    The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review

    Get PDF
    Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe

    Project scheduling under undertainty – survey and research potentials.

    Get PDF
    The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, that is gradually resolved during project execution. In this survey we review the fundamental approaches for scheduling under uncertainty: reactive scheduling, stochastic project scheduling, stochastic GERT network scheduling, fuzzy project scheduling, robust (proactive) scheduling and sensitivity analysis. We discuss the potentials of these approaches for scheduling projects under uncertainty.Management; Project management; Robustness; Scheduling; Stability;

    AI and OR in management of operations: history and trends

    Get PDF
    The last decade has seen a considerable growth in the use of Artificial Intelligence (AI) for operations management with the aim of finding solutions to problems that are increasing in complexity and scale. This paper begins by setting the context for the survey through a historical perspective of OR and AI. An extensive survey of applications of AI techniques for operations management, covering a total of over 1200 papers published from 1995 to 2004 is then presented. The survey utilizes Elsevier's ScienceDirect database as a source. Hence, the survey may not cover all the relevant journals but includes a sufficiently wide range of publications to make it representative of the research in the field. The papers are categorized into four areas of operations management: (a) design, (b) scheduling, (c) process planning and control and (d) quality, maintenance and fault diagnosis. Each of the four areas is categorized in terms of the AI techniques used: genetic algorithms, case-based reasoning, knowledge-based systems, fuzzy logic and hybrid techniques. The trends over the last decade are identified, discussed with respect to expected trends and directions for future work suggested

    The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling

    Get PDF
    Over the past few years growing global competition has forced the manufacturing industries to upgrade their old production strategies with the modern day approaches. As a result, recent interest has been developed towards finding an appropriate policy that could enable them to compete with others, and facilitate them to emerge as a market winner. Keeping in mind the abovementioned facts, in this paper the authors have proposed an integrated process planning and scheduling model inheriting the salient features of outsourcing, and leagile principles to compete in the existing market scenario. The paper also proposes a model based on leagile principles, where the integrated planning management has been practiced. In the present work a scheduling problem has been considered and overall minimization of makespan has been aimed. The paper shows the relevance of both the strategies in performance enhancement of the industries, in terms of their reduced makespan. The authors have also proposed a new hybrid Enhanced Swift Converging Simulated Annealing (ESCSA) algorithm, to solve the complex real-time scheduling problems. The proposed algorithm inherits the prominent features of the Genetic Algorithm (GA), Simulated Annealing (SA), and the Fuzzy Logic Controller (FLC). The ESCSA algorithm reduces the makespan significantly in less computational time and number of iterations. The efficacy of the proposed algorithm has been shown by comparing the results with GA, SA, Tabu, and hybrid Tabu-SA optimization methods

    Intelligent systems in manufacturing: current developments and future prospects

    Get PDF
    Global competition and rapidly changing customer requirements are demanding increasing changes in manufacturing environments. Enterprises are required to constantly redesign their products and continuously reconfigure their manufacturing systems. Traditional approaches to manufacturing systems do not fully satisfy this new situation. Many authors have proposed that artificial intelligence will bring the flexibility and efficiency needed by manufacturing systems. This paper is a review of artificial intelligence techniques used in manufacturing systems. The paper first defines the components of a simplified intelligent manufacturing systems (IMS), the different Artificial Intelligence (AI) techniques to be considered and then shows how these AI techniques are used for the components of IMS

    Time-Cost Tradeoff and Resource-Scheduling Problems in Construction: A State-of-the-Art Review

    Get PDF
    Duration, cost, and resources are defined as constraints in projects. Consequently, Construction manager needs to balance between theses constraints to ensure that project objectives are met. Choosing the best alternative of each activity is one of the most significant problems in construction management to minimize project duration, project cost and also satisfies resources constraints as well as smoothing resources. Advanced computer technologies could empower construction engineers and project managers to make right, fast and applicable decisions based on accurate data that can be studied, optimized, and quantified with great accuracy. This article strives to find the recent improvements of resource-scheduling problems and time-cost trade off and the interacting between them which can be used in innovating new approaches in construction management. To achieve this goal, a state-of-the-art review, is conducted as a literature sample including articles implying three areas of research; time-cost trade off, constrained resources and unconstrained resources. A content analysis is made to clarify contributions and gaps of knowledge to help suggesting and specifying opportunities for future research

