319 research outputs found
Parameterized complexity of machine scheduling: 15 open problems
Machine scheduling problems are a long-time key domain of algorithms and
complexity research. A novel approach to machine scheduling problems are
fixed-parameter algorithms. To stimulate this thriving research direction, we
propose 15 open questions in this area whose resolution we expect to lead to
the discovery of new approaches and techniques both in scheduling and
parameterized complexity theory.Comment: Version accepted to Computers & Operations Researc
Scheduling Bidirectional Traffic on a Path
We study the fundamental problem of scheduling bidirectional traffic along a
path composed of multiple segments. The main feature of the problem is that
jobs traveling in the same direction can be scheduled in quick succession on a
segment, while jobs in opposing directions cannot cross a segment at the same
time. We show that this tradeoff makes the problem significantly harder than
the related flow shop problem, by proving that it is NP-hard even for identical
jobs. We complement this result with a PTAS for a single segment and
non-identical jobs. If we allow some pairs of jobs traveling in different
directions to cross a segment concurrently, the problem becomes APX-hard even
on a single segment and with identical jobs. We give polynomial algorithms for
the setting with restricted compatibilities between jobs on a single and any
constant number of segments, respectively
Competitive-Ratio Approximation Schemes for Minimizing the Makespan in the Online-List Model
We consider online scheduling on multiple machines for jobs arriving
one-by-one with the objective of minimizing the makespan. For any number of
identical parallel or uniformly related machines, we provide a
competitive-ratio approximation scheme that computes an online algorithm whose
competitive ratio is arbitrarily close to the best possible competitive ratio.
We also determine this value up to any desired accuracy. This is the first
application of competitive-ratio approximation schemes in the online-list
model. The result proves the applicability of the concept in different online
models. We expect that it fosters further research on other online problems
A survey of scheduling problems with setup times or costs
Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe
Asymptotically Optimal Approximation Algorithms for Coflow Scheduling
Many modern datacenter applications involve large-scale computations composed
of multiple data flows that need to be completed over a shared set of
distributed resources. Such a computation completes when all of its flows
complete. A useful abstraction for modeling such scenarios is a {\em coflow},
which is a collection of flows (e.g., tasks, packets, data transmissions) that
all share the same performance goal.
In this paper, we present the first approximation algorithms for scheduling
coflows over general network topologies with the objective of minimizing total
weighted completion time. We consider two different models for coflows based on
the nature of individual flows: circuits, and packets. We design
constant-factor polynomial-time approximation algorithms for scheduling
packet-based coflows with or without given flow paths, and circuit-based
coflows with given flow paths. Furthermore, we give an -approximation polynomial time algorithm for scheduling circuit-based
coflows where flow paths are not given (here is the number of network
edges).
We obtain our results by developing a general framework for coflow schedules,
based on interval-indexed linear programs, which may extend to other coflow
models and objective functions and may also yield improved approximation bounds
for specific network scenarios. We also present an experimental evaluation of
our approach for circuit-based coflows that show a performance improvement of
at least 22% on average over competing heuristics.Comment: Fixed minor typo
Complexity of scheduling multiprocessor tasks with prespecified processor allocations
We investigate the computational complexity of scheduling multiprocessor tasks with prespecified processor allocations. We consider two criteria: minimizing schedule length and minimizing the sum of the task completion times. In addition, we investigate the complexity of problems when precedence constraints or release dates are involved
Order Acceptance and Scheduling: A Taxonomy and Review
Over the past 20 years, the topic of order acceptance has attracted considerable attention from those who study scheduling and those who practice it. In a firm that strives to align its functions so that profit is maximized, the coordination of capacity with demand may require that business sometimes be turned away. In particular, there is a trade-off between the revenue brought in by a particular order, and all of its associated costs of processing. The present study focuses on the body of research that approaches this trade-off by considering two decisions: which orders to accept for processing, and how to schedule them. This paper presents a taxonomy and a review of this literature, catalogs its contributions and suggests opportunities for future research in this area
Clips: a capacity and lead time integrated procedure for scheduling.
We propose a general procedure to address real life job shop scheduling problems. The shop typically produces a variety of products, each with its own arrival stream, its own route through the shop and a given customer due date. The procedure first determines the manufacturing lot sizes for each product. The objective is to minimize the expected lead time and therefore we model the production environment as a queueing network. Given these lead times, release dates are set dynamically. This in turn creates a time window for every manufacturing order in which the various operations have to be sequenced. The sequencing logic is based on a Extended Shifting Bottleneck Procedure. These three major decisions are next incorporated into a four phase hierarchical operational implementation scheme. A small numerical example is used to illustrate the methodology. The final objective however is to develop a procedure that is useful for large, real life shops. We therefore report on a real life application.Model; Models; Applications; Product; Scheduling;
- …