5 research outputs found

    A new innovative cooling law for simulated annealing algorithms

    Get PDF
    The present paper proposes an original and innovative cooling law in the field of Simulated Annealing (SA) algorithms. Particularly, such a law is based on the evolution of different initial seeds on which the algorithm works in parallel. The efficiency control of the new proposal, executed on problems of different kind, shows that the convergence quickness by using such a new cooling law is considerably greater than that obtained by traditional laws. Furthermore, it is shown that the effectiveness of the SA algorithm arising from the proposed cooling law is independent of the problem type. This last feature reduces the number of parameters to be initially fixed, so simplifying the preliminary calibration process necessary to optimize the algorithm efficiency

    Pengembangan Model Optimasi Closed Loop Supply Chain untuk Multi Produk Menggunakan Fuzzy Goal Programming

    Get PDF
    Pada saat ini, kompetisi di dunia industri semakin meningkat, diperlukan kerja sama dan koordinasi seluruh bagian dari rantai supply chain, oleh karena itu diperlukan closed loop supply chain. Penelitian ini dimulai dengan melakukan uji coba pada model awal. Model awal terdiri dari 5 eselon yaitu pusat inspeksi, pusat distribusi, pusat disposal, pusat recovery dan retail. Pada model awal tidak terdapat forward supply chain, armada, dan hanya terdiri dari satu periode serta satu jenis produk. Total biaya pada model awal sebesar Rp 631.630.900.000,00. Model usulan 1 terdiri dari 7 eselon, armada, inventory, multi produk, dan multi periode namun masih single objective. Total biaya model usulan 1 sebesar Rp 261.780.200.000,00 dimana total biaya terdiri dari fixed cost dan variable cost setiap eselon, biaya inventory, biaya pesan, biaya bahan baku, dan biaya armada. Sedangkan nilai service level pada model usulan 1 sebesar 80%. Model usulan 2 sama dengan model usulan 1 namun pada fungsi tujuan ditambahkan maksimasi service level. Model usulan 2 ini diselesaikan menggunakan metode Fuzzy Goal Programming. Hasil perhitungan model usulan 2 untuk minimasi total biaya sebesar Rp 262.568.600.000,00 dan untuk maksimasi service level sebesar 95,55%. Pada analisa sensitivitas diketahui tidak adanya parameter yang berpengaruh terhadap fungsi tujuan

