169 research outputs found

    Some scheduling problems with deteriorating jobs and learning effects

    Get PDF
    Author name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    An iterated greedy heuristic for no-wait flow shops with sequence dependent setup times, learning and forgetting effects

    Full text link
    [EN] This paper addresses a sequence dependent setup times no-wait flowshop with learning and forgetting effects to minimize total flowtime. This problem is NP-hard and has never been considered before. A position-based learning and forgetting effects model is constructed. Processing times of operations change with the positions of corresponding jobs in a schedule. Objective increment properties are deduced and based on them three accelerated neighbourhood construction heuristics are presented. Because of the simplicity and excellent performance shown in flowshop scheduling problems, an iterated greedy heuristic is proposed. The proposed iterated greedy algorithm is compared with some existing algorithms for related problems on benchmark instances. Comprehensive computational and statistical tests show that the presented method obtains the best performance among the compared methods. (C) 2018 Elsevier Inc. All rights reserved.This work is supported by the National Natural Science Foundation of China (Nos. 61572127, 61272377), the Collaborative Innovation Center of Wireless Communications Technology and the Key Natural Science Fund for Colleges and Universities in Jiangsu Province (No. 12KJA630001). Ruben Ruiz is partially supported by the Spanish Ministry of Economy and Competitiveness(MINECO), under the project "SCHEYARD - Optimization of Scheduling Problems in Container Yards" with reference DPI2015-65895-R.Li, X.; Yang, Z.; Ruiz García, R.; Chen, T.; Sui, S. (2018). An iterated greedy heuristic for no-wait flow shops with sequence dependent setup times, learning and forgetting effects. Information Sciences. 453:408-425. https://doi.org/10.1016/j.ins.2018.04.038S40842545

    Scheduling problems with the effects of deterioration and learning

    Get PDF
    Author name used in this publication: T. C. E. Cheng2006-2007 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Deterministic Assembly Scheduling Problems: A Review and Classification of Concurrent-Type Scheduling Models and Solution Procedures

    Get PDF
    Many activities in industry and services require the scheduling of tasks that can be concurrently executed, the most clear example being perhaps the assembly of products carried out in manufacturing. Although numerous scientific contributions have been produced on this area over the last decades, the wide extension of the problems covered and the lack of a unified approach have lead to a situation where the state of the art in the field is unclear, which in turn hinders new research and makes translating the scientific knowledge into practice difficult. In this paper we propose a unified notation for assembly scheduling models that encompass all concurrent-type scheduling problems. Using this notation, the existing contributions are reviewed and classified into a single framework, so a comprehensive, unified picture of the field is obtained. In addition, a number of conclusions regarding the state of the art in the topic are presented, as well as some opportunities for future research.Ministerio de Ciencia e Innovación español DPI2016-80750-

    Flowshop with additional resources during setups: Mathematical models and a GRASP algorithm

    Full text link
    [EN] Machine scheduling problems arise in many production processes, and are something that needs to be consider when optimizing the supply chain. Among them, flowshop scheduling problems happen when a number of jobs have to be sequentially processed by a number of machines. This paper addressees, for the first time, the Permutation Flowshop Scheduling problem with additional Resources during Setups (PFSR-S). In this problem, in addition to the standard permutation flowshop constraints, each machine requires a setup between the processing of two consecutive jobs. A number of additional and scarce resources, e.g. operators, are needed to carry out each setup. Two Mixed Integer Linear Programming formulations and an exact algorithm are proposed to solve the PFSR-S. Due to its complexity, these approaches can only solve instances of small size to optimality. Therefore, a GRASP metaheuristic is also proposed which provides solutions for much larger instances. All the methods designed for the PFSR-S in this paper are computationally tested over a benchmark of instances adapted from the literature. The results obtained show that the GRASP metaheuristic finds good quality solutions in short computational times.Juan C. Yepes-Borrero acknowledges financial support by Colfuturo under program Credito-Beca grant number 201503877 and from ElInstituto Colombiano de Credito Educativo y Estudios Tecnicos en el Exterior - ICETEX under program Pasaporte a la ciencia - Doctor-ado, Foco-reto pais 4.2.3, grant number 3568118. This research hasbeen partially supported by the Agencia Estatal de Investigacion (AEI)and the European Regional Development's fund (ERDF): PID2020-114594GB-C21; Regional Government of Andalusia: projects FEDER-US-1256951, AT 21_00032, and P18-FR-1422; Fundacion BBVA: project Netmeet Data (Ayudas Fundacion BBVA a equipos de investigacioncientifica 2019). The authors are partially supported by Agencia Valenciana de la Innovacion (AVI) under the project ireves (innovacionen vehiculos de emergencia sanitaria): una herramienta inteligente dedecision'' (No. INNACC/2021/26) partially financed with FEDER funds(interested readers can visit http://ireves.upv.es), and by the Spanish Ministry of Science and Innovation under the project OPRES-RealisticOptimization in Problems in Public Health'' (No. PID2021-124975OB-I00), partially financed with FEDER funds. Part of the authors aresupported by the Faculty of Business Administration and Managementat Universitat Politecnica de ValenciaYepes-Borrero, JC.; Perea, F.; Villa Juliá, MF.; Vallada Regalado, E. (2023). Flowshop with additional resources during setups: Mathematical models and a GRASP algorithm. Computers & Operations Research. 154. https://doi.org/10.1016/j.cor.2023.10619215

    Serial-batch scheduling – the special case of laser-cutting machines

    Get PDF
    The dissertation deals with a problem in the field of short-term production planning, namely the scheduling of laser-cutting machines. The object of decision is the grouping of production orders (batching) and the sequencing of these order groups on one or more machines (scheduling). This problem is also known in the literature as "batch scheduling problem" and belongs to the class of combinatorial optimization problems due to the interdependencies between the batching and the scheduling decisions. The concepts and methods used are mainly from production planning, operations research and machine learning
    corecore