881 research outputs found

    Parallel-Machine Scheduling Problems with Past-Sequence-Dependent Delivery Times and Aging Maintenance

    Get PDF
    We consider parallel-machine scheduling problems with past-sequence-dependent (psd) delivery times and aging maintenance. The delivery time is proportional to the waiting time in the system. Each machine has an aging maintenance activity. We develop polynomial algorithms to three versions of the problem to minimize the total absolute deviation of job completion times, the total load, and the total completion time

    Scheduling Jobs and a Variable Maintenance on a Single Machine with Common Due-Date Assignment

    Get PDF
    We investigate a common due-date assignment scheduling problem with a variable maintenance on a single machine. The goal is to minimize the total earliness, tardiness, and due-date cost. We derive some properties on an optimal solution for our problem. For a special case with identical jobs we propose an optimal polynomial time algorithm followed by a numerical example

    Single machine scheduling with general positional deterioration and rate-modifying maintenance

    Get PDF
    We present polynomial-time algorithms for single machine problems with generalized positional deterioration effects and machine maintenance. The decisions should be taken regarding possible sequences of jobs and on the number of maintenance activities to be included into a schedule in order to minimize the overall makespan. We deal with general non-decreasing functions to represent deterioration rates of job processing times. Another novel extension of existing models is our assumption that a maintenance activity does not necessarily fully restore the machine to its original perfect state. In the resulting schedules, the jobs are split into groups, a particular group to be sequenced after a particular maintenance period, and the actual processing time of a job is affected by the group that job is placed into and its position within the group

    Due-Window Assignment and Scheduling with Multiple Rate-Modifying Activities under the Effects of Deterioration and Learning

    Get PDF
    This paper discusses due-window assignment and scheduling with multiple rate-modifying activities. Multiple types of rate-modifying activities are allowed to perform on a single machine. The learning effect and job deterioration are also integrated concurrently into the problem which makes the problem more realistic. The objective is to find jointly the optimal location to perform multiple rate-modifying activities, the optimal job sequence, and the optimal location and size of the due window to minimize the total earliness, tardiness, and due-window-related costs. We propose polynomial time algorithms for all the cases of the problem under study

    Single-Machine Scheduling with Aging Effects and Optional Maintenance Activity Considerations

    Get PDF
    This paper explores a single-machine scheduling with aging effects and the problem regarding optional maintenance activity assignment. The jobs’ processing time is assumed to follow a power position-dependent aging model. The optional maintenance activity refers to the situation in which the maintenance activity can be scheduled immediately after processing of any job has been completed except for the last job and the duration of maintenance activity can be of any value from zero to a fixed time interval. A recovery function is proposed to reflect the efficiency of the machine or worker which is improved. The objective of this study is to decide whether and when to implement the maintenance activity into the job sequence, how long the duration of maintenance activity is, and how to schedule so as to minimize the makespan. Once the duration of maintenance activity is known, we introduce an efficient solution for this problem. In addition, when the maintenance activity is completely performed, we showed that the optimal policy is to schedule the maintenance activity in the middle of the task sequence and optimally solved it by lower order algorithm. Finally, we extend the problem to the case of multiple maintenance activities which are completely performed. Hence, the problem is regarded as polynomial time solvable

    Comparison of new metaheuristics, for the solution of an integrated jobs-maintenance scheduling problem

    Get PDF
    This paper presents and compares new metaheuristics to solve an integrated jobs-maintenance scheduling problem, on a single machine subjected to aging and failures. The problem, introduced by Zammori et al. (2014), was originally solved using the Modified Harmony Search (MHS) metaheuristic. However, an extensive numerical analysis brought to light some structural limits of the MHS, as the analysis revealed that the MHS is outperformed by the simpler Simulated Annealing by Ishibuchi et al. (1995). Aiming to solve the problem in a more effective way, we integrated the MHS with local minima escaping procedures and we also developed a new Cuckoo Search metaheuristic, based on an innovative Levy Flight. A thorough comparison confirmed the superiority of the newly developed Cuckoo Search, which is capable to find better solutions in a smaller amount of time. This an important result, both for academics and practitioners, since the integrated job-maintenance scheduling problem has a high operational relevance, but it is known to be extremely hard to be solved, especially in a reasonable amount of time. Also, the developed Cuckoo Search has been designed in an extremely flexible way and it can be easily readapted and applied to a wide range of combinatorial problems. (C) 2018 Elsevier Ltd. All rights reserved