    Full Issue

    Get PDF

    Multi-objective optimisation under deep uncertainty

    Get PDF
    Most of the decisions in real-life problems need to be made in the absence of complete knowledge about the consequences of the decision. Furthermore, in some of these problems, the probability and/or the number of different outcomes are also unknown (named deep uncertainty). Therefore, all the probability-based approaches (such as stochastic programming) are unable to address these problems. On the other hand, involving various stakeholders with different (possibly conflicting) criteria in the problems brings additional complexity. The main aim and primary motivation for writing this thesis have been to deal with deep uncertainty in Multi-Criteria Decision-Making (MCDM) problems, especially with long-term decision-making processes such as strategic planning problems. To achieve these aims, we first introduced a two-stage scenario-based structure for dealing with deep uncertainty in Multi-Objective Optimisation (MOO)/MCDM problems. The proposed method extends the concept of two-stage stochastic programming with recourse to address the capability of dealing with deep uncertainty through the use of scenario planning rather than statistical expectation. In this research, scenarios are used as a dimension of preference (a component of what we term the meta-criteria) to avoid problems relating to the assessment and use of probabilities under deep uncertainty. Such scenario-based thinking involved a multi-objective representation of performance under different future conditions as an alternative to expectation, which fitted naturally into the broader multi-objective problem context. To aggregate these objectives of the problem, the Generalised Goal Programming (GGP) approach is used. Due to the capability of this approach to handle large numbers of objective functions/criteria, the GGP is significantly useful in the proposed framework. Identifying the goals for each criterion is the only action that the Decision Maker (DM) needs to take without needing to investigate the trade-offs between different criteria. Moreover, the proposed two-stage framework has been expanded to a three-stage structure and a moving horizon concept to handle the existing deep uncertainty in more complex problems, such as strategic planning. As strategic planning problems will deal with more than two stages and real processes are continuous, it follows that more scenarios will continuously be unfolded that may or may not be periodic. "Stages", in this study, are artificial constructs to structure thinking of an indefinite future. A suitable length of the planning window and stages in the proposed methodology are also investigated. Philosophically, the proposed two-stage structure always plans and looks one step ahead while the three-stage structure considers the conditions and consequences of two upcoming steps in advance, which fits well with our primary objective. Ignoring long-term consequences of decisions as well as likely conditions could not be a robust strategic approach. Therefore, generally, by utilising the three-stage structure, we may expect a more robust decision than with a two-stage representation. Modelling time preferences in multi-stage problems have also been introduced to solve the fundamental problem of comparability of the two proposed methodologies because of the different time horizon, as the two-stage model is ignorant of the third stage. This concept has been applied by a differential weighting in models. Importance weights, then, are primarily used to make the two- and three-stage models more directly comparable, and only secondarily as a measure of risk preference. Differential weighting can help us apply further preferences in the model and lead it to generate more preferred solutions. Expanding the proposed structure to the problems with more than three stages which usually have too many meta-scenarios may lead us to a computationally expensive model that cannot easily be solved, if it all. Moreover, extension to a planning horizon that too long will not result in an exact plan, as nothing in nature is predictable to this level of detail, and we are always surprised by new events. Therefore, beyond the expensive computation in a multi-stage structure for more than three stages, defining plausible scenarios for far stages is not logical and even impossible. Therefore, the moving horizon models in a T-stage planning window has been introduced. To be able to run and evaluate the proposed two- and three-stage moving horizon frameworks in longer planning horizons, we need to identify all plausible meta-scenarios. However, with the assumption of deep uncertainty, this identification is almost impossible. On the other hand, even with a finite set of plausible meta-scenarios, comparing and computing the results in all plausible meta-scenarios are hardly possible, because the size of the model grows exponentially by raising the length of the planning horizon. Furthermore, analysis of the solutions requires hundreds or thousands of multi-objective comparisons that are not easily conceivable, if it all. These issues motivated us to perform a Simulation-Optimisation study to simulate the reasonable number of meta-scenarios and enable evaluation, comparison and analysis of the proposed methods for the problems with a T-stage planning horizon. In this Simulation-Optimisation study, we started by setting the current scenario, the scenario that we were facing it at the beginning of the period. Then, the optimisation model was run to get the first-stage decisions which can implement immediately. Thereafter, the next scenario was randomly generated by using Monte Carlo simulation methods. In deep uncertainty, we do not have enough knowledge about the likelihood of plausible scenarios nor the probability space; therefore, to simulate the deep uncertainty we shall not use anything of scenario likelihoods in the decision models. The two- and three-stage Simulation-Optimisation algorithms were also proposed. A comparison of these algorithms showed that the solutions to the two-stage moving horizon model are feasible to the other pattern (three-stage). Also, the optimal solution to the three-stage moving horizon model is not dominated by any solutions of the other model. So, with no doubt, it must find better, or at least the same, goal achievement compared to the two-stage moving horizon model. Accordingly, the three-stage moving horizon model evaluates and compares the optimal solution of the corresponding two-stage moving horizon model to the other feasible solutions, then, if it selects anything else it must either be better in goal achievement or be robust in some future scenarios or a combination of both. However, the cost of these supremacies must be considered (as it may lead us to a computationally expensive problem), and the efficiency of applying this structure needs to be approved. Obviously, using the three-stage structure in comparison with the two-stage approach brings more complexity and calculations to the models. It is also shown that the solutions to the three-stage model would be preferred to the solutions provided by the two-stage model under most circumstances. However, by the "efficiency" of the three-stage framework in our context, we want to know that whether utilising this approach and its solutions is worth the expense of the additional complexity and computation. The experiments in this study showed that the three-stage model has advantages under most circumstances(meta-scenarios), but that the gains are quite modest. This issue is frequently observed when comparing these methods in problems with a short-term (say less than five stages) planning window. Nevertheless, analysis of the length of the planning horizon and its effects on the solutions to the proposed frameworks indicate that utilising the three-stage models is more efficient for longer periods because the differences between the solutions of the two proposed structures increase by any iteration of the algorithms in moving horizon models. Moreover, during the long-term calculations, we noticed that the two-stage algorithm failed to find the optimal solutions for some iterations while the three-stage algorithm found the optimal value in all cases. Thus, it seems that for the planning horizons with more than ten stages, the efficiency of the three-stage model be may worth the expenses of the complexity and computation. Nevertheless, if the DM prefers to not use the three-stage structure because of the complexity and/or calculations, the two-stage moving horizon model can provide us with some reasonable solutions, although they might not be as good as the solutions generated by a three-stage framework. Finally, to examine the power of the proposed methodology in real cases, the proposed two-stage structure was applied in the sugarcane industry to analyse the whole infrastructure of the sugar and bioethanol Supply Chain (SC) in such a way that all economics (Max profit), environmental (Min CO₂), and social benefits (Max job-creations) were optimised under six key uncertainties, namely sugarcane yield, ethanol and refined sugar demands and prices, and the exchange rate. Moreover, one of the critical design questions - that is, to design the optimal number and technologies as well as the best place(s) for setting up the ethanol plant(s) - was also addressed in this study. The general model for the strategic planning of sugar- bioethanol supply chains (SC) under deep uncertainty was formulated and also examined in a case study based on the South African Sugar Industry. This problem is formulated as a Scenario-Based Mixed-Integer Two-Stage Multi-Objective Optimisation problem and solved by utilising the Generalised Goal Programming Approach. To sum up, the proposed methodology is, to the best of our knowledge, a novel approach that can successfully handle the deep uncertainty in MCDM/MOO problems with both short- and long-term planning horizons. It is generic enough to use in all MCDM problems under deep uncertainty. However, in this thesis, the proposed structure only applied in Linear Problems (LP). Non-linear problems would be an important direction for future research. Different solution methods may also need to be examined to solve the non-linear problems. Moreover, many other real-world optimisation and decision-making applications can be considered to examine the proposed method in the future
    corecore