    Mitigating Space Industry Supply Chain Risk Thru Risk-Based Analysis

    Get PDF
    Using risk-based analysis to consider supply chain disruptions and uncertainty along with potential mitigation strategies in the early stages of space industry projects can be used avoid schedule delays, cost overruns, and lead to successful project outcomes. Space industry projects, especially launch vehicles, are complicated assemblies of high-technology and specialized components. Components are engineered, procured, manufactured, and assembled for specific missions or projects, unlike make-to-stock manufacturing where assemblies are produced at a mass production rate for customers to choose off the shelf or lot, like automobiles. The supply chain for a space industry project is a large, complicated web where one disruption, especially for sole-sourced components, could ripple through the project causing delays at multiple project milestones. This ripple effect can even cause the delay or cancelation of the entire project unless project managers develop and employ risk mitigations strategies against supply chain disruption and uncertainty. The unpredictability of when delays and disruptions may occur makes managing these projects extremely difficult. By using risk-based analysis, project managers can better plan for and mitigate supply chain risk and uncertainty for space industry projects to better manage project success. Space industry project supply chain risk and uncertainty can be evaluated through risk assessments at major project milestones and during the procurement process. Mitigations for identified risks can be evaluated and implemented to better manage project success. One mitigation strategy to supply chain risk and uncertainty is implementing a dual or multi-supplier sourcing procurement strategy. This research explores using a risk-based analysis to identify where this mitigation strategy can be beneficial for space industry projects and how its implementation affects project success. First a supply chain risk assessment and mitigation decision tool will be used at major project milestones to show where a multi-sourcing strategy may be beneficial. Next, updated supplier quote evaluation tools will confirm the usage of multiple suppliers for procurement. Modeling and simulation are then used to show the impact of that strategy on the project success metrics of cost and schedule

    The "fuzzy front end" of innovation

    Get PDF
    The fast transformation of technologies into new products or processes is one of the core challenges for any technology-based enterprise. Within the innovation process, we believe, the early phases (fuzzy front end) to have the highest impact on the whole process and the result (Input-Output Process), since it will influence the design and total costs of the innovation extremely. However the Fuzzy Front End is unfortunately the least-well structured part of the innovation process, both in theory and in practice. The focus of the present chapter is on methods and tools to manage the fuzzy front end of the innovation process. Firstly, the activities, characteristics, and challenges of the front end are described. Secondly, a framework of the application fields for different methods and tools is presented: Since a product upgrade requires a different approach compared to radical innovation, where the market is unknown and a new technology is applied, we believe such a framework to be useful for practitioners. Thirdly, a selection of methods and tools that can be applied to the fuzzy front end are presented and allocated within the framework. The methods selected here address process improvements, concept generation, and concept testing. --fuzzy front end,innovation management,stage-gate process,frontloading,triz,dsm-matrix,lead user

    Fuzzy uncertainty modelling for project planning; application to helicopter maintenance

    Get PDF
    Maintenance is an activity of growing interest specially for critical systems. Particularly, aircraft maintenance costs are becoming an important issue in the aeronautical industry. Managing an aircraft maintenance center is a complex activity. One of the difficulties comes from the numerous uncertainties that affect the activity and disturb the plans at short and medium term. Based on a helicopter maintenance planning and scheduling problem, we study in this paper the integration of uncertainties into tactical and operational multiresource, multi-project planning (respectively Rough Cut Capacity Planning and Resource Constraint Project Scheduling Problem). Our main contributions are in modelling the periodic workload on tactical level considering uncertainties in macro-tasks work contents, and modelling the continuous workload on operational level considering uncertainties in tasks durations. We model uncertainties by a fuzzy/possibilistic approach instead of a stochastic approach since very limited data are available. We refer to the problems as the Fuzzy RoughCut Capacity Problem (FRCCP) and the Fuzzy Resource Constraint Project Scheduling Problem (RCPSP).We apply our models to helicopter maintenance activity within the frame of the Helimaintenance project, an industrial project approved by the French Aerospace Valley cluster which aims at building a center for civil helicopter maintenance

    Projects Never Fail: A Critical Review on Estimation of Project Scheduling and Project Costing

    Get PDF
    Uncertainty remains common in all projects. It is need to realize this uncertainty and have to minimize the effect of this uncertainty to achieve better project outcomes. To realize the project on truthful base it is required to develop project schedule and estimate project costing on reality bases. A lot of project scheduling and costing techniques and tools are used to measure the accuracy. The new systematic techniques increase project outcomes and also reduce the uncertainty from the projects.  This study will leads to examine thoroughly project scheduling and project costing. Then this study will guide project managers how to develop a project schedule and what factors are effecting on the project scheduling and a sample project schedule will also provide for project managers and students of project management. After that the major sources of project costing and the method to calculate the project cost will also provide. And the sample project costing sheet is also develop in this study. Both project scheduling and project costing will develop the professionalism among project managers and students of project managers which they can never think before this study and also enhance project outcomes. Keywords: Project Scheduling, Project Costing, Uncertainty Handling and Project Succes
    • 