11,833 research outputs found
Dynamic scheduling in a multi-product manufacturing system
To remain competitive in global marketplace, manufacturing companies need to improve their operational practices. One of the methods to increase competitiveness in manufacturing is by implementing proper scheduling system. This is important to enable job orders to be completed on time, minimize waiting time and maximize utilization of equipment and machineries. The dynamics of real manufacturing system are very complex in nature. Schedules developed based on deterministic algorithms are unable to effectively deal with uncertainties in demand and capacity. Significant differences can be found between planned schedules and actual schedule implementation. This study attempted to develop a scheduling system that is able to react quickly and reliably for accommodating changes in product demand and manufacturing capacity. A case study, 6 by 6 job shop scheduling problem was adapted with uncertainty elements added to the data sets. A simulation model was designed and implemented using ARENA simulation package to generate various job shop scheduling scenarios. Their performances were evaluated using scheduling rules, namely, first-in-first-out (FIFO), earliest due date (EDD), and shortest processing time (SPT). An artificial neural network (ANN) model was developed and trained using various scheduling scenarios generated by ARENA simulation. The experimental results suggest that the ANN scheduling model can provided moderately reliable prediction results for limited scenarios when predicting the number completed jobs, maximum flowtime, average machine utilization, and average length of queue. This study has provided better understanding on the effects of changes in demand and capacity on the job shop schedules. Areas for further study includes: (i) Fine tune the proposed ANN scheduling model (ii) Consider more variety of job shop environment (iii) Incorporate an expert system for interpretation of results. The theoretical framework proposed in this study can be used as a basis for further investigation
AI and OR in management of operations: history and trends
The last decade has seen a considerable growth in the use of Artificial Intelligence (AI) for operations management with the aim of finding solutions to problems that are increasing in complexity and scale. This paper begins by setting the context for the survey through a historical perspective of OR and AI. An extensive survey of applications of AI techniques for operations management, covering a total of over 1200 papers published from 1995 to 2004 is then presented. The survey utilizes Elsevier's ScienceDirect database as a source. Hence, the survey may not cover all the relevant journals but includes a sufficiently wide range of publications to make it representative of the research in the field. The papers are categorized into four areas of operations management: (a) design, (b) scheduling, (c) process planning and control and (d) quality, maintenance and fault diagnosis. Each of the four areas is categorized in terms of the AI techniques used: genetic algorithms, case-based reasoning, knowledge-based systems, fuzzy logic and hybrid techniques. The trends over the last decade are identified, discussed with respect to expected trends and directions for future work suggested
Human-Machine Collaborative Optimization via Apprenticeship Scheduling
Coordinating agents to complete a set of tasks with intercoupled temporal and
resource constraints is computationally challenging, yet human domain experts
can solve these difficult scheduling problems using paradigms learned through
years of apprenticeship. A process for manually codifying this domain knowledge
within a computational framework is necessary to scale beyond the
``single-expert, single-trainee" apprenticeship model. However, human domain
experts often have difficulty describing their decision-making processes,
causing the codification of this knowledge to become laborious. We propose a
new approach for capturing domain-expert heuristics through a pairwise ranking
formulation. Our approach is model-free and does not require enumerating or
iterating through a large state space. We empirically demonstrate that this
approach accurately learns multifaceted heuristics on a synthetic data set
incorporating job-shop scheduling and vehicle routing problems, as well as on
two real-world data sets consisting of demonstrations of experts solving a
weapon-to-target assignment problem and a hospital resource allocation problem.
We also demonstrate that policies learned from human scheduling demonstration
via apprenticeship learning can substantially improve the efficiency of a
branch-and-bound search for an optimal schedule. We employ this human-machine
collaborative optimization technique on a variant of the weapon-to-target
assignment problem. We demonstrate that this technique generates solutions
substantially superior to those produced by human domain experts at a rate up
to 9.5 times faster than an optimization approach and can be applied to
optimally solve problems twice as complex as those solved by a human
demonstrator.Comment: Portions of this paper were published in the Proceedings of the
International Joint Conference on Artificial Intelligence (IJCAI) in 2016 and
in the Proceedings of Robotics: Science and Systems (RSS) in 2016. The paper
consists of 50 pages with 11 figures and 4 table
Development of a Rule-Based Finite Capacity Scheduling System
This paper discusses the use of the finite capacity planning model as a basis for a job-shop
scheduling system. The suitability of this approach for constructing short term schedules
with very short lead times is examined. This paper introduces a rule-based scheduling
system whose operation, unlike previous monolithic schedulers, is based around distinct
though interlinked processes. Scheduling herein is defined as the selection of a set of orders
for manufacture, and the allocation of processing time to each on an acyclic network of
processing resources. The objectives are, firstly, compliance with all customer deadlines
and, secondly, the efficient utilisation of available machine time and prevailing machine
setups
Applying performance measures to support decision-making in supply chain operations: a case of beverage industry
Performance measurement systems (PMS) have commonly been applied to evaluate and reward performances at
managerial levels, especially in the context of supply chain management. However, evidence suggests that the effective
use of PMS can also positively influence the behaviour and improve performance at an operational level. The motivation
is to accomplish organisational goals, namely to increase supply chain flexibility by responding to evermore-varying customer
demands in a timely manner. The purpose of the study described in this paper was to develop a conceptual framework
that adopts performance measures for ex-ante decision-making at an operational level within the supply chain. To
guide the research, five questions were asked and subsequently key gaps have been identified. In an attempt to fill the
gaps, a case study at a major global brand beverage company has been carried out, and as a result, a conceptual framework
of the PMS has been developed. Overall, the research offers a foundation of the applicability and impact of PMS
in the supply chain and provides a framework that attends to some of the potential uses of PMS that so far have not
been practically applied. The outcomes from the testing indicate that the initial gaps identified in the literature have been
addressed and that the framework is judicious with scope for practical applicability. The framework is deemed worthy of
further testing in different operational contexts of the supply chain
Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning
The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques
- …