64,658 research outputs found

    Leading methods for promoting finished product quality

    Get PDF
    Modern promising theoretical and methodological studies have reasonably shown that the issue of bonuses significance in the production and economic mechanism is not controversial. Currently, an order has been established where economic incentive funds are formed according to fixed standards, approved in differentiated amounts by year of economic development cycle; the main fund-forming indicators are performance to the supply plan of finished products under the concluded contracts, increase in labour productivity, improvement of finished product quality and volume growth net profit. The introduction of long-term wage standards for the hryvnia finished product strengthens the economic interest of labour collectives in increasing labour productivity and reducing staff turnover, improving the procedure of material incentives for combining professions, high rates and criteria for evaluating quality in labour, introducing technologically founded standards. This paper focuses on the issue of assessing and determining leading methods for promoting finished product quality. We employ both theoretical and empirical tools for achieving this goal and for deriving relevant outcomes and policy implications

    Leachate treatment by conventional coagulation, electrocoagulation and two-stage coagulation (conventional coagulation and electrocoagulation)

    Get PDF
    Leachate is widely explored and investigated due to highly polluted and difficult to treat. Leachate treatment commonly involves advanced, complicated and high cost activities. Conventional coagulation is widely used in the treatment of wastewater but the sludge production becomes the biggest constraint in this treatment. Electrocoagulation is an alternative to conventional method because it has the same application but produce less sludge and requires simple equipment. Thus, combination of conventional coagulation and electrocoagulation can improve the efficiency of coagulation process in leachate treatment. This article is focusing on the efficiency of single and combined treatment as well as the improvement made by combined treatment. Based on review, the percentage reduction of current density and dose of coagulant was perceptible. As much 50% reduction of current density, duration of treatment, and dose of coagulant able to be obtained by using combined treatment. This combined treatment is able to reduce the cost and at the same time reduce the duration of treatment. Hence, the combined treatment offers an alternative technique for landfill leachate treatment on the removal of pollutants

    Software development: A paradigm for the future

    Get PDF
    A new paradigm for software development that treats software development as an experimental activity is presented. It provides built-in mechanisms for learning how to develop software better and reusing previous experience in the forms of knowledge, processes, and products. It uses models and measures to aid in the tasks of characterization, evaluation and motivation. An organization scheme is proposed for separating the project-specific focus from the organization's learning and reuse focuses of software development. The implications of this approach for corporations, research and education are discussed and some research activities currently underway at the University of Maryland that support this approach are presented

    Applying value stream mapping to reduce food losses in supply chains : a systematic review

    Get PDF

    Are Delayed Issues Harder to Resolve? Revisiting Cost-to-Fix of Defects throughout the Lifecycle

    Full text link
    Many practitioners and academics believe in a delayed issue effect (DIE); i.e. the longer an issue lingers in the system, the more effort it requires to resolve. This belief is often used to justify major investments in new development processes that promise to retire more issues sooner. This paper tests for the delayed issue effect in 171 software projects conducted around the world in the period from 2006--2014. To the best of our knowledge, this is the largest study yet published on this effect. We found no evidence for the delayed issue effect; i.e. the effort to resolve issues in a later phase was not consistently or substantially greater than when issues were resolved soon after their introduction. This paper documents the above study and explores reasons for this mismatch between this common rule of thumb and empirical data. In summary, DIE is not some constant across all projects. Rather, DIE might be an historical relic that occurs intermittently only in certain kinds of projects. This is a significant result since it predicts that new development processes that promise to faster retire more issues will not have a guaranteed return on investment (depending on the context where applied), and that a long-held truth in software engineering should not be considered a global truism.Comment: 31 pages. Accepted with minor revisions to Journal of Empirical Software Engineering. Keywords: software economics, phase delay, cost to fi

    Implementation of Software Process Improvement Through TSPi in Very Small Enterprises

    Get PDF
    This article shows an experience in a very small enterprise related to improving software quality in terms of test and process productivity. A customized process from the current organizational process based on TSPi was defined and the team was trained on it. The pilot project had schedule and budget constraints. The process began by gathering historical data from previous projects in order to get a measurement repository. Then the project was launched and some metrics were collected. Finally, results were analyzed and the improvements verified
    • 

    corecore