formulate this problem as an integer program, and based on approximate solutions to two di erent, but closely related, Dantzig-Wolfe reformulations, we develop heuristics to minimize the total cost. We exploit the duality between Dantzig-Wolfe reformulation and Lagrangian relaxation to enhance our heuristics. This combined approach enables us to develop two di erent lower bounds on the optimal integer solution, together with intuitive approaches for obtaining near-optimal feasible integer solutions. To the best of our knowledge, this is the first paper that applies column generation to a scheduling problem with di erent types of strongly NP-hard pricing problems which are solved heuristically. The computational study demonstrates that our algorithms have a significant speed advantage over alternate methods, yield good lower bounds, and generate near-optimal feasible integer solutions for problem instances with many machines and a realistically large number of jobs

    A decomposition heuristics based on multi-bottleneck machines for large-scale job shop scheduling problems

    Get PDF
    Purpose: A decomposition heuristics based on multi-bottleneck machines for large-scale job shop scheduling problems (JSP) is proposed. Design/methodology/approach: In the algorithm, a number of sub-problems are constructed by iteratively decomposing the large-scale JSP according to the process route of each job. And then the solution of the large-scale JSP can be obtained by iteratively solving the sub-problems. In order to improve the sub-problems' solving efficiency and the solution quality, a detection method for multi-bottleneck machines based on critical path is proposed. Therewith the unscheduled operations can be decomposed into bottleneck operations and non-bottleneck operations. According to the principle of “Bottleneck leads the performance of the whole manufacturing system” in TOC (Theory Of Constraints), the bottleneck operations are scheduled by genetic algorithm for high solution quality, and the non-bottleneck operations are scheduled by dispatching rules for the improvement of the solving efficiency. Findings: In the process of the subproblems' construction, partial operations in the previous scheduled sub-problem are divided into the successive sub-problem for re-optimization. This strategy can improve the solution quality of the algorithm. In the process of solving the sub problems, the strategy that evaluating the chromosome's fitness by predicting the global scheduling objective value can improve the solution quality. Research limitations/implications: In this research, there are some assumptions which reduce the complexity of the large-scale scheduling problem. They are as follows: The processing route of each job is predetermined, and the processing time of each operation is fixed. There is no machine breakdown, and no preemption of the operations is allowed. The assumptions should be considered if the algorithm is used in the actual job shop. Originality/value: The research provides an efficient scheduling method for the large-scale job shops, and will be helpful for the discrete manufacturing industry for improving the production efficiency and effectiveness.Peer Reviewe

    A decomposition heuristics based on multi-bottleneck machines for large-scale job shop scheduling problems

    Get PDF
    Purpose: A decomposition heuristics based on multi-bottleneck machines for large-scale job shop scheduling problems (JSP) is proposed. Design/methodology/approach: In the algorithm, a number of sub-problems are constructed by iteratively decomposing the large-scale JSP according to the process route of each job. And then the solution of the large-scale JSP can be obtained by iteratively solving the sub-problems. In order to improve the sub-problems' solving efficiency and the solution quality, a detection method for multi-bottleneck machines based on critical path is proposed. Therewith the unscheduled operations can be decomposed into bottleneck operations and non-bottleneck operations. According to the principle of “Bottleneck leads the performance of the whole manufacturing system” in TOC (Theory Of Constraints), the bottleneck operations are scheduled by genetic algorithm for high solution quality, and the non-bottleneck operations are scheduled by dispatching rules for the improvement of the solving efficiency. Findings: In the process of the subproblems' construction, partial operations in the previous scheduled sub-problem are divided into the successive sub-problem for re-optimization. This strategy can improve the solution quality of the algorithm. In the process of solving the sub problems, the strategy that evaluating the chromosome's fitness by predicting the global scheduling objective value can improve the solution quality. Research limitations/implications: In this research, there are some assumptions which reduce the complexity of the large-scale scheduling problem. They are as follows: The processing route of each job is predetermined, and the processing time of each operation is fixed. There is no machine breakdown, and no preemption of the operations is allowed. The assumptions should be considered if the algorithm is used in the actual job shop. Originality/value: The research provides an efficient scheduling method for the large-scale job shops, and will be helpful for the discrete manufacturing industry for improving the production efficiency and effectiveness.Peer Reviewe

