15,291 research outputs found

    Requirements to Testing of Power System Services Provided by DER Units

    Get PDF
    The present report forms the Project Deliverable ‘D 2.2’ of the DERlab NoE project, supported by the EC under Contract No. SES6-CT-518299 NoE DERlab. The present document discuss the power system services that may be provided from DER units and the related methods to test the services actually provided, both at component level and at system level

    Meeting the Modeling Needs of Future Energy Systems

    Get PDF

    Policy analysis of electricity demand flexibility

    Get PDF

    Europe’s Electricity Supply Security: Strengthening the Chain. CEPS Policy Brief No. 224/November 2010

    Get PDF
    Acknowledging that efficient development of electricity transmission infrastructure is crucial to achieving EU targets for a secure, competitive and sustainable electricity supply, this paper explores ways of strengthening the supply chain. Research for the paper was carried out in the context of the SECURE project (Security of Energy Considering its Uncertainties, Risks and Economic Implications), funded by the European Commission under the Seventh Framework Programme. The project develops appropriate tools for evaluating the vulnerability of the EU to the different energy supply risks, and for promoting the optimisation of EU energy insecurity mitigation strategies, including investment, demand side management and dialogue with producing countries

    Opening of Ancillary Service Markets to Distributed Energy Resources: A Review

    Get PDF
    Electric power systems are moving toward more decentralized models, where energy generation is performed by small and distributed power plants, often from renewables. With the gradual phase out from fossil fuels, however, Distribution Energy Resources (DERs) are expected to take over in the provision of all regulation services required to operate the grid. To this purpose, the opening of national Ancillary Service Markets (ASMs) to DERs is considered an essential passage. In order to allow this transition to happen, current opportunities and barriers to market participation of DERs must be clearly identified. In this work, a comprehensive review is provided of the state-of-the-art of research on DER integration into ASMs. The topic at hand is analyzed from different perspectives. First, the current situation and main trends regarding the reformation processes of national ASMs are analyzed to get a clear picture of the evolutions expected and adjustment required in the future, according to the scientific community. Then, the focus is moved to the strategies to be adopted by aggregators for the effective control and coordination of DERs, exploring the challenges posed by the uncertainties affecting the problem. Coordination schemes between transmission and distribution system operators, and the implications on the grid infrastructure operation and planning, are also investigated. Finally, the review deepens the control capabilities required for DER technologies to perform the needed control actions

    The role of the reactor size for an investment in the nuclear sector: an evaluation of not-financial parameters

    Get PDF
    The literature presents many studies about the economics of new Nuclear Power Plants (NPPs). Such studies are based on Discounted Cash Flow (DCF) methods encompassing the accounts related to Construction, Operation & Maintenance, Fuel and Decommissioning. However the investment evaluation of a nuclear reactor should also include not-financial factors such as siting and grid constraints, impact on the national industrial system, etc. The Integrated model for the Competitiveness Assessment of SMRs (INCAS), developed by Politecnico di Milano cooperating with the IAEA, is designed to analyze the choice of the better Nuclear Power Plant size as a multidimensional problem. In particular the INCAS’s module “External Factors” evaluates the impact of the factors that are not considered in the traditional DCF methods. This paper presents a list of these factors, providing, for each one, the rationale and the quantification procedure; then each factor is quantified for the Italian case. The IRIS reactor has been chosen as SMR representative. The approach and the framework of the model can be applied to worldwide countries while the specific results apply to most of the European countries. The results show that SMRs have better performances than LRs with respect to the external factors, in general and in the Italian scenario in particular

    Flexible Transmission Network Planning Considering the Impacts of Distributed Generation

    Get PDF
    The restructuring of global power industries has introduced a number of challenges, such as conflicting planning objectives and increasing uncertainties,to transmission network planners. During the recent past, a number of distributed generation technologies also reached a stage allowing large scale implementation, which will profoundly influence the power industry, as well as the practice of transmission network expansion. In the new market environment, new approaches are needed to meet the above challenges. In this paper, a market simulation based method is employed to assess the economical attractiveness of different generation technologies, based on which future scenarios of generation expansion can be formed. A multi-objective optimization model for transmission expansion planning is then presented. A novel approach is proposed to select transmission expansion plans that are flexible given the uncertainties of generation expansion, system load and other market variables. Comprehensive case studies will be conducted to investigate the performance of our approach. In addition, the proposed method will be employed to study the impacts of distributed generation, especially on transmission expansion planning.
    • …
    corecore