    Minimizing Total Earliness and Tardiness for Common Due Date Single-Machine Scheduling with an Unavailability Interval

    Get PDF
    This paper addresses the problem of scheduling n independent jobs on a single machine with a fixed unavailability interval, where the aim is to minimize the total earliness and tardiness (TET) about a common due date. Two exact methods are proposed for solving the problem: mixed integer linear programming formulations and a dynamic programming based method. These methods are coded and tested intensively on a large data set and the results are analytically compared. Computational experiments show that the dynamic programming method is efficient in obtaining the optimal solutions and no problems due to memory requirement

    Common due date early

    Get PDF
    Ankara : The Department of Industrial Engineering and the Graduate School of Engineering and Science of Bilkent University, 2013.Thesis (Master's) -- Bilkent University, 2013.Includes bibliographical references leaves 91-96.This study considers a scheduling problem with position-dependent deteriorating jobs and a maintenance activity in a single machine. Even in the absence of maintenance activity and deterioration problem is NP-hard. A solution comprises the following: (i) positions of jobs, (ii) the position of the maintenance activity, (iii) starting time of the first job in the schedule. After the maintenance activity, machine will revert to its initial condition and deterioration will start anew. The objective is to minimize the total weighted earliness and tardiness costs. Jobs scheduled before (after) the due-date are penalized according to their earliness (tardiness) value. Polynomial (O(n log n)) time solutions are provided for some special cases. No polynomial solution exists for instances with tight due-dates. We propose a mixed integer programming model and efficient algorithms for the cases where mathematical formulation is not efficient in terms of computational time requirements. Computational results show that the proposed algorithms perform well in terms of both solution quality and computation time.Şirvan, FatmaM.S

    Optimization of job shop scheduling with material handling by automated guided vehicle

    Get PDF
    Job Shop Scheduling with Material Handling has attracted increasing attention in both industry and academia, especially with the inception of Industry 4.0 and smart manufacturing. A smart manufacturing system calls for efficient and effective production planning. On a typical modern shop floor, jobs of various types follow certain processing routes through machines or work centers, and automated guided vehicles (AGVs) are utilized to handle the jobs. In this research, the optimization of a shop floor with AGV is carried out, and we also consider the planning scenario under variable processing time of jobs. The goal is to minimize the shop floor production makespan or other specific criteria correlated with makespan, by scheduling the operations of job processing and routing the AGVs. This dissertation includes three research studies that will constitute my doctoral work. In the first study, we discuss a simplified case in which the scheduling problem is reformulated into a vehicle dispatching (assignment) problem. A few AGV dispatching strategies are proposed based on the deterministic optimization of network assignment problems. The AGV dispatching strategies take future transportation requests into consideration and optimally configure transportation resources such that material handling can be more efficient than those adopting classic AGV assignment rules in which only the current request is considered. The strategies are demonstrated and validated with a case study based on a shop floor in literature and compared to classic AGV assignment rules. The results show that AGV dispatching with adoption of the proposed strategy has better performance on some specific criterions like minimizing job waiting time. In the second study, an efficient heuristic algorithm for classic Job Shop Scheduling with Material Handling is proposed. Typically, the job shop scheduling problem and material handling problem are studied separately due to the complexity of both problems. However, considering these two types of decisions in the same model offers benefits since the decisions are related to each other. In this research, we aim to study the scheduling of job operations together with the AGV routing/scheduling, and a formulation as well as solution techniques are proposed. The proposed heuristic algorithm starts from an optimal job shop scheduling solution without limiting the size of AGV fleet, and iteratively reduces the number of available vehicles until the fleet size is equal to the original requirements. The computational experiments suggest that compared to existing solution techniques in literature, the proposed algorithm can achieve comparable solution quality on makespan with much higher computational efficiency. In the third study, we take the variability of processing time into consideration in optimizing job shop scheduling with material handling. Variability caused by random effects and deterioration is discussed, and a series of models are developed to accommodate random and deteriorating processing time respectively. With random processing time, the model is formulated as a Stochastic Programming Job Shop Scheduling with Material Handling model, and with deteriorating processing time the model can be nonlinear under specific deteriorating functions. Based on a widely adopted dataset in existing literature, the stochastic programming model were solved with Pyomo, and models with deterioration were linearized and solved with CPLEX. By considering variable processing time, the JSSMH models can better adapt to real production scenarios