21 research outputs found

    LHCb Upgraded RICH 1 Engineering Design Review Report

    Get PDF
    During the Long Shutdown 2 of the LHC, the LHCb collaboration will replace the upstream Ring Imaging Cherenkov detector (RICH 1). The magnetic shield of the current RICH 1 will be modified, new spherical and plane mirrors will be installed and a new gas enclosure will be manufactured. New photon detectors (multianode photomultiplier tubes) will be used and these, together with their readout electronics, require a new mechanical support system. This document describes the new optical arrangement of RICH 1, its engineering design, installation and alignment. A summary of the project schedule and institute responsibilities is provided

    LHCb Upgraded RICH 1 Engineering Design Review Report

    Get PDF
    During the Long Shutdown 2 of the LHC, the LHCb collaboration will replace the upstream Ring Imaging Cherenkov detector (RICH 1). The magnetic shield of the current RICH 1 will be modified, new spherical and plane mirrors will be installed and a new gas enclosure will be manufactured. New photon detectors (multianode photomultiplier tubes) will be used and these, together with their readout electronics, require a new mechanical support system. This document describes the new optical arrangement of RICH 1, its engineering design, installation and alignment. A summary of the project schedule and institute responsibilities is provided

    The LHCb upgrade I

    No full text
    International audienceThe LHCb upgrade represents a major change of the experiment. The detectors have been almost completely renewed to allow running at an instantaneous luminosity five times larger than that of the previous running periods. Readout of all detectors into an all-software trigger is central to the new design, facilitating the reconstruction of events at the maximum LHC interaction rate, and their selection in real time. The experiment's tracking system has been completely upgraded with a new pixel vertex detector, a silicon tracker upstream of the dipole magnet and three scintillating fibre tracking stations downstream of the magnet. The whole photon detection system of the RICH detectors has been renewed and the readout electronics of the calorimeter and muon systems have been fully overhauled. The first stage of the all-software trigger is implemented on a GPU farm. The output of the trigger provides a combination of totally reconstructed physics objects, such as tracks and vertices, ready for final analysis, and of entire events which need further offline reprocessing. This scheme required a complete revision of the computing model and rewriting of the experiment's software
    corecore