    Decentralized Scheduling of Discrete Production Systems with Limited Buffers

    Get PDF
    Die Steuerung der Produktion ist eine der Kernaufgaben eines jeden produzierenden Unternehmens. Sie ist insbesondere wichtig, um auf die Anforderungen des Marktes und damit auf die Wünsche der Kunden reagieren zu können. Aktuelle Trends im Markt führen dabei zu einer hochindividualisierten Produktion bei gleichzeitiger Erhöhung der produzierten Stückzahlen. Eine Konsequenz daraus ist, dass Unternehmen über flexiblere und agilere Produktionssysteme verfügen müssen, um auf die sich ständig ändernden Kundenwünsche reagieren zu können. Da starre Fertigungslinien nicht mehr geeignet sind, werden zunehmend komplexere Strukturen wie die der Werkstattfertigung oder Matrixproduktion eingesetzt. Hierfür werden geeignete Steuerungsmethoden für die Produktion benötigt. Diese Arbeit beschäftigt sich mit eben jenen Steuerungsmethoden, genauer gesagt Methoden zur Planung von Produktionsaufträgen in diesen neuen Produktionssystemen. Zur Steuerung eignen sich echtzeitfähige und autonome Entscheidungssysteme, mit denen die Steuerung der neuen Organisationsstruktur der Produktion angepasst ist. Agentenbasierte Systeme bieten genau diese Eigenschaften und erlauben es, komplexe Planungsaufgaben in kleinere Teilprobleme zu zerlegen, die schneller und genauer gelöst werden können. Sie erfordern die Verfügbarkeit von Daten in Echtzeit und eine schnelle Kommunikation zwischen den Agenten, was heute dank der vierten industriellen Revolution zur Verfügung steht. Demgegenüber steht der erhöhte Koordinierungsbedarf, der in diesen Systemen beherrscht werden muss. Das Ziel dieser Arbeit ist es, einen dezentralen Produktionsplanungs-Algorithmus zu entwickeln, der in einem Multi-Agenten-System implementiert ist. Er berücksichtigt begrenzte Verfügbarkeit von Pufferplätzen an jedem Arbeitsplatz, ein Thema, das in der Literatur wenig erforscht ist. Der Algorithmus ist in einer flexiblen Werkstattfertigung anwendbar und zeigt eine große Zeiteffizienz bei der Einplanung größerer Mengen von Aufträgen. Um dieses Ziel zu erreichen, wird zunächst der Produktionsplanungs-Algorithmus ohne das Agentensystem entworfen. Er basiert auf der von \textcite{adams1988} veröffentlichten Shifting Bottleneck Heuristik. Da viele Änderungen notwendig sind, um die geforderten Eigenschaften berücksichtigen zu können, bleibt nur die grundlegende Vorgehensweise gleich, während alle Schritte der Heuristik von Grund auf neu modelliert werden. Anschließend wird ein Multi-Agenten-System entworfen, das die genannten Anforderungen abbildet und den Algorithmus zur Planung verwendet. In diesem System hat jeder Arbeitsplatz einen Arbeitsplatzagenten, der für die Planung und Steuerung seines zugeordneten Arbeitsplatzes zuständig ist, sowie einige zusätzliche Agenten für die Kommunikation, die Datenspeicherung und allgemeine Aufgaben. Der entworfene Algorithmus wird angepasst und in das Multi-Agenten-System implementiert. Da das System im praktischen Einsatz immer eine Lösung finden muss, stellen wir mögliche Fehlerfälle vor und wie mit ihnen umgegangen wird. Abschließend findet eine numerische Evaluierung mit zwei realen Produktionssystemen statt. Da sich diese Systeme in einem wichtigen Merkmal ähneln, werden weitere zufällig erzeugte Beispiele getestet und ausgewertet

    Makespan Minimization in Re-entrant Permutation Flow Shops

    Get PDF
    Re-entrant permutation flow shop problems occur in practical applications such as wafer manufacturing, paint shops, mold and die processes and textile industry. A re-entrant material flow means that the production jobs need to visit at least one working station multiple times. A comprehensive review gives an overview of the literature on re-entrant scheduling. The influence of missing operations received just little attention so far and splitting the jobs into sublots was not examined in re-entrant permutation flow shops before. The computational complexity of makespan minimization in re-entrant permutation flow shop problems requires heuristic solution approaches for large problem sizes. The problem provides promising structural properties for the application of a variable neighborhood search because of the repeated processing of jobs on several machines. Furthermore the different characteristics of lot streaming and their impact on the makespan of a schedule are examined in this thesis and the heuristic solution methods are adjusted to manage the problem’s extension