1,893 research outputs found

    Framework for sustainable TVET-Teacher Education Program in Malaysia Public Universities

    Get PDF
    Studies had stated that less attention was given to the education aspect, such as teaching and learning in planning for improving the TVET system. Due to the 21st Century context, the current paradigm of teaching for the TVET educators also has been reported to be fatal and need to be shifted. All these disadvantages reported hindering the country from achieving the 5th strategy in the Strategic Plan for Vocational Education Transformation to transform TVET system as a whole. Therefore, this study aims to develop a framework for sustainable TVET Teacher Education program in Malaysia. This study had adopted an Exploratory Sequential Mix-Method design, which involves a semi-structured interview (phase one) and survey method (phase two). Nine experts had involved in phase one chosen by using Purposive Sampling Technique. As in phase two, 118 TVET-TE program lecturers were selected as the survey sample chosen through random sampling method. After data analysis in phase one (thematic analysis) and phase two (Principal Component Analysis), eight domains and 22 elements have been identified for the framework for sustainable TVET-TE program in Malaysia. This framework was identified to embed the elements of 21st Century Education, thus filling the gap in this research. The research findings also indicate that the developed framework was unidimensional and valid for the development and research regarding TVET-TE program in Malaysia. Lastly, it is in the hope that this research can be a guide for the nations in producing a quality TVET teacher in the future

    Scheduling theory since 1981: an annotated bibliography

    Get PDF

    A Simple, Practical Prioritization Scheme for a Job Shop Processing Multiple Job Types

    Get PDF
    The maintenance, repair, and overhaul (MRO) process is used to recondition equipment in the railroad, off-shore drilling, aircraft, and shipping industries. In the typical MRO process, the equipment is disassembled into component parts and these parts are routed to back-shops for repair. Repaired parts are returned for reassembling the equipment. Scheduling the back-shop for smooth flow often requires prioritizing the repair of component parts from different original assemblies at different machines. To enable such prioritization, we model the back-shop as a multi-class queueing network with a ConWIP execution system and introduce a new priority scheme to maximize the system performance. In this scheme, we identify the bottleneck machine based on overall workload and classify machines into two categories: the bottleneck machine and the non-bottleneck machine(s). Assemblies with the lowest cycle time receive the highest priority on the bottleneck machine and the lowest priority on non-bottleneck machine(s). Our experimental results show that this priority scheme increases the system performance by lowering the average cycle times without adversely impacting the total throughput. The contribution of this thesis consists primarily of three parts. First, we develop a simple priority scheme for multi-class, multi-server, ConWIP queueing systems with the disassembly/reassembly feature so that schedulers for a job-shop environment would be able to know which part should be given priority, in what order and where. Next, we provide an exact analytical solution to a two-class, two-server closed queueing model with mixed non-preemptive priority scheme. The queueing network model we study has not been analyzed in the literature, and there are no existing models that address the underlying problem of deciding prioritization by job types to maximize the system performance. Finally, we explore conditions under which the non-preemptive priority discipline can be approximated by a preemptive priority discipline

    Hybrid job shop scheduling

    Get PDF
    We consider the problem of scheduling jobs in a hybrid job shop. We use the term\ud 'hybrid' to indicate that we consider a lot of extensions of the classic job shop, such as transportation times, multiple resources, and setup times. The Shifting Bottleneck procedure can be generalized to deal with those extensions. We test this approach for an assembly shop. In this shop, we study the influence of static and dynamic scheduling, setup times, batch sizes, and the arrival process of the jobs

    Iterative repair for scheduling and rescheduling

    Get PDF
    An iterative repair search method is described called constraint based simulated annealing. Simulated annealing is a hill climbing search technique capable of escaping local minima. The utility of the constraint based framework is shown by comparing search performance with and without the constraint framework on a suite of randomly generated problems. Results are also shown of applying the technique to the NASA Space Shuttle ground processing problem. These experiments show that the search methods scales to complex, real world problems and reflects interesting anytime behavior

    A survey of variants and extensions of the resource-constrained project scheduling problem

    Get PDF
    The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized. It has become a well-known standard problem in the context of project scheduling which has attracted numerous researchers who developed both exact and heuristic scheduling procedures. However, it is a rather basic model with assumptions that are too restrictive for many practical applications. Consequently, various extensions of the basic RCPSP have been developed. This paper gives an overview over these extensions. The extensions are classified according to the structure of the RCPSP. We summarize generalizations of the activity concept, of the precedence relations and of the resource constraints. Alternative objectives and approaches for scheduling multiple projects are discussed as well. In addition to popular variants and extensions such as multiple modes, minimal and maximal time lags, and net present value-based objectives, the paper also provides a survey of many less known concepts. --project scheduling,modeling,resource constraints,temporal constraints,networks

    Scheduling MapReduce Jobs under Multi-Round Precedences

    Full text link
    We consider non-preemptive scheduling of MapReduce jobs with multiple tasks in the practical scenario where each job requires several map-reduce rounds. We seek to minimize the average weighted completion time and consider scheduling on identical and unrelated parallel processors. For identical processors, we present LP-based O(1)-approximation algorithms. For unrelated processors, the approximation ratio naturally depends on the maximum number of rounds of any job. Since the number of rounds per job in typical MapReduce algorithms is a small constant, our scheduling algorithms achieve a small approximation ratio in practice. For the single-round case, we substantially improve on previously best known approximation guarantees for both identical and unrelated processors. Moreover, we conduct an experimental analysis and compare the performance of our algorithms against a fast heuristic and a lower bound on the optimal solution, thus demonstrating their promising practical performance
    • …
    corecore